Continuous Flow Mfg Skip-Lot Sampling Domenick Amato Frank Gomez Lynn Torbeck.

Slides:



Advertisements
Similar presentations
QUALITY CONTROL TOOLS FOR PROCESS IMPROVEMENT
Advertisements

Ch 12- Control Charts for Attributes
Introduction to Statistical Quality Control, 4th Edition Chapter 14 Lot-by-Lot Acceptance Sampling for Attributes.
4/24/2015IENG 486 Statistical Quality & Process Control 1 IENG Lecture 19 Introduction to Mil Std 105E.
Implement sampling procedures
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Example R-Chart.
ISQA 572/ 449 Models for Quality Control/ Process Control and Improvement Dr. David Raffo Tel: , Fax:
Quality Control Chapter 9- Lot-by-Lot Acceptance Sampling
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 4 Supplement Roberta.
Section 7 Acceptance Sampling
Acceptance Sampling Plans by Variables
1 IES 331 Quality Control Chapter 14 Acceptance Sampling for Attributes – Single Sampling Plan and Military Standard Week 13 August 30 – September 1, 2005.
G – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Acceptance Sampling Plans G For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management Chapter 3 Supplement Roberta Russell &
Acceptance Sampling Chapter 3 Supplement © 2014 John Wiley & Sons, Inc. - Russell and Taylor 8e.
BPT2423 – STATISTICAL PROCESS CONTROL
Acceptance Sampling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
15 Lot-by-Lot Acceptance Sampling for Attributes Chapter 15
Myth: “Acceptance sampling assures good quality.” Truth: Acceptance sampling provides confidence that p (the population fraction.
Chapter 10 Quality Control McGraw-Hill/Irwin
Business 205. Review Sampling Continuous Random Variables Central Limit Theorem Z-test.
Chapter 6 Hypotheses texts. Central Limit Theorem Hypotheses and statistics are dependent upon this theorem.
TM 720: Statistical Process Control Acceptance Sampling Plans
Lot-by-Lot Acceptance Sampling for Attributes
Acceptance Sampling Lot-by-lot Acceptance Sampling by AttributesLot-by-lot Acceptance Sampling by Attributes Acceptance Sampling SystemsAcceptance Sampling.
09/16/04SJSU Bus David Bentley1 Chapter 10S – Acceptance Sampling Definition, purpose, sampling plans, operating characteristic curve, AQL, LTPD,
An AQL System For Lot-By-Lot Acceptance Sampling By Attributes
Introduction to Statistical Quality Control, 4th Edition Chapter 15 Other Acceptance Sampling Techniques.
IES 331 Quality Control Chapter 15 Acceptance Sampling by Variables
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
Steps in Using the and R Chart
Statistical Process Control Chapters A B C D E F G H.
9/17/2015IENG 486 Statistical Quality & Process Control 1 IENG Lecture 18 Introduction to Acceptance Sampling, Mil Std 105E.
The Odds Are Against Auditing Statistical Sampling Plans
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10S Acceptance Sampling.
Chapter 13 Statistical Quality Control Method
Acceptance Sampling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing Coding Operations Section B 1.
Acceptance Sampling Outline Sampling Some sampling plans
Chapter 15Introduction to Statistical Quality Control, 6 th Edition by Douglas C. Montgomery. Copyright (c) 2009 John Wiley & Sons, Inc. 1 Chapter 15-
ADDITIONAL SAMPLING PROCEDURES Chapter 16. Introduction to Statistical Quality Control, 6 th Edition by Douglas C. Montgomery. Copyright (c) 2009 John.
Besterfield: Quality Control, 8 th ed..© 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Quality Control Chapter 10- Acceptance.
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
Acceptance Sampling Terminology
Acceptance Sampling Systems For Continuous Production and Variables
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 10S Acceptance Sampling.
Dr. Dipayan Das Assistant Professor Dept. of Textile Technology Indian Institute of Technology Delhi Phone:
1 SMU EMIS 7364 NTU TO-570-N MIL STD 105E Updated: Statistical Quality Control Dr. Jerrell T. Stracener, SAE Fellow.
Assignable variation Deviations with a specific cause or source. Click here for Hint assignable variation or SPC or LTPD?
Acceptable quality level (AQL) Proportion of defects a consumer considers acceptable. Click here for Hint AQL or producer’s risk or assignable variation?
Chapter 15Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc. 1.
Lot-by-Lot Acceptance Sampling for Attributes
LESSON 2 Statistical Sampling
acceptable quality level (AQL) Proportion of defects
Other Acceptance Sampling Techniques
Introduction to Variability
What will be covered? What is acceptance sampling?
The Certified Quality Process Handbook Chapter 18: Sampling
Presentation Overview
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Acceptance Sampling Outline Sampling Some sampling plans
What will be covered? What is acceptance sampling?
ACCEPTANCE SAMPLING FOR ATTRIBUTES
Acceptance Sampling May 2014 PDT155.
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Statistical Quality Control
Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Presentation transcript:

Continuous Flow Mfg Skip-Lot Sampling Domenick Amato Frank Gomez Lynn Torbeck

21 CFR (20) “Acceptance Criteria means the product specifications and acceptance/rejection criteria, such as acceptable quality level and unacceptable quality level with an associated sampling plan …” 210.3(20) “Acceptance Criteria means the product specifications and acceptance/rejection criteria, such as acceptable quality level and unacceptable quality level with an associated sampling plan …” 210.3(21) Representative samples 210.3(21) Representative samples

21 CFR Requirements: Requirements: 1.Representative samples 2.Number of containers to sample 3.Amount of material to be taken 4.Variability – Process average 5.Confidence levels 6.Past quality history

Continuous Flow Mfg How to define a continuous process? Types of processes? How to define a continuous process? Types of processes? How to define a “lot” or “batch” in a continuous flow process? How to define a “lot” or “batch” in a continuous flow process? Assumption of homogeneity of product? Assumption of homogeneity of product? Assumptions about defects? Assumptions about defects?

Types of Sampling Plans Variables Plans: Variables Plans: ANSI/ASQ Z1.9ANSI/ASQ Z1.9 Attribute Plans Attribute Plans ANSI/ASQ Z1.4ANSI/ASQ Z1.4 ISO 2859ISO 2859

Sampling Plans Defined Population of units, lots or batches Population of units, lots or batches AQL: Acceptable Quality Limit AQL: Acceptable Quality Limit LQ: Unacceptable Quality Limit LQ: Unacceptable Quality Limit Sample size Sample size Accept number Accept number Reject number Reject number

Risk Management “Producer’s Risk” The probability that a good lot is rejected by the customer. (Type I error or alpha) “Producer’s Risk” The probability that a good lot is rejected by the customer. (Type I error or alpha) “Consumer’s Risk” The probability that a bad lot is accepted by the customer. (Type II error or beta) “Consumer’s Risk” The probability that a bad lot is accepted by the customer. (Type II error or beta) Levels not fixed but common values are 5% and 10%. Levels not fixed but common values are 5% and 10%.

Assumptions for Sampling Representative samples Representative samples Beginning, middle and endBeginning, middle and end Top, middle and bottomTop, middle and bottom Every 30 minutes or 100 unitsEvery 30 minutes or 100 units Random Sampling – (difficult)Random Sampling – (difficult) Defects must be randomly distributed ! Defects must be randomly distributed ! Sample inspection is 100% Sample inspection is 100%

Reduced Testing 1. Smaller sample size. Using General Inspection Level I in place of Level II or III in Z Not inspecting all characteristics on the CoA or listed in the USP. 3. Can use reduced testing in Z Use the switching rules in Z1.4.

Skip-Lot Sampling Not all lots are tested. Not all lots are tested. Only a fraction of lots are inspected. Only a fraction of lots are inspected. Goal is to save money or time and still achieve quality products. Goal is to save money or time and still achieve quality products.

Types of Skip-Lot Sampling 1. Test every “n th ” lot, not random. 2. Test “i” lots, if all pass go to a fraction, “f”, of future lots. Select i and f in advance. Lots selected at random. 3. ASQ S1, i and f are determined from the data collected. Lots are selected at random using dice.

Assumptions for Skip-Lot Supplier and customer agree on a plan. Good communications. Supplier and customer agree on a plan. Good communications. Faith and trust in an honest supplier. Good relations. Faith and trust in an honest supplier. Good relations. Proven history of quality with a stable and continuous process. Proven history of quality with a stable and continuous process. Clear criteria for action plan. Clear criteria for action plan.

Discussion Topics Compendial requirements Compendial requirements Regulatory expectations Regulatory expectations Current state, pro/con/concerns Current state, pro/con/concerns Desired state for excipients Desired state for excipients Fraud, counterfeiting, adulteration Fraud, counterfeiting, adulteration Processes “Out of control.” Processes “Out of control.” Changes without notification Changes without notification

References NIST NIST ASQ (1996). ANSI/ASQ S1, “Attribute Skip-Lot Sampling Program.” ASQ (1996). ANSI/ASQ S1, “Attribute Skip-Lot Sampling Program.” Schilling, E. (1982). Acceptance Sampling in Quality Control, New York, NY: Marcel Dekker, pp Schilling, E. (1982). Acceptance Sampling in Quality Control, New York, NY: Marcel Dekker, pp Juran, J. and Godfrey, A. (1999). Juran’s Quality Handbook, Fifth Edition, pp , 46-32, New York: McGraw Hill. Juran, J. and Godfrey, A. (1999). Juran’s Quality Handbook, Fifth Edition, pp , 46-32, New York: McGraw Hill.