FCC Study Status & Summary of FCC Week 2015

Slides:



Advertisements
Similar presentations
Future Circular Collider (FCC) Study
Advertisements

1 Future Circular Collider Study Michael Benedikt CERN, 26 th May 2014 Future Circular Collider (FCC) Study - Status Michael Benedikt.
Roundtable Discussion on Future Machines – Quy Nhon, Participants: Roy Aleksan, CEA, Chair of ESGARD Alain Blondel, Professor of particle physics.
FCC Horizon 2020 Design Study Proposal Daniel Schulte for the FCC team Preparatory Collaboration Board Meeting, September 2014.
Study Overview & Status
Future Circular Collider Frank Zimmermann for the FCC collaboration Future Research Infrastructures – Challenges and Opportunities Varenna, 9 July 2015.
R. Aleksan Saclay Avril 14, 2015 Informations générales CECP Prochain RV.
Work supported by the European Commission under Capacities 7th Framework Programme, Grant Agreement A First Look at the TLEP Accelerator Frank Zimmermann,
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
1 Future Circular Collider Study Michael Benedikt CLIC Workshop 2014 Future Circular Collider Study Overview.
Future Circular Collider
Understand the Present to Master the Future Johannes Gutleber Future Circular Collider.
General news LCD monthly meeting Oct 28 th 2013 L. Linssen, CLICdp/LCD monthly meeting, 28 Oct
Future Accelerators at the High Energy Frontier
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
EuroCirCol Plan Overview Daniel Schulte for the EuroCirCol team CERN, June 2015.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
CERN and the High Energy Frontier Emmanuel Tsesmelis CERN Directorate-General Unit & JAI University of Oxford JAI Octoberfest 2014 Royal Holloway, University.
Patrick Janot News and Organization  Major events since last coordination meeting (30 April 2014) u 7 th FCC-ee (TLEP) Physics Workshop (19-21 June 2014)
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Work.
330 registered participants Closing remarks. 2 Future Circular Collider Study FCC Kick-Off 2014 Discussion of all FCC aspects Refine scope of the study.
WelcomeWelcome CSEM – CERN Day 23 rd May 2013 CSEM – CERN Day 23 rd May 2013 to Accelerating Science and Innovation to Accelerating Science and Innovation.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
Future Circular Collider
1 H2020 FCC DS proposal Michael Benedikt ESGARD Meeting 24 March 2014 Future Circular Collider (FCC) study H2020 DS proposal PRELIMINARY Michael Benedikt.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM”
Review of FCC-hh optics & beam dynamics IPNO, Orsay, Paris November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
Alain Blondel TLEP VC TLEP study news.
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
1 FCC News Frank Zimmermann LHeC-CG, 2 October 2015 FCC status F. Zimmermann on behalf of the FCC Collaboration LHeC Coordination Group 2 October 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN Report R-D Heuer ECFA, November Scientific Strategy Implementation of all four European Strategy high priority items Implementation of a diverse.
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
F. Gianotti, FCC-hh WS, 26/5/2014 Challenges for Future Circular Colliders F. Zimmermann, CERN BE/ABP Beam Dynamics Meets Magnets Bad Zurzach, 1 December.
1 Future Circular Collider Study Frank Zimmermann FCC-ee Physics Meeting 3 February 2015 Future Circular Collider (FCC) Study Scope & Collaboration M.
1 Future Circular Colliders Michael Benedikt 2015 Higgs Hunting, Orsay Future Circular Colliders M. Benedikt gratefully acknowledging input from FCC global.
Future Circular Colliders (FCC) (and other relevant one) FCC study page :
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary.
Salam, NTU Singapore, Peter Jenni (Freiburg and CERN) LHC, Higgs and Beyond (part II - ATLAS) 1 Dijet mass of 8.8 TeV The future of particle.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
1 Future Circular Collider Study Frank Zimmermann FCC-ee Physics Meeting 3 February 2015 status of FCC-hh/FCC-ee machine studies M. Benedikt, D. Schulte,
1 FCC-ee as Higgs Factory Jörg Wenninger CERN Beams Department Operation group - LHC 23/07/2014 Future Circular Collider Study Acknowledgments to my FCC-ee.
1 Future Circular Collider Study Michael Benedikt Wigner Institute Budapest, 7 June 2016 Future Circular Collider Study FCC PS SPS LHC.
R. Aleksan Saclay May 11, Réunion Générale FCC 2016 à Rome  avril  > 450 personnes (des demandes d’inscription ont dû être refusées)  Collaboration.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
1 Future Circular Collider Study Michael Benedikt 2 nd FCC Week, Rome, April 2016 Future Circular Collider Study Status and Parameter Update
Future Circular Collider Study
FCC-ee Interaction Region design
LHeC Coordination Meeting, 9 June 2017
FCC Kick-Off 2014 Future Circular Collider (FCC) study: kick-off meeting & recent progress Frank Zimmermann BE/ABP 22 May 2014 thanks.
FCC summary report March 2015 Washington.
Future Circular Collider
Overview of Future pp Collider Plans
Welcome to CERN Volker Mertens CERN Technology Department.
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
Forming a Gender Equality Group
Future Collider Projects at CERN
High Energy High Intensity Hadron Beams
Presentation transcript:

FCC Study Status & Summary of FCC Week 2015 Frank Zimmermann BE/ABP Group Meeting CERN, 21 May 2015 gratefully acknowledging input from Michael Benedikt & Johannes Gutleber Work supported by the European Commission under Capacities 7th Framework Programme projest EuCARD-2, Grant Agreement 312453, and the HORIZON 2020 project EuroCirCol, Grant Agreement 654305

FCC study – scope & goal Goal: Accelerator & Infrastructure FCC-hh: 100 TeV pp collider as long-term goal - defines infrastructure needs FCC-ee: e+e- collider, potential intermediate step FCC-he: integration aspects of pe collisions key technologies infrastructure in Geneva region Physics & Experiments physics opportunities, detector concepts, data services Cost, implementation and governance models Conceptual Design Report by end of 2018 in time for next European Strategy Update Goal:

CERN Circular Colliders + FCC 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 20 years Constr. Physics LEP Design Proto Construction Physics LHC Design Construction Physics HL-LHC Design Future Collider Physics Construction Proto

Study time line towards CDR 2014 2015 2016 2017 2018 Q1 Q2 Q3 Q4 Study plan, scope definition Explore options “weak interaction” conceptual study of baseline “strong interact.” FCC Week 2015: work towards baseline FCC Week 17 & Review Cost model, LHC results  study re-scoping? FCC Week 2016 Progress review Elaboration, consolidation FCC Week 2018  contents of CDR Report CDR ready

Key Parameters FCC-hh Parameter FCC-hh LHC Energy [TeV] 100 c.m. Dipole field [T] 16 8.33 # IP 2 main, +2 4 Luminosity/IPmain [cm-2s-1] 5 - 25 x 1034 1 x 1034 Stored energy/beam [GJ] 8.4 0.39 Synchrotron rad. [W/m/aperture] 28.4 0.17 Bunch spacing [ns] 25 (5) 25

FCC-hh Luminosity Goals Two parameter sets for two operation phases: Phase 1 (baseline): 5 x 1034 cm-2s-1 (peak), 250 fb-1/year (averaged)  2500 fb-1 within 10 years (~HL LHC total luminosity) Phase 2 (ultimate): ~2.5 x 1035 cm-2s-1 (peak), 1000 fb-1/year (averaged)  15,000 fb-1 within 15 years  Yielding total luminosity O(20,000) fb-1 over ~25 years of operation OK for physics

fresh in arXiv

FCC-hh luminosity evolution 24 h radiation damping: t~1 h for both phases: beam current 0.5 A unchanged! total synchrotron radiation power ~5 MW. phase 1: b*=1.1 m, DQtot=0.01, tta=5 h phase 2: b*=0.3 m, DQtot=0.03, tta=4 h

FCC-hh int. luminosity per day phase 1: b*=1.1 m, DQtot=0.01, tta=5 h phase 2: b*=0.3 m, DQtot=0.03, tta=4 h

Key Parameters FCC-ee Parameter FCC-ee LEP2 Energy/beam [GeV] 45 120 175 105 Bunches/beam 13000- 60000 500- 1400 51- 98 4 Beam current [mA] 1450 30 6.6 3 Luminosity/IP x 1034 cm-2s-1 21 - 280 5 - 11 1.5 - 2.6 0.0012 Energy loss/turn [GeV] 0.03 1.67 7.55 3.34 Synchrotron Power [MW] 100 22 RF Voltage [GV] 0.2-2.5 3.6-5.5 11 3.5 Dependency: crab-waist vs. baseline optics and 2 vs. 4 IPs

FCC-ee: Luminosity vs. Energy Crab waist 4 IP Crab waist 2 IP Baseline 4 IP Baseline 2 IP H? with mono-chromatization

by* evolution over 40 years b* [m] SuperKEKB FCC-ee SPEAR PEP, BEPC, LEP PETRA TRISTAN DORIS CESR-c, PEP-II BEPC-II CESR DAFNE KEKB 6 mm 1 mm 0.3 mm entering a new regime for ring colliders – SuperKEKB will pave the way towards b*≤1 mm

Geology Studies – Example 93 km 90 – 100 km fits geological situation well, better than a smaller ring size LHC suitable as potential injector

A key to New Physics

EuroCirCol EU Horizon 2020 Grant EC contributes with funding to FCC-hh study Core aspects of hadron collider design: arc & IR optics design Feasibility study of key technologies: 16 T magnet program, cryogenic beam vacuum system

Evaluation Results Science is excellent 15/15 Science is excellent Project is ambitious and shows innovation potential Objectives are clear and approach is credible Will have impact on other disciplines and industry Key element of European Strategy on Particle Physics Quotes Recognition of FCC Study by European Commission

16 Tesla EC Funded Scope Arc Design Lead: CEA A. Chancé Co-Lead: CERN D. Schulte EIR Design Lead: JAI A. Seryi Co-Lead: CERN D. Schulte Cryo Beam Vacuum Lead: CELLS F. Perez Co-Lead: CERN P. Chiggiato High Field Magnet Lead: CERN L. Bottura Co-Lead: n.n. 16 Tesla

EuroCirCol Consortium + Associates CERN IEIO TUT Finland CEA France CNRS KIT Germany TUD INFN Italy UT Netherlands ALBA Spain CIEMAT STFC United Kingdom UNILIV UOXF KEK Japan EPFL Switzerland UNIGE NHFML-FSU USA BNL FNAL LBNL Japan KEK Finland TUT France CEA, CNRS Italy INFN Germany KIT, TUD Switzerland EPFL, UNIGE Netherlands UT Spain ALBA, CIEMAT CERN United Kingdom STFC, UNILIV, UOXF Consortium Beneficiaries, signing the Grant Agreement

The FCC Collaboration A consortium of partners based on a Memorandum Of Understanding (MoU) Working together on a best effort basis Self governed Incremental & open to academia and industry Specific contributions detailed in Addendum

Collaboration Status 55 institutes 20 countries EC participation

55 FCC collaboration members & CERN as host institute, status 28 April 2015 KEK, Japan KIAS, Korea King’s College London, UK KIT Karlsruhe, Germany Korea U Sejong, Korea MEPhI, Russia MIT, USA NBI, Denmark Northern Illinois U., USA NC PHEP Minsk, Belarus U. Liverpool, UK U Oxford, UK PSI, Switzerland Sapienza/Roma, Italy UC Santa Barbara, USA U Silesia, Poland TU Tampere, Finland U Twente, Netherlands Wroclaw UT, Poland ALBA/CELLS, Spain Ankara U., Turkey U Bern, Switzerland BINP, Russia CASE (SUNY/BNL), USA CBPF, Brazil CEA Grenoble, France CEA Saclay, France CIEMAT, Spain CNRS, France Cockcroft Institute, UK U Colima, Mexico CSIC/IFIC, Spain TU Darmstadt, Germany DESY, Germany TU Dresden, Germany Duke U, USA EPFL, Switzerland GWNU, Korea U Geneva, Switzerland Goethe U Frankfurt, Germany GSI, Germany Hellenic Open U, Greece HEPHY, Austria U Houston, USA IFJ PAN Krakow, Poland INFN, Italy INP Minsk, Belarus U Iowa, USA IPM, Iran UC Irvine, USA Istanbul Aydin U., Turkey JAI, UK JINR Dubna, Russia FZ Jülich, Germany KAIST, Korea

Study Coordination Group - evolving M. Benedikt F. Zimmermann Study Lead A. Ball, (F. Gianotti,) J. Incandela, M. Mangano, W. Riegler Hadron Collider Physics & Experiments A. Blondel, J. Ellis, C. Grojean, P. Janot Lepton Collider Physics & Experiments M. Klein, O. Bruning ep Physics, Experiment, IP Integration B. Goddard Hadron Injectors D. Schulte, M. Syphers Hadron Collider Y. Papaphilippou Lepton Injectors F. Zimmermann, J. Wenninger, U. Wienands Lepton Collider L. Bottura, E. Jensen, L. Tavian Accelerator Technologies R&D JM. Jimenez Special Technologies P. Lebrun, P. Collier Infrastructures & Operation P. Lebrun, F. Sonnemann Costing & Planning

First FCC Week Conference Washington DC 23-27 March 2015 http://cern.ch/fccw2015 ++...

1st FCC Week Washington DC, March 2015

“head shots” from Bob Palmer (BNL) FCC Week 2015 “head shots” from Bob Palmer (BNL)

340 128 Institutes 21 Countries FCC Week 2015 STATISTICS Registrants FCC kickoff & FCC week 2015 – both had about 340 participants

a few highlights from the FCC week US congressman Bill Foster: “don’t be shy to stand up for the unique nature of your field and don’t be afraid of big numbers!” special session devoted to US (LARP, SRF, high field magnets, particle physics strategy) industrial exhibition and “industry fast-track” session focused on Nb3Sn and HTS conductor development James Siegrist (DOE) pointed way for aligning the US high-field R&D effort with FCC goals; implementation plan to be composed in near future first US demonstrator magnet could be ready in 2016 Lenoid Rivkin was confirmed as FCC collaboration board chair until the end of 2018

Outlook till end 2015 freeze baselines, parameters and concepts colliders, injectors and infrastructures series of (mini-)reviews in June and September/October: - geology, FCC-ee optics, FCC-hh injection energy put Nb3Sn/16 T magnet program on solid feet alignment with US DOE high-field magnet program define and launch selected technology R&D programmes e.g. cryo-beam vacuum system for FCC-hh reinforce physics and detector simulations pursue MDI ( e.g. FCC-ee SR effects) and experiment studies further enlarge global FCC collaboration

FCC Week 2016 Rome, April 2016

FCC study is counting on the help and support from the ABP group!