WP 5.5 Rail solutions N-S and E-W Market share for rail transport in Norway is fairly high domestic but very low on international transports Identify bottlenecks,

Slides:



Advertisements
Similar presentations
Truck Parking Strategy for the East West Transport Corridor WP6D Truck Stop with ITS Activity 1.
Advertisements

INTERMODADRIA Supporting intermodal transport solutions in the Adriatic area Kick-Off Meeting 7-8 February 2013 MARCHE REGION ROAD SYSTEM AND STATE PROPERTY.
Institute for Transportation and Logistics, TUHH TransBaltic Kick-Off, Sep 2009 in Malmö WP 5.2 Empty Container Management Facing the ‚empty container.
Towards an integrated transport system in the Baltic Sea Region Project implementation plans in the second period SC meeting, Kittilä, 6-7 May 2010 Wiktor.
Ministry of Enterprise, Energy and Communications Sweden Getting a grip on the Green Corridors Jerker Sjögren Green Corridors Stakeholders Forum Tallinn.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
Ministry of Enterprise, Energy and Communications Sweden Green Corridors Jerker Sjögren TransBaltic WP3 Seminar Stockholm
Project Proposal Project ? Project Sponsor Project Manager Version
A draft introduction to WP 5 Dr. Algirdas Šakalys.
Part-financed by the European Union (European Regional Development Fund) AGENDA 1) Coordinator’s presentation on the draft of Action plan (time-schedule)
The Process of Including Pan-European Corridor X (Xa) in the Rail Freight Corridor Network (in Line with Regulation 913/2010/EU)
1 SCORT 2010 September 21, 2010 David Valenstein Federal Railroad Administration State Rail Planning.
WP3 - Proceedings Consortium Meeting, Graz (27. – ) Peter Wintersteller Iris Pein.
ΑΝΝΕΧ 11-A by SCIRO. WP7 Dissemination and Implementation The objectives are the following: to build consensus around F-MAN To set-up the basis for further.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
URBACT III LAUNCH EVENT Brussels, 16 March The URBACT III programme  Objectives & Activities  Thematic coverage  3 Types of network  Beneficiaries.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat Iruma Kravale, The.
1 Transport sustainability and green corridors TransBaltic Project 1-2 February 2010, Gdańsk Prepared by: Urszula Kowalczyk, Marcin Burchacz Maritime Institute.
WP5.3. Deployment of ICT Toolbox Milestone 1 - Action Plan Leszek Andrzejewski Institute of Logistics and Warehousing Kick - off Meeting – Malmoe 15th.
EFRTC welcome & presentation EC project, AUTOMAIN workshop, Paris, 4 th October 2012 Imrich Korpanec, EFRTC Secretary General.
“”Capacity and services to road users” Task descriptions Paul van der Kroon, Paris November 2005.
Moving Towards a Sustainable Freight System. Executive Order B Action Plan – July 2016 Targets Actions Pilot Projects 2.
Competition and Regulation in India: Evaluation of Status & Perceptions and Associated Advocacy (ICRR Project, 2011) PROSAIG Advisory Group Meeting 8 th.
Project Part-financed by the European Union Towards an integrated transport system in the Baltic Sea Region Project presentation July 2009 Wiktor Szydarowski.
Project Part-financed by the European Union Towards an integrated transport system in the Baltic Sea Region Project presentation at the StratMoS conference,
Towards an integrated transport system in the Baltic Sea Region Project presentation at the TransBaltic foresight debate, Stockholm, 18 May 2010 Wiktor.
EFC issues for NRA’s Conclusions & recommendations Status report activities EFC workgroup.
Towards an integrated transport system in the Baltic Sea Region Presentation at the IX All-Russian Forum, ‘Strategic Planning in the Regions and Cities.
WP5.5. Railway solutions for the North-South and East-West flows Project Part-financed by the European Union Leszek Andrzejewski ILIM contribution WP5.5.
Roadmap to Bogor Goals Industry Report Roadmap Taskforce – Australia, Brunei Darussalam and Singapore.
WP3 - Proceedings Consortium Meeting, Reggio Emilia Doris Wiederwald Peter Wintersteller.
7th Framework Programme Regions of Knowledge FP-Regions Project n:o Baltic Flows Development of Rainwater Monitoring and Management.
Shiv Raj Bhatt ENTReC/UNDP Ministry of Commerce and Supplies EIF Asian Regional Workshop Kathmandu, June, 2010 Nepal’s Experience with the NTIS:
Green Partnerships Local Partnerships for Greener Cities and Region Stavroula Tournaki, Chemical Engineer MSc, ΕU Projects Manager 2 nd SC – Portalegre,
PILOT PROJECTS ON FUTURE OUTCOME/RESULT INDICATORS The Interreg IVB North Sea Region Programme Case Carsten Westerholt Project Devlopment and Communications.
Agenda Discussion about proposed topics for further studies Which topics should be prioritized? New private and public actors to be involved?
APEC TPT Busan September 2, 2003 Michael Wolfe New Cargo Security Project: Enhancing Secure Trade and Efficiency in the APEC Region with.
WP4: “ ” Meeting Marcelo Cintra do Amaral WP4: “ Transferability guidelines and Evaluation ” Meeting Marcelo Cintra do Amaral Grant.
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
4th Steering Committee Meeting Patras, July CHERPLAN Enhancement of Cultural Heritage through Environmental Planning and Management WP-6: Cultural.
WP4 – Policies, strategies, plans and innovative energy efficient solutions in urban transport Steering Committee Meeting Rijeka, Croatia 26/02/2015 Presented.
Task 5.5 Final report, Version 1 Rail transport solutions for North-South and East-West flows.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October/December2008.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October 08/January 09.
Work Package 6 2nd Consortium meeting, Provincia di Reggio Emilia, 3rd May.2011 Blaz Jemensek, PIL Klemen Gostic, PIL.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
This research has received funding from the European Community’s Seventh Framework Programme (FP7/ ) under grant agreement No WP3 update.
H2020 Transport 2014 call Brokerage event 18 December 2013 Recommendations for Presentations.
Subtheme 3: Linking Small producers to markets Theme Leader – Maximo Torero.
European Commission, Directorate General for Mobility and Transport (DG MOVE) Jose Anselmo – TEN-T Policy Officer Unit B2 – Coordination of TEN-T Priority.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
PREPARATION OF REGIONAL MARITIME AfT TRANSPORTATION PROPOSAL WTO Forum, Barbados, 27 January 2011 JOHN LEWIS CARICOM Secretariat.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Day Ahead Auctions Making progress, Jour Fixe 3rd Jour Fixe 31st of May Chair DTe Slides for the day.
Kick-off January Eric Kluijfhout Summary When: January 9-13 Where: Heerlen, OUNL Who: All WPs Organisers: WP1 + WP2.
INDIGO Outreach and Exploitation process Peter Solagna, Matthew Viljoen EGI.eu.
Towards an integrated transport system in the Baltic Sea Region Presentation at the StratMoS Final Conference, Brussels, 7 September 2011 Wiktor Szydarowski.
1 MARITIME TRANSPORT WORKING GROUP Maritime Policy, Ports and Short-Sea Shipping MEDA Motorways of the Sea Sub-Group 4 th Meeting Brussels, 19 December.
he transport development progress in Slovenia the EASYCONNECTING hint
CBP Biennial Strategy Review System
Partner meeting Vilnius,
Baltic Sea cooperation for reducing ship and port emissions through knowledge- & innovation-based competitiveness BSR InnoShip Baltic Sea cooperation for.
How do airports plan to solve their future ATM challenges?
CBP Biennial Strategy Review System
RECARE set-up Rudi Hessel on behalf of coordination team
Digital Transformation in the Danube Region Project
Innovative WASH Management Models for the Urban Poor in Ghana
Presentation transcript:

WP 5.5 Rail solutions N-S and E-W Market share for rail transport in Norway is fairly high domestic but very low on international transports Identify bottlenecks, barriers, hindrances for rail freight Find solutions to ease these

Period 1 Month 1-6 ActivityResponsibility Creating team of stakeholdersInterested partners Study of former projects and surveysENCN Information from actual studies and reportsAll partners Input to focus areas and bottlenecksAll partners Description of possible own specific project under task 5.5Actual partners Develop draft detailed task planENCN Comments to draft planAll partners Detailed action plan to all partnersENCN

Period 2 Month 7-12 ActivityResponsibility Description of bottlenecks and problems; e.g. laws and regulations, infrastructure capacity, flexibility of material, logistics hubs etc. All partners Good examples of problem solving and/or activities to improve rail freight competitiveness All partners National and international intentions and/or activities that might improve rail freight competitiveness All partners Other proposals for improvement of rail freight competitivenessAll partners Information from possible own specific projectActual partners Draft report on problems, bottlenecks and recommendations for solutionsENCN Comments to draft reportAll partners Report on problems, bottlenecks and recommendations for solutionsENCN

Rest of project MonthMain outputs 13-18Created public and private alliance to solve identified problems 19-24Launched public-private actions to combat and solve identified transport obstacles and barriers 25-30Prepared pre-feasibility study, conclusions transferred to discussion on harmonisation needs for pan-Baltic transport planning 31-36Conclusions inserted to the regional action plan of TransBaltic. Dissemination activities and follow-up discussion with business stakeholders for full deployment of pilot demonstrations.