Midterm Review 28-29/05/2015 David Tshilumba ESR3.3, WP3.

Slides:



Advertisements
Similar presentations
FINAL FOCUS: COMBINATION OF PRE ISOLATOR AND ACTIVE STABILISATION K. Artoos, C. Collette, R. Leuxe, C.Eymin, P. Fernandez, S. Janssens * The research leading.
Advertisements

Solomon William KAMUGASA
Silvia Zorzetti. PACMAN CLICScientific ProjectThe Team PACMAN (Particle Accelerator Components Metrology and Alignment to the Nanometer Scale) Ph.D. training.
Support and actuation of the segmented primary mirror of the E-ELT Dr.ir. Gert Witvoet.
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
1/20 New magnetic test bench for measuring closed magnet structures J. Campmany, L. Ribó, C. Colldelram, L. Nikitina, F. Becheri, G. Cuní,
Pre-isolator Update 18 th MDI Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist December 17, 2010.
Simulations and measurements of the pre-isolator test set-up WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist November 9, 2010.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Design of a compact AFM scanner
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
Midterm Review 28-29/05/2015 Iordan Doytchinov ESR3.1, WP3 1.
Vasileios Vlachakis Early Stage Researcher 1.3, Work Package 1 Mid-Term Review 28-19/05/2015.
LASER AND ADVANCES IN METROLOGY
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1 Nanopositioning of the main linac quadrupole as means of laboratory pre-alignment David Tshilumba, Kurt Artoos, Stef Janssens D. Tshilumba, CERN, 03.
Applied Precision Design 1 of 8 Strictly Confidential HIGH TEMP ROTARY SPINDLE IN VACCUM MULTI-AXIS SHUTTER MECHANISM RELIABILITY CYCLING TEST-BED MECHANISM.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Uncertainty issues in Micro/Nano Manipulation by Parallel Manipulator
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Midterm Review 28-29/05/2015 Silvia ZORZETTI ESR4.1, WP4 1.
ESR 3.1 Introduction Iordan Doytchinov
MECHANICAL STABILIZATION AND POSITIONING OF CLIC (MAIN BEAM) QUADRUPOLES WITH SUB- NANOMETRE RESOLUTION K. Artoos, C. Collette **, M. Esposito, P. Fernandez.
Vasileios Vlachakis Early Stage Researcher 1.3, Work Package 1 Mid-Term Review 28-19/05/2015.
Status of training program N. Catalán Lasheras
November : PACMAN Kick-off Meeting Introduction to Work Package 3: “Precision mechanics and stabilization” Michele Modena - CERN.
CARE / ELAN / EUROTeV Feedback Loop on a large scale quadrupole prototype Laurent Brunetti* Jacques Lottin**
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
PROGRESS ON THE CLIC MBQ STABILIZATION R&D K. Artoos, C. Collette **, M. Esposito, P. Fernandez Carmona, M. Guinchard, S. Janssens*, R. Leuxe, R. Morón.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
RECENT EXPERIMENTAL RESULTS ON NON- MAGNETIC VIBRATION ISOLATION Christophe Collette Credits to: David Tshilumba, Stef Janssens,
STABILISATION AND PRECISION POINTING QUADRUPOLE MAGNETS IN THE COMPACT LINEAR COLLIDER S. Janssens, P. Fernandez Carmona, K. Artoos, C. Collette, M. Guinchard.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
NANO-POSITIONING POSSIBILITIES FOR FUTURE ACCELERATOR MAGNETS K. Artoos, 28 November 2014 K. Artoos, C. Collette, M. Esposito, P. Fernandez Carmona, M.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals.
3 Months Viva OUTLINE What is CLIC and PACMAN projects - Why PACMAN - what is the PACMAN challenge? What is project 3.1 of PACMAN PhD Thesis - Thesis subject.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
PACMAN : technical objectives Hélène Mainaud Durand.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
H. MAINAUD DURAND PACMAN training network A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific.
Nano stabilisation studies for CLIC
David Tshilumba ESR3.3, WP3.
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
Vasileios Vlachakis 28-19/05/2015 Mid-Term Review
CLIC magnets precise positioning
Orbit Control For Diamond Light Source
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Ddd 4-Slides Challenge Silvia Zorzetti.
Dead zone analysis of ECAL barrel modules under static and dynamic loads for ILD Thomas PIERRE-EMILE, Marc ANDUZE– LLR.
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
By Arsalan Jamialahmadi
Fixed Support Design & Testing
Presentation transcript:

Midterm Review 28-29/05/2015 David Tshilumba ESR3.3, WP3

Background /  MSc in Mechanical engineering from University of Brussels (André Jaumotte Award)  Master thesis: “Contrôle des électro-aimants finaux d’un collisionneur linéaire”  Member of LSC (LIGO Scientific Collaboration)  Main author of 1 article, Co-author of 2 articles published in refereed journals and 3 publications in conference proceedings  LIGO:  SLAC: 2

ESR3.3, WP3 /  Contract start date: 1 st April 2014  PACMAN subject: Nano-Positioning of the main LINAC quadrupole as means of laboratory pre-alignment  PhD Institution: Delft University of Technology  Secondment: Delft University + TNO (6M ) David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 CERN SupervisorsKurt ARTOOS, Hélène MAINAUD DURAND Academic supervisorsProf. Just HERDER, Prof. Jo SPRONCK Industry supervisorDr. Stefan KUIPER 3

PhD thesis/  Starting date: 1 st April 2014  Thesis title: Nano-Positioning of the main LINAC quadrupole as means of laboratory pre-alignment  Statuts: Admitted to the doctoral school (Go/No Go meeting)  Credits: 45 GS credits are required; 12.5 GS credits acquired. David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 4

Project /  To upgrade the existing type 1 prototype for nanopositioning and vibration isolation  Cross check between different components  To study the possibility to increase the range of the nanopositioning stage Objectives Piezo stack actuator: Stiffness: 480 N/µm Stroke: 15 µm Resolution: 0.15 nm Flexural joints: Axial stiffness: 300 N/µm Rotational stiffness: 220 Nm/rad David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 5

State of the art Typical applications Atomic force microscopy Semiconductor test equipment Scanning interferometry ParametersValue Resolution  1nm Travel 1  m up to 300  m Stiffness≤10N/μm Admissible payload≤10kg Dynamic force capacity ≤100N Typical specifications David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 6

State of the art Performances: Range: 10mm x 10mm Parasitic in-plane rotation: ≤ 100  rad Resolution: ≤4nm Low stiffness David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 Courtesy of S.Awtar, G. Parmar 7

Research gap / Study of an integrated positioning system with high stiffness (>100N/  m) capable of moving heavy loads (>100 kg) with high resolution (<1nm) over a large range (≥1mm) David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 ParametersValue Resolution<0.25nm Stroke± 3mm step displacement0.25 up to 50nm Roll angle < 100  rad Speed10μm/s Settling time t1->t25ms≤ts≤10ms Stiffness (vertical/lateral) 1/0.55 kN/μm Vertical force (dynamic) 50N Horizontal force (dynamic) 30N Functions : Nanopositioning Vibration isolation Alignment 8

Project / Range increase concept Possible monolithic design No friction No backlash No wear Avoid plastic deformation! n<1 Stiffness amplification Resolution improvement David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 Range increase concept: inverted lever mechanism 9

Project / Method followed David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/ Analytic simplified model (Matlab) 3D CAD modelling (CATIA-Smart Team) Static and dynamic Finite Element simulations (ANSYS) Finite Element simulation results + Full dynamic model Positioning control algorithms Experimental validation of positioning performances

Project / Tasks description Development of a long range actuator Requirements definition: March 15 Design of concept 1DOF: Aug 15 Performance characterization: Oct 15 Extrapolation to 2 DOFs: Sept 16 System review and upgrade: Apr 15 Positioning strategies comparison Positioning test in CMM David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 State of the art Adaptation of the type 1 setup of the PACMAN bench: Aug 15 PACMAN nano-positioning system 11

Project / Results Parasitic resonance modes Design target: 1st resonance ≥100Hz Unexpected eigen modes detected by EMA between 30Hz and 50Hz Suspect root cause: connection stiffness between components Bolting: up to 40% drop in eigen frequency Gluing: up to 8.5% drop in eigen frequency Courtesy of M. Guinchard David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Project / Results Parasitic resonance modes Further improvement: Monolithic base plate design Additional stiffeners Old plate (EMA) Upgraded plate (FEA) 30Hz52Hz 45Hz75Hz 52Hz114Hz Other root cause: variable contact on a supporting point modify interface with cam stage David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Project / Results Hz Hz Hz Hz Hz Hz 2 side mode + bend 1 Longitudinal + plate bend 3 Torsion David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/ Adjustable jack for system equilibrium Optimized finite element model (  1 hour) Bending of baseplate Lowest modes lateral and vertical components issue

Project / Results 1 Longitudinal mode 2 Side mode 3 Torsion Hz Hz Hz Hz Hz Hz David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/2015 Larger flat contact surface with ground Base plate reinforcement (longitudinal) Lowest mode in longitudinal direction Not an issue 15

Improvement: first lateral mode at 100Hz Project /  Results David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Project / Results Roll motion reduction: parallel kinematics Permissible roll displacement: 100μrad Aluminum eccentric shear pins 5.15μrad/μm coupling Alternative: rotational symmetry hinges 0.47μrad/μm coupling Features: Less components Tunable translational stiffness Design optimization required (Space availability) David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Training / Training in CATIA-SmartTeam Basic principles of metrology Experimental modal analysis Making Presentations CERN guide training Team building David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Secondment in TUDelft and TNO Training / Thesis background High performance mechatronic system design Modal analysis measurement on support structure of large mirror of a large telescope David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Conferences & workshop: PACMAN workshop, one presentation  MEDSI 2016 (Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation)  ICM 2016 (International Conference on Mechatronics)  ICMRE (International Conference on Mechatronics and Robotics Engineering)  ICMMR (International Conference on Mechanics and Mechatronics Research)  ICROM (International Conference on Robotics and Mechatronics ) Outreach & Dissemination / David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Networking Opportunities / ACTUATOR conference (May 2014) Precision Fair Eindhoven (November 2014) Secondment at TUDelft and TNO EUSPEN (European Society of Precision Engineering) David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Impact / Mechatronic system designer Modelling of complex mechanical assemblies Improve employability Networking David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Midterm Review 28-29/05/2015 Thank you for your attention

Project / Results Roll motion reduction: parallel kinematics Permissible roll displacement: 100μrad Rotational symmetry hinges 0.47μrad/μm coupling Lost motion: 5% (vertical) High resonance frequencies David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Low modes caused by unsupported corner Putting the system on the ground will help a lot Rigidifying the plate will not help sufficiently when posed on three points on the alignment system Sideplates are very useful to increase the longitudinal stiffness thanks to their lower connection to the base plate through the longitudinal profiles on it =>logitudinal mode at 95Hz. Project /  Results David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Making Presentations CERN guide training Team building Effective article and report writing Project management Time management Negotiating effectively Training / Transferable skills David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Project / Place in PACMAN David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/

Current system overview / David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/ Coarse stage (cams) locked after pre-alignment Resolution : 0.35µm Stroke: 3mm Fine stage (piezo stacks) Resolution: 0.15nm Stiffness : 480N/um (piezo) Useful Stroke: 5µm Limitations: precision of coarse stage (>10µm) insufficient stroke of fine stage for thermal load in tunnel ( >100µm) Increase of range of fine stage

Field gradients K for restoring force in quadrupole K=dBy/dx K=dBx/dy Beam trajectory technique Lorentz Force Control of beam oscillation Collision quality optimized CLIC: N ANO - POSITIONING Courtesy of J. Pfingstner D. Tshilumba, Delft, 15 April 2015 Beam steering /

Nanopositioning / David TSHILUMBA, ESR3.3 PACMAN Mid-term review 28-29/05/ Type 1 magnet nano-positioning: Inter-pulse sequence 1234 Stage Time (ms) 0 t1 t2 20 Beam divided into trains Calculation of new positions by global controller Positioning step of magnet check of actual new position (machine protection)