COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Supply presentation FACELIFT. Who Are We ? Design and Architectural Studio Construction and Trade Company Service Center.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Tam Valley School Modernization - Phase 1 Summer 2011.
TEKTON INTERNATIONAL INC. ADT DEVELOPMENT PROJECT PRESENTS:
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Renting a Residence Section 6-5. Selecting a Rental Unit  A person who rents is called a tenant.  The person who rents the place to you is called a.
Edna Maguire School Modernization - Phase 1 Summer 2012.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
2013 FINANCIAL REPORT. Balance Sheet Summary As of December 31, 2013.
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
Chapter 19 Electrical Plans.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Elevations.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
HVACR116 – Trade Skills Mechanical Drawings.
Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
Housing Authority of Cook County Rental Assistance Demonstration Program Richard J. Monocchio – Executive Director.
LAYOUT OF COMMERCIAL BUILDINGS
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
United Nations Workshop on Revision 3 of Principles and Recommendations for Population and Housing Censuses and Evaluation of Census Data, Amman 19 – 23.
WE ARE MOVING! MOVING DATE: NEW OFFICE: COMPANY NAME.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
EE4503 Electrical Systems Design
Affordable housing project
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
COZYEON Residence Main facilities gallery. Corridor of each floor.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
White Pigeon Community Schools
Building Services Summer 2016 Update
Fun Facts: James M. Bennett High School
Addition of Fire Alarm system. None existing.
Assembly And Installation Of Ikea Kitchen Cabinets
Construction Tools, Electrical and Plumbing Suppliers
Introduction BY URUSHA KARMACHARYA
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
ISA Prime Developments
DOWNTOWN TAMPA HISTORIC LANDMARK
INTD 405 Modern Practices in Interior Design PLANS
INTD 405 Modern Practices in Interior Design PLANS
Chapter 19 Electrical Plans.
Managing Office Property
M&E SYSTEM.
2007 Bond Issue Capital Improvement Program
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Building standards Mr. Da Silva.
Presentation transcript:

COUVA SHOPPING CENTRE

EXISTING LAYOUT

ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE EXPANSION AND UPGRADE MEET THE NEEDS OF EXISTING TENANTS MAKE FIRST FLOOR AREAS MORE (LETTABLE) ACCESSIBLE MINIMISE (OR ELIMINATE) LOSS OF INCOME DURING CONSTRUCTION

EXISTING LAYOUT LETTABLE SPACE75,400 SQ. FT. INCOME FROM LETTABLE SPACE$????? PER MNTH CAR PARKING AVAILABLE175UNITS

PROPOSED LAYOUT LETTABLE SPACE140,800 SQ.FT. 87% INCREASE 75,400 SQ. FT. PROJECTED INCOME FROM LETTABLE SPACE $1,126,000 PER MNTH CAR PARKING AVAILABLE 325 UNITS 86% INCREASE 175 UNITS

PROPOSED LAYOUT

PHASE 1A

STRUCTURAL – CLOSE UP FLOOR OPENING UPGRADE BACK STAIR REMOVE SOUTH WALL OPEN UP EAST WALL INTERIORS - RAIL ON SOUTH EDGE TEMPORARY SHOP FRONT ON SOUTH TENANT DIVISIONS, COUNTERS & PUBLIC FURNITURE FLOOR FINISHES CEILING FINISHES SERVICES - ELECTRICAL LIGHTING & POWER FIRE ALARM, COMMUNICATIONS & SECURITY AIR CONDITIONING & VENTILATION PLUMBING & COOKING GAS ESCALATOR & FREIGHT ELEVATOR

PHASE 1A FIGURES TOTAL AREA13,500 SQ. FT. BUDGET COST INCLUDING FEES$5,800,000 TIME FOR DESIGN2 MONTHS TIME OF CONSTRUCTION3 MONTHS ADDITIONAL INCOME$108,000 CONTRIBUTION TO MORTGAGE$ 56,000 CONCERNS: EFFECT ON TENANTS BELOW

PHASE 1B

STRUCTURAL – UPGRADE BACK STAIR OPEN UP EAST WALL INTERIORS - RAIL ON SOUTH EDGE TEMPORARY SHOP FRONT ON SOUTH PUBLIC TOILETS TENANT DIVISIONS, COUNTERS & PUBLIC FURNITURE FLOOR FINISHES CEILING FINISHES SERVICES - ELECTRICAL LIGHTING & POWER FIRE ALARM, COMMUNICATIONS & SECURITY AIR CONDITIONING & VENTILATION PLUMBING & COOKING GAS ESCALATOR

PHASE 1B FIGURES TOTAL AREA13,500 SQ. FT. BUDGET COST INCLUDING FEES$5,000,000 TIME FOR DESIGN1 MONTH TIME OF CONSTRUCTION3 MONTHS ADDITIONAL INCOME$54,000 CONTRIBUTION TO MORTGAGE$48,000 CONCERNS: EXISTING TENANTS WITHIN SPACE EFFECT ON SUPERMARKET BELOW

PHASE 1C

STRUCTURAL – OPEN UP (EXISTING) EAST WALL INTERIORS - SUPERMARKET UPGRADE TENANT DIVISIONS FLOOR FINISHES CEILING FINISHES SERVICES - ELECTRICAL LIGHTING & POWER FIRE ALARM, COMMUNICATIONS & SECURITY AIR CONDITIONING & VENTILATION PLUMBING

PHASE 1C FIGURES BUDGET COST INCLUDING FEES$3,000,000 TIME FOR DESIGN1 MONTH TIME OF CONSTRUCTION3 MONTHS ADDITIONAL INCOME$ 0.00 CONTRIBUTION TO MORTGAGE$29,000 CONCERNS: SUPERMARKET REQUIREMENTS EXISTING TENANTS WITHIN SPACE

PHASE 2

STRUCTURAL – DEMOLISH EXISTING BUILDING CONSTRUCT CAR PARK I INTERIORS - TENANT DIVISIONS FLOOR FINISHES CEILING FINISHES SERVICES - ELECTRICAL LIGHTING & POWER FIRE ALARM, COMMUNICATIONS & SECURITY AIR CONDITIONING & VENTILATION PLUMBING ELEVATOR

PHASE 2 FIGURES TOTAL AREA50,000SQ. FT. TENANTED AREA17,000SQ. FT. TOTAL CAR PARK AREA 33,000SQ. FT. NUMBER OF PARKING SPACES130 BUDGET COST INCLUDING FEES$15,000,000 TIME FOR DESIGN3 MONTHS TIME OF CONSTRUCTION7 MONTHS ADDITIONAL INCOME$153,000 CONTRIBUTION TO MORTGAGE$143,000 CONCERNS: EXISTING TENANTS (KFC) TO BE RELOCATED

PHASE 3a

PHASE 3A STRUCTURAL – CONSTRUCT NEW CAR PARK BUILDING INCLUDING BRIDGE TO EXISTING BUILDING INTERIORS - NIL OR MINOR SERVICES - ELECTRICAL LIGHTING & POWER FIRE ALARM, COMMUNICATIONS & SECURITY ELEVATOR

PHASE 3B

STRUCTURAL – DEMOLITION OF EXISTING BUILDING CONSTRUCT NEW BUILDING INCLUDING BRIDGE TO EXISTING BUILDING INTERIORS - MALL SHOP FRONTS TENANT DIVISIONS FLOOR FINISHES (Public Areas) CEILING FINISHES (Public Areas) SERVICES - ELECTRICAL LIGHTING & POWER FIRE ALARM, COMMUNICATIONS & SECURITY AIR CONDITIONING & VENTILATION PLUMBING

PHASE 3C

STRUCTURAL – DEMOLITION OF EXISTING BUILDING CONSTRUCT NEW BUILDING INCLUDING BRIDGE TO EXISTING BUILDING ENCLOSE ATRIUM INTERIORS - MALL SHOP FRONTS TENANT DIVISIONS FLOOR FINISHES CEILING FINISHES SERVICES - ELECTRICAL LIGHTING & POWER FIRE ALARM, COMMUNICATIONS & SECURITY AIR CONDITIONING & VENTILATION PLUMBING

PHASE 3 FIGURES TOTAL AREA35,000 SQ. FT. BUDGET COST INCLUDING FEES$55,000,000 TIME FOR DESIGN3 MONTHS TIME OF CONSTRUCTION7 MONTHS ADDITIONAL INCOME$280,000 CONTRIBUTION TO MORTGAGE$525,000 CONCERNS: EXISTING TENANTS TO BE RELOCATED EXISTING TENANTS WITHIN DEMOLISHED SPACE

Services infrastructure CHILLED WATER PLANT AND PIPING DISTRIBUTION UPGRADE OF ELECTRICAL PLANT EMERGENCY GENERATOR INSTALLATION INCLUDING FUEL STORAGE UPGRADE OF SEWAGE TREATMENT PLANT FIRE ALARMS AND FIRE FIGHTING INSTALLATIONS

PROPOSED LAYOUT

summary PHASE 1PHASE 2PHASE 3TOTAL 1 TOTAL AREA (SQ.FT.) 54,000 17,000 54, ,000 2 BUDGET COST INCLUDING FEES $ 13,800,000 $ 15,000,000 $ 70,000,000 $ 98,800,000 3 ADDITIONAL RENTAL INCOME $ 162,000 $ 153,000 $ 540,000 $ 855,000 4 CONTRIBUTION TO MORTGAGE $ 133,000 $ 143,000 $ 525,000 $ 801,000

NOTIONAL SCHEDULE

WHERE DO WE GO FROM HERE ???