PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.

Slides:



Advertisements
Similar presentations
PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
Advertisements

AITA 9, MERTIS Team – MERTIS Calibration, Oct 2007 Folie 1 Development of a calibration concept for the MErcury Thermal Infrared Spectrometer Thomas Saeuberlich,
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IIDR 01/02 Mar 2001 Instrument Overview1 PACS Instrument Design Description and System Performance A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS Instrument Overview1 Instrument Design/Development Overview and System Performance PACS Instrument Overview A.Poglitsch MPE.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
PACS IQR 13 Jan 2005 AVM/CQM ILT – test results1 PACS CQM/AVM ILT Results of functional/performance/ calibration tests.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
CEA / PACS SVR phase 2 Photometer results from the first part of the FM ILT CEA - MPE - NHSC.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
PACS IBDR 27/28 Feb 2002 Optical System Design1 N. Geis MPE.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IIDR 01/02 Mar 2001 On-Board Data Compression1 On-Board Data Compression Concept A. N. Belbachir Vienna University of Technology.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
1 SNAP Calibration Hardware Contributors: Chuck Bower Nick Mostek Stuart Mufson Mike Sholl.
PACS SVR 22/23 June 2006 Instrument Performance Prediction1 PACS Instrument Model and Performance Prediction A. Poglitsch.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
Optimisation of the PACS Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IHDR 12/13 Nov 2003 Filters1 N. Geis MPE. PACS IHDR 12/13 Nov 2003 Filters2 PACS Filter Scheme Filter scheme with 5 or 6 filters in series in each.
PACS SVR 22/23 June 2006 Scientific/Performance Requirements1 PACS Science and Performance Requirements A. Poglitsch.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
System Performance Metrics and Current Performance Status George Angeli.
Astronomical Observational Techniques and Instrumentation
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
AIRS (Atmospheric Infrared Sounder) Instrument Characteristics
An IFU slicer spectrometer for SNAP
Presentation transcript:

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview2 Instrument Concept Imaging photometry –two bands simultaneously (60-85 or µm and µm) with dichroic beam splitter –two filled bolometer arrays (32x16 and 64x32 pixels, full beam sampling) –point source detection limit ~3 mJy (5 , 1h) Integral field line spectroscopy –range µm with 5x5 pixels, image slicer, and long-slit grating spectrograph (R ~ 1500) –two 16x25 Ge:Ga photoconductor arrays (stressed/unstressed) –point source detection limit 2…8 x W/m 2 (5 , 1h) Focal Plane Footprint 32 x 16 pixels 6.4” x 6.4” 64 x 32 pixels 3.2” x 3.2”

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview3 Observing Modes Combinations of instrument modes and satellite pointing modes Instrument modes: –dual-band photometry –single-band photometry –line spectroscopy observation of individual lines –range spectroscopy observation of extended wavelength ranges Pointing modes: –stare/raster/line scan –with/without nodding

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview4 CEA BOL/BAU BlueBol BAU RedBol BAU Warm Interconnecting Harness Instrument Overview and Subsystem Responsibilities DPU nominal DPU redundant IFSI-ROME DEC/MEC 2 MEC I/F-Module Redundant DSP Module Redundant RedDEC Module Base/PSU Redundant CSL-Liege BOL/COOL BOL 1 Module BOL 2 Module Cooler Control CEA FPU Cold FocalPlaneUnit KT/MPE BlueGe:GaArray &CRE MPE/ANTEC/IMEC BlueBolArray &Read-out CEA RedBolArray &Read-out CEA RedGe:GaArray &CRE MPE/ANTEC/IMEC 0.3K Cooler CEA Grating Assy CSL-Liege Chopper Assy MPIA 2FilterWheels KT 2BlackBodies KT SPU nominal SPU redundant IAC-Tenerife/TU-Wien CSL-Liege DEC/MEC 1 MEC I/F-Module DSP Module BlueDEC Module Base/PSU

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview5 DPU Single point of communication with satellite TC/TM –reception and execution or distribution of commands –transfer of science and HK data –autonomy functions

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview6 SPU Data compression –lossy part (average / fit) –lossless part (redundancy removal) Must reduce raw data rate from up to 3.6 Mbit/s to ~120 kbit/s

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview7 DECMEC Photoconductor operation and readout –CRE supply and timing/control –detector bias –signal acquisition FPU mechanisms control/ synchronization –chopper –filter wheels –grating BOLC data acquisition and control Communication with SPU and DPU

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview8 BOLA / BOLC BOLA 160-channel JFET buffer at ~100 K BOLC Acquisition of signals from 160 multiplexers in bolometer arrays Sequencer for bolometer operation / readout Control of 300 mK cooler Transfer of digitized data to DECMEC

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview9 FPU/Optics FPU Cold FocalPlaneUnit KT/MPE BlueGe:GaArray &CRE MPE/ANTEC/IMEC BlueBolArray &Read-out CEA RedBolArray &Read-out CEA RedGe:GaArray &CRE MPE/ANTEC/IMEC 0.3K Cooler CEA Grating Assy CSL-Liege Chopper Assy MPIA 2 FilterWheels KT 2 Calibrators KT Chopper sGeGaDetector Red Spectrometer Blue Bolometer Red Bolometer Calibrator I and II 0.3 K Cooler Filter Wheel I Filter Wheel II Grating GeGa Detector Blue Spectrometer Encoder Grating Drive Entrance Optics Photometer Optics Calibrator Optics Slicer Optics Spectrometer Optics

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview10 Design/Development Status of Technically Critical Components Optics FPU/Structure Photoconductors, CRE Bolometers Chopper Grating assembly Warm electronics

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview11 Optics Design of FPU optics complete, manufacturing of mirror blanks started Alignment plan exists; tolerancing partly done Analyses (geometrical-optical, diffraction) done end- to-end for selected cases; coverage of parameter space (wavelength, chopper angle) to be improved in context of instrument calibration Baffle design of FPU nearly finished; straylight analysis difficult Calibration sources conceptual design achieved  Details from N. Geis

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview12 Detailed design of FPU structure in final phase. Structural problems solved. First part (“top optics”) in manufacturing. Delay for manufacturing from some interface problems and from late input –bolometer unit mounting interface –electrical distribution board design –detector array cable harness –filter mounts  Details from J. Schubert and D. Kampf FPU Status

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview13

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview14 Environmental testing successful Performance tests on both high and low-stress modules with TIA: QE looks ok (high-stress: >30%) Design Changes –short-circuit “immunity” implemented in FM design Manufacturing Status –QM completed – but FEE integration outstanding –FM in production Problems –“pigtail” harness late and hard to fit in FPU –late readiness of FEEs  Details from H. Richter and D. Rosenthal Photoconductor Arrays

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview15 Cryogenic Read-Out Electronics CREs have undergone complete redesign over the last two years Progress with new design from both, optimization of transistor geometry and of circuit design CQM run ‘032001’ –design/layout improvement and local optimization of input stage –successfully tested by IMEC and by CSL, working at MPE –will be used for detector module tests at LENS CQM run ‘102001’ –essentially integrator type _024 (as ) –evolutionary combination of additional features (4 C int, increased dynamic range) –for integration into QM detector modules, dice delivery 11/2001  Details from C. van Hoof

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview16 CRE Performance Linearity : 2V Cross talk between channels: <1% full range Noise, linearity, cross talk ~ meet requirements Tests of CREs with detectors still ahead (early ’02) 16

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview17 Bolometer Arrays Two complete “blue” arrays mounted in cryostat at LETI for optical characterization Red arrays being assembled Cold multiplexer/buffer noise (differential mode) < 1 µV/Hz 1/2 Detection efficiency 80% (calculated) across PACS spectral bands Good tolerance to uncertainty in background level shown by modeling  Details from L. Rodriguez

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview18 3 He Sorption Cooler 300 mK cooler development on track, good margin for 46h operation  Details from L. Duband

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview19 Chopper Status QM –Manufacturing at MPIA started mid Oct 2001 –Qualification tests started January 2002 –Delivery to MPIA/MPE/KT planned for March 2002, but delayed due to pigtail delivery Problems –Damage of flex pivots in lifetime model operation  Details from R. Hofferbert

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview20 Grating Diffraction GratingSample received from Zumtobel GmbH (A), under evaluation Zeiss for FM manufacture as backup Actuatorordered from TU Berlin after successful performance test at 4K Position Sensorordered from FARRAND after successful breadboard test of sensor at 4K Bearingscoatings and preload control under evaluation Launch-lockprototype under fabrication  More information from E. Renotte

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview21 Warm Electronics Development BOLA –Mechanical design updated –Box thermal behavior modeling in progress –JFET modeling for effect of temperature on performance in progress BOLC –Mechanical design BOLC updated (2 stacked boxes) –Analogue board prototype ready for performance test –Bolometer bias board (QM1) ready for design –“300mK” temperature control prototype designed –FPGA implementation of IEEE1355 under test at CSL –Most digital functions designed, except bolometer sequencer

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview22 Warm Electronics Development DEC/MEC –DEC/MEC AVM Status DSP and DEC simulator available / development on schedule –DEC/MEC EM Status design and procurement ongoing, but validation with representative hardware pending on mechanism simulators availability from partners –DEC/MEC On-board Software Status sequencer complete communication 70% tested mechanism control low-level S/W ~ 0% MEC-to-DPU simulator completed: Virtuoso + OBS emulated on a PC –Successful operation of CRE with DEC prototype low noise + good linearity CRE 4K

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview23 Instrument Performance Instrument Requirements –Photometer –Spectrometer Instrument Model –Optical performance –Sensitivity budget optical transmission background detector performance

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview24 Photometer Performance Requirements Image quality –blur: telescope limited –distortion: ±1 pixel; alignment: <1/3 pixel Sensitivity (point source detection) –requirement: 5 mJy (5  ), 1h of integration –goal: 3 mJy (5  ), 1h of integration Dynamic range –detection from 3 mJy to >1000 Jy (goal: 3000 Jy) –contrast of up to 1:500 in one field Post-detection bandwidth –requirement: Hz –goal: Hz

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview25 Spectrometer Performance Requirements Image quality –blur: telescope limited –distortion: ±1 pixel; alignment: <1/4 pixel Sensitivity (point source detection) –requirement: 3x W/Hz 1/2 (5  ), 1h of integration –goal: 2x W/Hz 1/2 (5  ), 1h of integration Dynamic range –detection from ~1x W to > W –contrast of up to 1:100 in one field Post-detection bandwidth –requirement: 5 Hz –goal: 10 Hz

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview26 Optical Performance Optical design fulfills requirements regarding –field of view –spatial sampling –distortion –geometrical spot sizes (Strehl ratio) –alignment –internal calibration capability –chopping –spectral coverage and resolution –transmission / diffraction losses  Details from N. Geis

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview27 (a) Values for the photometry modes from or µm / µm, respectively. (b) The formal transmission of >1 takes into account the acceptance solid angle of the photoconductor light cones / bolometer baffles which differs from the beam solid angle. Parameters of PACS Instrument Model (Present Best Estimate)

PACS IBDR 27/28 Feb 2002 PACS Instrument Overview28 Background, NEP, Spectroscopic and Photometric Sensitivity  Performance requirements (or even goals) can be met assumed detector QEs: 30% (spectroscopy); 80% (photometry) assumed detector NEPs: 5x W/Hz 1/2 (spectroscopy); W/Hz 1/2 (photometry)