Andrei Seryi ILC BDS, DOE review 1 June 2005 The ILC Beam Delivery System, ATF2 and ESA Andrei Seryi SLAC DOE High Energy Physics Program Review June 14-15,

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
1 August 12, 2005 Running 2mrad IR in e-e- mode: BDS constraints A.Seryi August 12, 2005.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
ILC Beam Delivery System Layout and Lattice Design Deepa Angal-Kalinin ASTeC, Cockcroft Institute Cockcroft Institute SAC th November 2006.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Overview of Extraction Line Designs and Issues
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF UK plans for Energy spectrometer studies University College London Stewart Boogert.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Tor Raubenheimer SLAC FY07 Budget Proposal ART FY07 Budget Meeting SLAC May 3 rd, 2006.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Beam Delivery System Andrei Seryi SLAC “Lunch-time accelerator lecture” Snowmass, CO, August 2005 Andrei Seryi SLAC “Lunch-time accelerator lecture” Snowmass,
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
WG4: (Beam Delivery, Interaction Region, …) SUMMARY Grahame Blair, Tomoyuki Sanuki, Andrei Seryi On behalf of WG4 participants 15 November 2004 First ILC.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
Grahame Blair, Tomoyuki Sanuki, Andrei Seryi
Machine Detector Interface Design Updates
Near IR FF design including FD and longer L* issues
IP Beam Instrumentation R&D and Testbeams for the ILC
Oversea collaborators
Beam Delivery update Andrei Seryi December 12, 2005
CLIC-ILC BDS & MDI work.
Beam Optics Set-Up at SLAC End Station A
Background study plans : from to ILC
Updates on IR and FF for super-B factory
The 2mrad horizontal crossing angle IR layout for the ILC
Andrei Seryi Materials for discussion TILC-08
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

Andrei Seryi ILC BDS, DOE review 1 June 2005 The ILC Beam Delivery System, ATF2 and ESA Andrei Seryi SLAC DOE High Energy Physics Program Review June 14-15, 2005

Andrei Seryi ILC BDS, DOE review 2 June 2005 The scene Truly international efforts with more than 100 people are involved in machine and machine-detector aspects of BDS –Daresbury, RHUL, QMUL, Oxford, UCL, LAL, CEA/Saclay, CERN, BINP, DESY, INFN, … –KEK, Tokyo University, Kyoto ICR, IHEP, Pohang AL, … –SLAC, BNL, Fermilab, LLNL, Universities, … and many other … SLAC contribution need to be viewed in this context Experience of BDS design and operation is one of biggest strength of SLAC –Design and work with SLC Final Focus, instrumentation & MDI aspects –Dedicated international Final Focus Test Beam facility ILC BDS design – Working Group 4 of ILC –conveners: Grahame Blair, Tomoyuki Sanuki, Andrei Seryi

Andrei Seryi ILC BDS, DOE review 3 June 2005 Mature design of BDS; large role of SLAC Final Focus of SLC design with chromaticity correction by interleaved sextupoles Non-interleaved (for x and y planes) sextupole pairs – verified at FFTB The lessons learned at these facilities => FF with local chromaticity correction, designed at SLAC for NLC in 2000, now the basis of ILC BDS Designs for the IR, BDS instrumentation and beam dumps follow the lessons learned at SLC and are the basis for ILC NLC BDS ~2002

Andrei Seryi ILC BDS, DOE review 4 June 2005 Beam Delivery System challenges Focus the beam to size of about 500 * 5 nm at IP Provide acceptable detector backgrounds –collimate beam halo Monitor the luminosity spectrum and polarization –diagnostics both upstream and downstream of IP is desired Measure incoming beam properties to allow tuning of the machine Keep the beams in collision & maintain small beam sizes –fast intra-train and slow inter-train feedback Protect detector and beamline components against errant beams Extract disrupted beams and safely transport to beam dumps Optimize IR for all considered detector concepts Minimize cost & ensure Conventional Facilities constructability

Andrei Seryi ILC BDS, DOE review 5 June 2005 Choice of crossing angle has crucial influence on the machine performance, reliability, and affect physics reach 3ns bunch spacing => 20mrad x-ing; 300ns => chose head-on Incoming and outgoing beam are independent (+) Disrupted beam with large energy spread captured by alternating focusing, no need to bend the beam after collision => easier to minimize beam losses (+) Require compact SC quads and crab cavity The exit hole un-instrumented => loss of detector hermeticity (-) Low energy pairs spread by solenoid field => somewhat larger background (-) No extra exit hole => somewhat better detector hermeticity(+) Low energy pairs spread less => somewhat better background (+) Require electrostatic separator with B- field or RF-kicker Incoming and outgoing magnets shared => difficult optics, collimation apertures set by outgoing beam(-) Need to bend disrupted beam with large energy spread => beam loss, especially at high energy, MPS(-)

Andrei Seryi ILC BDS, DOE review 6 June 2005 Evaluation of head-on design by TRC SLAC actively participated in ILC-TRC in 2002, including evaluation of BDS design and head-on scheme –Large losses in extraction line, especially at 1 TeV –Incompatible with post-IP E/Polarization diagnostics –Electrostatic separator 100kV/cm at 1TeV – feasibility in high SR environment –MPS issues –  losses at (or near) septum: ~5-15kW –Parasitic collision 26.5 m from 1TeV –SR masking over-constrained

Andrei Seryi ILC BDS, DOE review 7 June 2005 SLAC contributed to all aspects of turning the Strawman configuration into real design: Full optics for all beamlines; Well developed and optimized 20mrad optics and magnets design; The method and first iteration of optics and magnets for 2mrad IR; Upstream and downstream diagnostics for both IRs 1 st ILC Workshop November 2004

Andrei Seryi ILC BDS, DOE review 8 June 2005 to IR2 to IR1 to dump 11 mrad Big Bend & polarimeter chicane ILC2005 Beam Switchyard Optics Based on NLC design Betatron collimation with survivable spoilers Energy & polarization diagnostics BDS for 20mrad IR

Andrei Seryi ILC BDS, DOE review 9 June mrad IR, extraction & compact SC quads IR design based on compact SC quads developed at BNL Work closely with BNL on design of IR, SC quads, study of its stability Detailed model in Geant Close connection with detector groups optimizing IR and detector design

Andrei Seryi ILC BDS, DOE review 10 June mrad IR: from concept to optics FF and extraction line optimized simultaneously Quads and sextupoles in the FD optimized to –cancel FF chromaticity –focus the extracted beam SLAC-BNL-UK-France Task Group QF1 pocket coil quad O.Napoly, 1997

Andrei Seryi ILC BDS, DOE review 11 June mrad IP Extraction Line in Geant SLAC-BNL-UK-France Task Group QD0 SD0 QF1 SF1 QEXF1 BYCHIC Disrupted beam & Sync radiations Beamstrahlung Incoming beam 60 m Shared Large Aperture Magnets Warm Panofsky septum quad (C.Spencer) Rutherford cable SC quad and sextupole No beam &  losses for nominal parameters pocket coil quad Super Septum Quad, B.Parker et al.) or

Andrei Seryi ILC BDS, DOE review 12 June 2005 Largest elements of BDS R&D with SLAC involvement Proposed End Station A at SLAC –Study Interaction Region issues and instrumentation –Mockup of full IR Existing ATF at KEK (DR and BDS related studies) –Instrumentation (Nano-BPM, laser wires, optical anchor) –Fast Intra-train feedback (FONT/Feather) –nm resolution BPM test & demonstration –Preparation of ‘ATF-2’ Proposed ATF-2 at KEK –BDS facility, use very low emittance ATF beam

Andrei Seryi ILC BDS, DOE review 13 June 2005 End Station A Test Facility For Prototypes of Beam Delivery and IR Components CCLRCLLNLQMULUCLU. of Bristol CERNLancaster U.SLACUC BerkeleyU. of Oregon DESYManchester U.UMass Amherst U. of Cambridge KEKNotre Dame U.U. of Birmingham TEMF TU Darmstadt Collimator design, wakefields (T-480) BPM energy spectrometer (T-474) Synch Stripe energy spectrometer (T-475) IP BPMs, kickers EMI (electro-magnetic interference) IR Mockup PAC05 paper/poster: SLAC-PUB e-Print Archive: physics/

Andrei Seryi ILC BDS, DOE review 14 June 2005 End Station A for recent E158 experiment Experimental hall is 60 meters long E158 completed in Sept and all beamline components in ESA have been removed. A concrete bunker (not shown) surrounds the beamline.

Andrei Seryi ILC BDS, DOE review 15 June 2005 ESA Test Facility: First Experiments T-480: Collimator Wakefields Collimators remove beam halo, but excite wakefields. Goal is to determine optimal collimator material and geometry. T-474, T-475: Energy Spectrometers Precision energy measurements to parts per million are needed for Higgs boson and top quark mass measurements. BPM and synchrotron stripe spectrometers will both be evaluated in a common 4-magnet chicane.

Andrei Seryi ILC BDS, DOE review 16 June 2005 Envision 2-week run in November 2005, and to have 2-week runs ~every 6 months in E,z bunch distributions in ESA; 2E10 e - /bunch, 28.5 GeV ILC bunch charge and bunch length End Station A Test Facility

Andrei Seryi ILC BDS, DOE review 17 June 2005 Reasons to develop ATF-2 facility Luminosity issues will be extremely challenging in the LC –Likely more challenging than achieving the beam energy Complete FFTB studies –FFTB never demonstrated routine operation of FFS Implement full feedback control and optimization Operate with ILC like bunch train and IP feedback Use stable low emittance beam from ATF DR Learn to operate new FF optics Experience concurrent with ILC construction –FFTB experience will be over 15 years old –Train new generation of physicists ATF2 collaboration, presently 88 people from 21 labs and institutions and growing KEK, Tsukuba IHEP, Beijing BINP, Novosibirsk CCLRC/DL/ASTeC,Daresbury CEA, Gif-sur-Yvette CERN, Geneva Hiroshima University Kyoto ICR, Kyoto LAL, Orsay LLNL, Livermore NIRS, Chiba-shi North Carolina A&T State University Oxford University Pohang Accelerator Laboratory Queen Mary University of London Royal Holloway, University of London DESY, Hamburg SLAC, Stanford UCL, London University of Oregon University of Tokyo ATF2 proposal is to be released in June, during the BDIR workshop in London

Andrei Seryi ILC BDS, DOE review 18 June 2005 Optics Design of ATF2 New Beamline Beam ATF2 design & goals (A) Small beam size Obtain  y ~ 35nm Maintain for long time (B) Stabilization of beam center Down to < 2nm by nano-BPM Bunch-to-bunch feedback of ILC-like train New final focus New diagnostics existing extraction

Andrei Seryi ILC BDS, DOE review 19 June 2005 Advanced beam instrumentation at ATF2 BSM to confirm 35nm beam size nano-BPM at IP to see the nm stability Laser-wire to tune the beam Cavity BPMs to measure the orbit Movers, active stabilization, alignment system Intratrain feedback, Kickers to produce ILC-like train IP Beam-size monitor (BSM) (Tokyo U./KEK, SLAC, UK) Laser-wire beam-size Monitor (UK group) Cavity BPMs, for use with Q magnets with 100nm resolution (PAL, SLAC, KEK) Cavity BPMs with 2nm resolution, for use at the IP (KEK) Laser wire at ATF

Andrei Seryi ILC BDS, DOE review 20 June 2005 Summary ILC BDS design is making progress from the concept to optics, from optics to engineering design Strong R&D program is planned and ongoing SLAC actively contributing to all aspects of BDS design and R&D