2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.

Slides:



Advertisements
Similar presentations
Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia
Advertisements

SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview
FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
Wade E. Kline, AICP Community Development Planner.
GMVUAC Presentation June 1, 2009 David Mark and Jim Ishimaru Road Services Division King County Department of Transportation.
Northwest Florida Military Sustainability Partnership August 7, 2012.
Peek – ACS Lite Deployment Quixote Traffic Corporation Peter Ragsdale August 17, 2006.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Northwest Florida Transportation Corridor Authority.
A Better & Safer US Highway 90 along the Mississippi Gulf Coast By Mike Stokes Intelligent Transportation Systems Manager MDOT – Traffic Engineering.
Presented by: SAGE KAMIYA, P.E., PTOE
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
TRANSPORTATION ALTERNATIVES PROGRAM FY 2016 Project Priorities.
Lawrence Regional ITS Architecture Update. Today’s Agenda What is ITS? Review 2007 ITS Plans Review the proposed work plan Define project goals and objectives.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Building a Traffic Signal and Sign Inventory for the City of Edmond GIS Staff updated traffic feature classes and the related objects based on information.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Columbus Computerized Traffic Signal System Eagan L. Foster, P.E. Transportation Division Columbus Public Service Department Where have we been? Where.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
Prepared by the TIME Task Force Operations Committee 1 T.I.M. TEAMS T.I.M. TEAMS TIM Traffic Incident Management Team.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
Disaster Preparation Guide 2012 Citizen Information Lines (only active during disasters) Escambia County(850) Santa Rosa County(850)
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Decision Support Needs for Transportation Systems December 5, 2000 Emil Wolanin Montgomery County, Maryland.
Implementation Transit Priority System and Mobile Internet Passenger System in the City of Los Angeles Kang Hu and Chun Wong City of Los Angeles Department.
ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
Connected Vehicles Workforce FHWA Vehicle-to-Infrastructure
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
Draft Congestion Management Process Plan October 7, 2015.
FY 2017-FY 2021 Project Priorities Bay County TPO Gary Kramer Senior Planner, TPO Staff
Transportation Border Working Group (TBWG)
Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic.
Overview of King County Transit Signal Priority Program T3 Webinar January 22, 2008.
Presented By: Committee Member: Sally Bussell Fox, Attorney Emmanuel, Sheppard & Condon, P.A. 30 South Spring St. Pensacola, Fl (850)
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
The Safety Impact of the Automated Photo Red Light Program Prepared by Lieutenant Jim Lemmon San Leandro Police Department Traffic Division.
ITS P ROGRAM O VERVIEW JEFFREY F. PANIATI ITS JOINT PROGRAM OFFICE.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
1 Benefits of ITS During Hurricane Evacuations Hurricane Evacuation Transportation Workshop April 5, 2003.
City of Santa Cruz American Recovery and Reinvestment Act (ARRA) December, 2009 Update.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
Project Overview – Phase 1
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Intelligent Transportation Systems
Signal Improvement Project COMMUNITY DEVELOPMENT DEPARTMENT
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
River to Sea TPO Meeting US 92/International Speedway Boulevard
Florida Department of Transportation
CR184 (Quintette Road) Bridge #480045
CONGESTION MANAGEMENT PROCESS
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

Intelligent Transportation Systems The technology tools and systems that local agencies and jurisdictions use to manage transportation operations and to increase safety and efficiency

The Regional ITS Plan Purpose: Identify existing and future ITS communications networks and devices needed to enhance transportation and economic competitiveness throughout the region Vision: Implement a regional ITS network to maximize the safety and efficiency of transportation in the region

Regional Loop Fiber optic ring along US 98 to SR 231 in Bay County, north to I-10, west on I-10 to I-110 in Escambia County, and south on I-110 to US 98 ▫784,000 of 822,935 linear feet of fiber optic cable completed or currently being installed

Florida-Alabama TPO ITS working group made up of representatives from: ▫Escambia County ▫Santa Rosa County ▫City of Milton ▫City of Gulf Breeze ▫City of Pensacola ▫FDOT Conducting a feasibility study and ITS Implementation Plan for development and operations of an Advanced Transportation Management System

Okaloosa-Walton TPO – Okaloosa County Travel time monitoring system installed at four intersections on US 98 to assist with the Cody Avenue fly-over project ▫Parish Blvd, Florosa Elem, Cody Ave, Doolittle Blvd 10 CCTV’s installed at various locations throughout the County 6 radar type detection systems installed 8 battery back-up systems for traffic signals installed

Okaloosa-Walton TPO – Walton County Walton County has entered into a Joint Participation Agreement with FDOT to fund a traffic engineer ▫Facilitate ITS deployment in Walton County ▫Maximize capabilities of existing signal system ▫Procure additional resources to support ITS implementation

Bay County TPO Recent Projects: ▫Two adaptive traffic control systems installed  Panama City Beach Parkway from SR 79 to Woodlawn Drive  23 rd Street from SR 77 to Lisenby Avenue ▫Extended the fiber optic system north along SR 79 from Panama City Beach Parkway to SR 388 Total System: ▫137 intersections running in the ITS system ▫86 pan/tilt/zoom cameras ▫4 Dynamic Messaging Systems ▫2 remote weather stations

Questions? Kate Daniel, Regional Planner (850) ext. 245