UNCLASSIFIED NDIA CPM 01/13/10 Page-1 Streamlining Program Reviews Terry Jaggers Principle Director, Systems Engineering Office of the Director, Defense.

Slides:



Advertisements
Similar presentations
1 Information Enterprise Architecture v September Walt Okon Senior Architect Engineer Senior Architect Engineer for Information Sharing Enterprise.
Advertisements

Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
AIR FORCE STUDIES BOARD 1 Optimizing U.S. Air Force and Department of Defense Review of Air Force Acquisition Programs RADM Rand Fisher, Chair Dr. Dan.
DoD Integrated Product Support Roadmap Tool
DoD Software Issues and Gap Identification Kristen Baldwin Deputy Director, Software Engineering and System Assurance OUSD(AT&L) April 18, 2007.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Systems Engineering in a System of Systems Context
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
1 Incremental Commitment Model as Applied to DoD Acquisition Insights from a Business Process Model of DoD Acquisition Policy and SE Guidance Dr. Judith.
ICBM Systems Directorate Minuteman III
M I S S I O N The Army SBIR program is designed to provide small, high-tech businesses the opportunity to propose innovative research and development solutions.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
New Employee Training Market Research
Program Visibility, Analysis, and Reporting (PVAR)
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
1 United States Army EVM and The Army: An Update Presented By: Keith Samuels.
1 Professional Development Discussion: OSD Study of Program Manager Training and Experience Mr. David Ahern Director, Portfolio Systems Acquisition OSD(AT&L)(A&T)(PSA)
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
Lyle Eesley Defense Acquisition University Director
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
Air Armament Center Mr. John Mistretta Technical Director, AAC/EN War-Winning Capabilities…On Time, On Cost Systems Engineering Update AAC.
Systems Engineering In Aerospace Theodora Saunders February AUTOMATION IN MANUFACTURING Leading-Edge Technologies and Application Fairfield University.
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of: 02 Mar 051 Partnering with Industry on System Safety & MIL-STD-882D.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
Independent Expert Program Review (IEPR) February 2006.
UNCLASSIFIED DISTRIBUTION STATEMENT A – Cleared for public release by OSR on Sep – SR case number 10-S-3203 Developmental Test & Evaluation Presented.
Transformation of a National Laboratory: ISMS Component Beth Streeper ISMS Program Manager Integrated Safety Management Workshop 2007 Brookhaven National.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Group Three Outbrief Team Members Michael BakerEglin 328 ARSG Tony BumbaloughAFRL/RXMT Scott FrostANSER Michael GanowskyBoeing- Mark GordonNCAT Jim LorenzeRockwell.
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
Power to the Edge A Net-Centric DoD NII/DoD CIO IT Acquisition Management Transformation Rapid Improvement Team (RIT) Principals Meeting November 18, 2003.
UNCLASSIFIED The Open Group 01/07/10 Page-1 Kick-off Meeting for The Open Group Acquisition Cyber Security Initiative Ms. Kristen Baldwin Director, Systems.
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Today’s Summary Tab 4 Tab 6 Tab 2 Tabs 3 and 5 Defense Acquisition
Requirements Executive Overview Workshop Requirements Management Certification Training Mr. Matt Ghormley.
Requirements and Acquisition Management
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
MDD to Milestone A Requirements Management Activities
DAE CAE PEO PM OIPT Acquisition Category (FY14 $) ACAT ID
Milestone A to Milestone B Requirements Management Activities
New Space Systems Acquisition Policy
Requirements and Acquisition Management
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
CARD: Basically must be prepared any time an independent estimate (ICE or CCA) is to be done
Independent Expert Program Review (IEPR)
CARD: Basically must be prepared any time an independent estimate (ICE or CCA) is to be done
The Department of Defense Acquisition Process
Perspectives on Transforming DT and OT Industry-Government Roundtable
Presentation transcript:

UNCLASSIFIED NDIA CPM 01/13/10 Page-1 Streamlining Program Reviews Terry Jaggers Principle Director, Systems Engineering Office of the Director, Defense Research and Engineering NDIA Committee on Program Management 13 January 2010

UNCLASSIFIED NDIA CPM 01/13/10 Page-2 AF Problem 2 ½ Years Ago… OSD PSR (ACAT IDs) Space IPA (NSS 03-01) Late-to-Need SEPs OSD Independent TRAs Emerging MRAs PEO Sufficiency Reviews Emerging LHAs and ILAs Integration Readiness/D&SWS SEAM/CMMI Process Tools Other (MIRT, CAIG & SRA) SAE Review Board Mtg (IC/D) (Independent) (Integrated/Independent) THEN (Unsustainable, begin NRC study) Issues & Concenrs:  Specialty reviews proliferating at an alarming rate (TRAs, MRAs, IRAs, PSRs, IPAs, PMAG, D&SWS, SEPs, PESHEs, RMAs, etc.)  OSD PSR focused on assessing ACAT ID programs only  SAE’s AF Review Board lacked underpinning process to assess and prepare SAE like PSR did DAE  PEO sufficiency reviews not validated, transparent nor accepted by others  PMs burdened due to lack of synchronization to key program events and multiple review teams  TRAs and other specialty reviews out of context of systems engineering and integration assessment  Training courses being developed ad hoc with no system level view on “integrated” training & education to assess/review  AF missing golden opportunities to enhance, grow and train organic acquisition workforce

UNCLASSIFIED NDIA CPM 01/13/10 Page-3 AF Commissioned NRC Study Statement of Task  Review the program technical reviews and assessments that space and non-space system acquisition programs are required to undergo  Assess each review and the resources required to accomplish it.  Assess the role and contribution that each review and the combined reviews make to successful acquisition.  Identify cases where different reviews have shared, common, or overlapping goals, objectives, content, or requirements.  Identify and evaluate options for streamlining, tailoring, integrating, or consolidating reviews.  Recommend changes that the Air Force and DOD should make to the reviews.

UNCLASSIFIED NDIA CPM 01/13/10 Page-4 NRC Study Outbrief Study & Recommendations to be Briefed by Rand Fisher Here

UNCLASSIFIED NDIA CPM 01/13/10 Page-5 AF [Chief Engineer] Actions Conduct joint DDR&E-SAF/AQR PSRs on ACAT 1Ds and run pilot on SDB II Program Adopt/standardize OSD PSR methodology (DAPS) for use across AF (ACAT 1C, II and IIIs) Incorporate specialty technical reviews (TRAs, MRAs, LHAs, etc) under overarching AF PSR review process Added a “mentoring/help” phase at front end of AF PSR process (start when TRA starts) Added cost estimation (CAIG), PM center of excellence (schedules) and contracting (MIRT) POCs to AF PSR team 5

UNCLASSIFIED NDIA CPM 01/13/10 Page-6 Challenges & Opportunities for DoD Independent Milestone Reviews (PSRs, TRAs, CAIG, Space IPAs, etc) As-Required Program Assistance (Prog Assist, Peer Reviews, Space PMAG, etc) Continuous Execution Reviews (DAES, EVMS, POPs, Etc) DAES DABs CSBs SRCA  Synchronizing/coupling reviews for effectiveness and efficiencies (PM currently tries…)  Architecting the data capture for SRCA (will PARCA do this?)  Standardizing reviews between OSD and Services (AF attempting to synergize OSD-AF tech effort in overall program review initiatives)  Pushing reviews earlier per 5000 and WSARA (MDD and MS A voids)  Reviewing gaps / overlaps in data capture between DAPS, TRAs, POPs, EVMS, etc (Univ of Tenn started)

UNCLASSIFIED NDIA CPM 01/13/10 Page-7 Summary DDR&E synergizing independent technical reviews –Specialty reviews (IRA, TRA, MRA, etc) –Helpful/mentoring opportunities (early engagement at TRA start) –Colloaboration with Component reviews/SMEs –Pushing to the left for MS A and MDD prep More needs to be done to synergize other reviews –Functionals (cost, contracting, test, logistics, etc) –Type (program assist, execution, decision prep) –Data collection/disposition (SRCA and PARCA) Opportunities exist to “architect” reviews smartly –Reduce program office resources –Reduce review team resources –Optimize SRCA data and resources

UNCLASSIFIED NDIA CPM 01/13/10 Page-8 Backup

UNCLASSIFIED NDIA CPM 01/13/10 Page-9 ACB MDD O&S FRP DR PDRCDR ACAT 3 Development Development Planning AC CBA B ICD Technology Development Engineering and Manufacturing Development Production and Deployment Materiel Solution Analysis MDD CPDCDD O&S FRP DR PDRCDR Historical: majority of PSRs performed around EMD for ACAT 1 Current focus: Pushing to left Desire end state: (1) Extend review and analysis capability to Services (2) Get ACAT 2&3 participation (3) Push PSRs “to the left” because that’s where program problems are born (4) Link Competency Model to SRCA results ACB MDD O&S FRP DR PDRCDR ACAT 1 ACAT 2 Policy/Guidance Education & Training Best Practices Other Processes (JCIDS, etc) Oversight (DAB/ITAB) Competency Model AOA SRCA Results Show SE’s PSR & SRCA Vision