LHC Quality Assurance Working Group - M. Mottier September 2000.

Slides:



Advertisements
Similar presentations
Audiobooks on EBSCOhost. Agenda EBSCOhost interface Browsing Basic Searching Advanced Searching My EBSCOhost folder Checkout and download.
Advertisements

 Replace Information in () & underlined with Agency Specific Information  Replace Decision Tree & Category/Folder Examples with Agency Developed Ones.
JobTracker™ A Job Tracking System for Architects & Engineers Produced by LA Solutions.
Please read this before using presentation This presentation is based on content presented at the Registration of cranes.
QUME 185 File Management. 2 Where did I save it? Managing files and folders is one of the most important computer skills The essential skills: Create*
Toolbox Mirror -Overview Effective Distributed Learning.
7/13/2015 Scanning Supporting Documents for Transactions Cynthia Ghering October 13, 2010.
Introduction to INTTRA-Desktop Shipping Instructions Q
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
The Internet. What is the Internet?  The Internet is a network of networks.  It gives users access to a wide variety of information from millions of.
Home Media Network Hard Drive Training for Update to 2.0 By Erik Collett Revised for Firmware Update.
Java Programming, 3e Concepts and Techniques Chapter 3 Section 65 – Manipulating Data Using Methods – Java Applet.
Another Method to Open WebSpace as a Web Folder Alternative Method for Creating Web Folder in WebSpace, Slide 1Copyright © 2004, Jim Schwab, University.
Company Confidential Info Exchange Workflow Examples for External Users: Submittals Company Confidential.
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
Engineering Data Management System CERN Drawing Directory overview - Stephan Petit - CERN EST/ISS - LHC Auditorium :00 CERN DRAWING DIRECTORY.
Copyright © Eric Liria Web Site Builder This application allows you to build and manage web sites. It provides the following functionnalities: use.
1 JACoW Joint Accelerator Conferences Website Presented by J. Vigen on behalf of John Poole, JACoW.
Module 6 Securing Content. Module Overview Administering SharePoint Groups Implementing SharePoint Roles and Role Assignments Securing and Auditing SharePoint.
Diagnostics Clinical Information Management (CIM) Services Field Report: Implementation of CDISC ODM Michael Walter.
ISled V2 Captuvo Emulator Controller User Guide E Suzhou,HSM 9/6/2013.
CALLS FOR TENDER AND MARKET SURVEYS - ROLES AND PROCEDURES L.ANNILA, K.FORAZ PART 2. ROLE OF THE COMITE DE LECTURE.
Company Confidential Info Exchange Workflow Examples for External Users: Info Exchange Folders Company Confidential.
SharePoint Security Training Creating and Managing Users
Planned Document Management Improvements Rob McKercher, Iain Goodenow, George Angeli.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
National Oceanic and Atmospheric Administration User Group Presentation – Grantee Rollout September 21, 2005.
IFS Document Management
LSI Storage Repository Life Sciences Institute National University of Singapore M ark De Silva Lim Kuan Siong 5 th September 2012.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
NanoSearch DMS V2.3 Make our daily job became easy With Documents Management System.
EDMS/CDD Overview Stephan Petit - EST/ISS LHCb EDMS Seminar – Dec. 5 th, 2001 EDMS Doc EDMS/CDD Overview.
Links take you to…  Different slides in your presentation  A different PowerPoint presentation  Any program - (Word can be used for example to complete.
Copy of the from the secure website - click on the AccoridaLife.zip link.
Home page Web page link 1 Web page link 2Web page link 3Web page link 4.
The top four lines are required if you are coding in XHTML and want to validate. Copy and paste them as the top four lines in the code you are writing.
The overview How the open market works. Players and Bodies  The main players are –The component supplier  Document  Binary –The authorized supplier.
Review of the processes released in the framework of the MMP Goran Perinić.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Lesson Objectives 1) Review the steps involved in problem solving 2) Review the stages of the System Life Cycle 3) Describe what prototyping is and the.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
WHAT ARE THE STEPS TO CONNECT MY HP DESKJET 3520 TO WI-FI?
Business rules.
Objectives Create a folder in Google Drive.
Doing business with CERN Anders Unnervik
PROCEDURE FOR PURCHASING DRUGS
ISA 201 Intermediate Information Systems Acquisition
SIR Safety Information Registration Introduction for course authors Administrative Information Services HR Information Systems GS-AIS-HR.
Supplier Portal Self-Registration
The Writing Process.
Configuration Management and Prince2
TECHNICAL DESIGN OFFICE
You’ve created an e-Learning resource...
Getting Started with Vendor Pay Requests
Microsoft FrontPage 2003 Illustrated Complete
Zcash Mining – A Guide For Beginners. Zcash (also known as ZEC and seventeenth most valued cryptocurrency with market capitalization of $500 million)
Gmail Customer Support 24/7 Gmail related technical issues Instant solution by Certified Engineers quick tips for user's comfort ability. Gmail Customer.
Barbara Palmer APD Director
Flowserve Distributor Online Store & Portal
Nonconformance Tracking
Flowserve Distributor Online Store & Portal
Which Software?.
COMP 101 Introduction.
E. Manola-Poggioli 05 December 2001 EDMS doc
Create a Parent Portal Account
Proposals & Project Specifications
Subject Access Request received
WEDNESDAY, SEPTEMBER 19TH
Presentation transcript:

LHC Quality Assurance Working Group - M. Mottier September 2000

As-built Drawings LHC Quality Assurance Working Group - M. Mottier - September 2000 Page 2 Contents  Registration and archiving  Verification and approval  Confidentiality  Folder for As-Built drawings  Process step by step

As-built Drawings LHC Quality Assurance Working Group - M. Mottier - September 2000 Page 3 Registration and archiving (1) Two possible ways: 1It is done by the firm, using the Web interface of CDD 2It is done at CERN. The firms supplies the drawing files on a CD The Web is suitable if:  The firm has a fast Web connection  Strict confidentiality is not required It needs registration of the firm as a CDD user and training of one operator

As-built Drawings LHC Quality Assurance Working Group - M. Mottier - September 2000 Page 4 Registration and archiving (2) The CD is suitable in all cases where the Web is not practical  The firm copies the drawings on a CD  The CD is sent to CERN  Drawings are copied from the CD to CDD at CERN It needs a central service at CERN to do the registration and copying of the files

As-built Drawings LHC Quality Assurance Working Group - M. Mottier - September 2000 Page 5 Verification and approval Once in CDD, as-built drawings should be checked and approved like tender drawings:  A technical verification by a designer  An approval by the Project Engineer

As-built Drawings LHC Quality Assurance Working Group - M. Mottier - September 2000 Page 6 Confidentiality Confidentiality of the drawings supplied by a firm may be required, for example when the execution of a contract for prototypes is going on at the same time as a call for tender for a series production.  By default, firm drawings should be considered confidential, accessible only to authorized persons  The needs for confidentiality should be discussed when placing the contract

As-built Drawings LHC Quality Assurance Working Group - M. Mottier - September 2000 Page 7 Folder for As-Built drawings As built drawings should be placed in a drawing folder attached to the baseline and the technical specification The folder containing tender drawings should be named “TENDER DRAWINGS” The folder containing the production drawings should be named “AS-BUILT DRAWINGS” See the example on the next slide

As-built Drawings LHC Quality Assurance Working Group - M. Mottier - September 2000 Page 8