1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
European Commission views on intra-day and balancing markets
Regional Market Monitoring Mini Forum CWE REM Paul Giesbertz DTe Brussels, 20 June 2006.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Regulators’ update on Congestion Management and Balancing
NWE Day-Ahead Price Coupling
ERGEG GRI South South East – , Maribor
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Update on European Network Codes
29th April 2014 Teleconference
Presentation transcript:

1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006

2 Based on a joint synthesis of contributions from stakeholders to large public consultations, the 2 “Roadmaps” initially adapted to their specific context put the focus on short-term and long-term priority actions to improve regional market integration Implementing accurately these roadmaps is a TOP PRIORITY for regulators. Until the end of 2007, the Central West REM will focus on:  monitoring the implementation of the roadmaps;  harmonizing the two roadmaps whenever necessary;  reporting on the progress made. Context The 2 roadmaps CRE-CREG-DTe and CRE-FNA

3 Monitoring of correct implementation Principal agreed action points of the roadmaps  To facilitate the functioning of explicit auction mechanisms 1.Implementation of coordinated explicit auction between B-F and F-G 2.Implementation of harmonized secondary capacity markets 3.Full harmonization of explicit auction rules between F-B-NL 4.Increased Transparency (F-B-NL)  To increase the use of existing ATC 5.Implementation of cross-border intraday trade and implementation of cross-border balancing trade 6.Implementation of trilateral market coupling (F-B-NL)  Monitoring and cooperation between regulators  To increase the overall level of cross-border capacities 7. Implementation of a common calculation method

4 Monitoring of correct implementation 1. Coordinated explicit auctions Already implemented on the NL-B-G borders. Implemented, by the 1 st of January 2006, on F-B and F-G borders as requested by the roadmaps. But three different auction platforms currently coexist:  one for F-B, B-F and F-G  one for G-F  one for NL-B-G French and German TSOs are requested to provide by the 1 st of July 2006 an analysis concerning the advantages/disadvantages of integrating both platforms into a single auction office.

5 Monitoring of correct implementation 2. Harmonized secondary capacity markets Two mechanisms are already in place on the NL-B-G borders:  a “Basic transfer capacity”, and  a “Capacity Resale on request” TSOs submitted their joint proposal by the 12 th April This proposal considered several possible options with respective cost and time schedules. Regulators informed TSOs recently of their joint decision:  To extend the two existing mechanisms on the NL-B-G borders to other borders of the Central-Western Region (with potential for slight improvement) asap (and at the latest by the 1 st of January 2007).  By the 1 st of July 2007, the “Basic transfer capacity” mechanism will have to be transformed into “Full transfer capacity”.

6 Monitoring of correct implementation 3. Full harmonization of existing explicit auctions Regulators have noted that there are currently three different sets of auction rules in the Central-West Region (IFB, IFG and TSO Auction rules) with a strong potential for harmonization in users interests IFB and TSO Auction rules (at least for the NL-B border) must be fully harmonized by the 1 st of January 2007 Full harmonization with IFG auction rules is not explicitly planned in the roadmap but should be considered by TSOs involved.

7 Monitoring of correct implementation 4. Increased Transparency (F-B-NL) CRE, CREG and DTe will publish, by the 1st of August 2006, a detailed list of transparency items, based on the “Guidelines for Good Practice for Information Management and Transparency in Electricity Markets” ERGEG’s consultation paper  Identify the “state of the art” in the three respective national markets in terms of transparency  Present the possible ways, including time schedule, to achieve significant improvements Harmonization of the level of transparency between the three countries is expected by the 1st of July 2007

8 Monitoring of correct implementation 5. Cross-border intraday and balancing trade All regulators strongly support the establishment of a cross-border intraday and balancing trade, which will provide:  More flexibility to marketplayers;  Optimization of the utilization of capacities;  Enhancement of competition in these near real-time markets;  Stability of the network and reduction of the TSOs overall costs. Cross-border intraday trade must be implemented on the F-B-NL border by the 1 st of January 2007 Cross-border balancing trade must be implemented on the F-B-NL border by the 1 st of July 2007 Not yet specific implementation date on the F-G border

9 Monitoring of correct implementation 6. Trilateral Market Coupling CRE, CREG and DTe fully support the principle of integration of energy and transmission markets near real time. Four issues to be addressed by the operators:  Correct functioning of the algorithm;  Potential for generalisation;  Absence of discriminatory treatment for day ahead nominated programs;  Implementation and operational costs; financing methods All these issues are being finalized ; A regulators’ decision is expected in the coming weeks.

10 Monitoring of correct implementation 7. Coordinated method for calculating cross-border capacities TSOs are requested to submit, by the 1 st August 2006, a joint proposal for a coordinated method for calculating cross-border capacities. For this purpose, regulators consider it crucial that the three TSOs start by sharing a common set of information/forecasts regarding, in particular: 1. Best estimation of detailed generation and demand patterns ; 2. Network topology and relevant characteristics in full detail ; 3. Transactions already executed. Once approved by the regulators, pursuant of article 5 of the Regulation, this coordinated calculation method shall be published by TSOs and become operational by the 1st of January 2007.

11 Monitoring of correct implementation 8. Market power mitigation and regulatory cooperation Regulators committed to creating a joint regulatory task force in order to monitor the correct functioning of cross-border trade. Exchange of confidential information by the regulators (e.g. to enable market monitoring) ; market power issues This monitoring will particularly deal with following concerns:  Do market players value cross-border capacity correctly?  Do market players use cross-border capacity efficiently?  Is the level of allocated capacity sufficient?  Is the level of firmness sufficient?  Is the UIOLI rule well applied? Publication of an annual joint regulatory report is expected by the 1 st of January 2007

12 Monitoring of correct implementation First impressions from the regulators Regulators reaffirm that the implementation of the agreed action points in the 2 roadmaps is of utmost importance for the further regional integration of CWE wholesale markets Up to now, TSOs have shown serious involvement and have cooperated actively  Delivery dates are respected  No significant delay are expected from TSOs  The implementation of harmonized secondary capacity markets could possibly be delayed to the 1 st January 2007 Governments are reacting positively but some issues to be addressed (e.g. legal framework for the exchange of confidential information between regulators)