Demonstrators and Pan-European Services Laboratory WP5 session.

Slides:



Advertisements
Similar presentations
Pervasive Wireless Solutions © Copyright IBM Corporation 2004 IBM La Gaude Smart Home / Intelligent Building Jean-Michel Corrieu IBM Europe Technical Manager.
Advertisements

Jose Jimenez Director. International Programmes Telefónica Digital.
ACTS Programme M obile I ntelligent A gents for M anaging the Information I nfrastructure ACTS Programme AC338.
0 DOD/DT/CEDCV – 20 th & 21 st January Paris meeting SAGEM RTD Activities C2-Sense project Paris – 20 & 21 January 2015.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
LONG: Laboratories Over Next Generation Networks. Project Description & WP1: Management.
Part I : The EUMEDGRID-Support Project Abderrahman El Kharrim Joint EPIKH/EUMEDGRID-Support Event in Rabat Rabat,
AMI Home Area Network Update SAG Meeting March 18, 2014.
MUSE: Challenges to Integrate the Multi-Disciplinary Field of BB Access in One Project ECOC 2006 Cannes,
LONG: Laboratories Over Next Generation Networks. LONG Laboratories Over Next Generation Networks Jordi Domingo-Pascual Josep Mangues-Bafalluy Advanced.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
ENeo Labs and the Spanish Connected Home Market: User Benefits and the New Value Chain Javier Zamora, Ph.D. General Manager, eNeo Laboratories, S.A.
IST project ePerSpace N° ePerSpace Call ID: FP IST-1 Contract N°: Date : 11/03/2004 Concertation meeting Brussels.
The HITCH project: Cooperation between EuroRec and IHE Pascal Coorevits EuroRec 2010 Annual Conference June 18 th 2010.
1 SWE Introduction to Software Engineering Lecture 3 Introduction to Software Engineering.
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
Services Flexible Workstyle and People-Centric IT Windows Accelerate: Deployment Windows 8.1 Proof of Concept (Window 8.1 PoC) will demonstrate how the.
Decentralised and Remote Access to Confidential Data in the ESS (ESSnet DARA) Overview and State of the Art Maurice Brandt Destatis FIRST EUROPEAN DATA.
ETSI Home Networking activities Rainer Münch ETSI TISPAN Chairman Presenter: Ian Spiers DOCUMENT #:GSC13-GTSC6-20r1 FOR:Presentation SOURCE:Rainer Münch,
ANCIT WORKSHOP Torino March Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Thinking the Future: European Services for Official Statistics (ESCOS) and European Remote Access Network (EuRAN) David Schiller (IAB) and Christof Wolf.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
IP-Based Emergency Applications and Services for Next Generation Networks PEACE Presented by Suji Gunaratne PhD.
Business Systems Development SDLC and introduction to the Microsoft Solutions Framework Team and Process Models.
Agenda Context and Vision FI-WARE Architecture
© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
FI-PPP Overview Juanjo Hierro – Chief Architect FI-WARE.
Telefónica I+D – WP4 – Overview | Enabling Community Communications-Platforms and Applications | WP4 session Terminal Software and Residential.
Advanced Next gEneration Mobile Open NEtwork Tridentcom th International Conference on Testbeds and Research Infrastructures for the Development.
U.S. Department of Agriculture eGovernment Program July 15, 2003 eAuthentication Initiative Pre-Implementation Status eGovernment Program.
Planning for Successful Simulation Simulation Planning Guide - A Guided Discussion.
TESTBED FOR FUTURE INTERNET SERVICES TEFIS at the EU-Canada Future Internet Workshop, March Annika Sällström – Botnia Living Lab at Centre for.
Windows Server ® 2008 R2 Remote Desktop Services Infrastructure Planning and Design Published: November 2009.
Carlos INFSO.E.3 Extended Home Environments in the IST 4th Call Cross Programme Themes.
BlogForever Project Presentation Vangelis Banos, Project Manager, ALTEC Software Stratos Arampatzis, Dissemination Manager, Tero Dr. Alexandra Cristea,
Windows Server ® 2008 R2 Remote Desktop Services Infrastructure Planning and Design Published: July 2008 Updated: February 2011.
ANDROME – WP3 - Applications definition and development | Enabling Community Communications-Platforms and Applications | WP3 : Applications.
FI-WARE Overview Juanjo Hierro Telefonica Digital, Coordinator and Chief Architect, FI-WARE
Ivo Rosol, OKsystem Middleware.
JEMMA: an open platform for a connected Smart Grid Gateway GRUPPO TELECOM ITALIA MAS2TERING Smart Grid Workshop Brussels, September Strategy &
WP Strategic Objective Networked Audio Visual Systems and Home Platforms.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
The EUMEDGRID-Support Project Mario Reale / GARR - Italy Project Technical Manager Algiers, July 4, 2010.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
Jose Jimenez Telefónica I+D Future Network & Mobile Summit 2011 The vision of Future Internet in the FI PPP Core Platform project.
WP0 session Management and External Relations. Código 00/00 2 Index Overview A1: Project co-ordination A2: Dissemination and Exploitation Plans A3: External.
IST project ePerSpace N° IST integrated project ePerSpace Contract N°: Ádám Kapovits, Eurescom 8/11/2004.
Telefónica I+D – WP4 – Overview | Enabling Community Communications-Platforms and Applications | Kick-off Conclusions Kick-off meeting June.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
FP January 9, 2016 Autors: Ján hreňo, Marek Skokan, Tomáš Sabol1 Project Access-eGov Ján Hreňo - Marek Skokan - Tomáš Sabol
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
ENVISION Enriched Network-aware Video Services over Internet Overlay Networks David Griffin, UCL 5th FP7 Networked Media Concertation Meeting 3-4 February.
- D1 - FT/Networks and Carriers Division ITU-T WORKSHOP on NGN (Geneva 9-10 July 2003) NGN an architecture for 21st century networks? ITU-T NGN Workshop.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
WAVECOM©2005. All rights reserved 1 Intelligent Device Management Service Offer Emmanuel Walckenaer April Lisboa.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Overview Instituto Pedro Nunes Co-Living 12/3/ Paulo Freitas - Instituto.
THE FUTURE INTERNET PPP User-driven Innovation Future Internet Conference October 24, 2011 Nuria de Lama Representative of Atos Research & Innovation.
OUTCOMES OBJECTIVES FUNCTIONS ACTIONS TERRITORIES LOCATIONS MARKET SEGMENTS TIME LINESCHALLENGE IMPACT RESOURCESACTIVITIESCHANNELS RELATIONS PARTNERS CUSTOMERS.
Discussion on oneM2M and OSGi Interworking Group Name: ARC Source: Jessie, Huawei, Meeting Date: Agenda Item:
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
Bob Jones EGEE Technical Director
Steve Brewer Stichting European Grid Initiaitive
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Presentation transcript:

Demonstrators and Pan-European Services Laboratory WP5 session

Código 00/00 2 Index Overview A1: Trial and European Lab Planning A2: Integration Tests A3: User Testing Sessions A4: (Field) Trial Deployment A5: (Operational) Trial Support

Código 00/00 3 Index Overview A1: Trial and European Lab Planning A2: Integration Tests A3: User Testing Sessions A4: (Field) Trial Deployment A5: (Operational) Trial Support

Código 00/00 4 Overview: Goals and structure (I) l Provide demonstrators and service laboratories, covering technical and user acceptance as well as related operational and business aspects. l WP5 Leader: ??? (formerly Telenor) l Main Tasks: n A1: Trial and European Lab Planning (May 04 – January 05) l Leader: ??? (formerly Telenor) n A2: Integration Tests (October 04 – March 06) l Leader: Telefónica I+D n A3: User Testing Sessions (January 05 – July 06) l Leader: France Telecom n A4: (Field) Trial Deployment (January 05 – September 06) l Leader: Belgacom n A5: (Operational) Trial Support (January 05 – September 06) l Leader: Alcatel

Código 00/00 5 Overview: Goals and structure (II) l Determine another partner for the key activities of WP5. l WP leader. l A1 leader.

Código 00/00 6 Overview: List of milestones and deliverables

Código 00/00 7 Overview: Manpower allocation

Código 00/00 8 Index Overview A1: Trial and European Lab Planning A2: Integration Tests A3: User Testing Sessions A4: (Field) Trial Deployment A5: (Operational) Trial Support

Código 00/00 9 A1: Main goals and tasks l Main objective: detailed plan describing the different lab and field trials. l Decide the test sites to be included. l Scheduled for first 8 month of the project, until the first iteration of the project begins. l Coordinate with other WP. l Task Leader: ???

Código 00/00 10 A1: Deliverables and contributors l The deliverable related to this activity is: WP5D1 Trial Execution plan (01/2005). l Contributors to this activity are: n The different test site contributors: l Belgacom l Elisa l France Telecom l Telefónica I+D... n Services and platform developers: Alcatel, Visonic, Telvent... n WP1 main partner (particularly those involved in the trial support activity).

Código 00/00 11 A1: First steps l Decide the test sites and trials to be done. l Define and plan the different trials and test sites n Services to be included in each (with WP1, WP3). n Size and resources to be included. n Scheduling. n Platform integration calendar. n Testing calendar. l Coordinate with the rest of WP

Código 00/00 12 A1: Belgacom trials l Field trial focused on: n community communications. n virtual interactive communities. l Demonstrator showing the possibilities of service aggregation platform. l Experiments with new connected home/family services will be carried out n Third parties could be also included. l Trial planned using a VDSL pilot network and/or an ADSL access network with capacity up 3 Mb/s. Between customers

Código 00/00 13 A1: Elisa trials l Multi-device multimedia community applications as well as home network management and equipment. l Trial planned on ADSL and/or IP-enabled Cable-TV network in combination with wireless solutions. Elisa test bed and service trial environment. n Elisa Research laboratory and trial environment. n Access to other test beds (Test Bed Finland initiative). Access to public networks. l Between customers. Coordinated with the test-bed Finland initiative.

Código 00/00 14 A1: France Telecom test site l Home demonstration area situated in Lannion premises. l Install all home services and to check their interoperability (technical and usage). l Features: n Telemetry platform able to provide security (alarm management) and comfort (device control and home watching). n OSGi technology enabled on residential gateway. n Multimedia gateway.

Código 00/00 15 A1: Telefónica I+D test site l Install and operate the service aggregator in its facilities. l Test lab to check the platform and services of this project, including aspects as interconnectivity and interoperation. l Demostrator facility: The digital home for user experiences n Emulates a small flat composed of different ambiances. n Residential gateway (OSGi compliant). n Combination of fixed and wireless technologies as network infrastructure.

Código 00/00 16 A1: Budget for equipment

Código 00/00 17 A1: Platforms and equipment l Alcatel platforms: n HIPP-controller managing the residential gateway and networking elements. n Open Media Suite application platform for hosting and managing the multimedia application layer (???) l Visonic Residential Gateway Platform that will function as a Services Gateways platform at home. n New two-phase strategy. l Telvent equipment: n Gateway operator application, several services, residential gateways, a set of home networks and appliances. n New test Site (???)

Código 00/00 18 Index Overview A1: Trial and European Lab Planning A2: Integration Tests A3: User Testing Sessions A4: (Field) Trial Deployment A5: (Operational) Trial Support

Código 00/00 19 A2: Main goals and tasks l Proof of concept of the deployment of the services and applications, providing technical feedback to WP2, WP3 and WP4. l Adapt the bouquet of services to the different needs of the different sites. l Done in simulated environments and labs, to validate the services and management platforms. l The interconnection of the different labs will be set up to build the integrated trial. l Task Leader: Telefónica I+D

Código 00/00 20 A2: Deliverables and milestones l No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report. l Milestones, regarding the end of each of the services iterations : n WP5M2 1st Phase Integration Completed: 01/2005 n WP5M5 2nd Phase Integration Completed: 06/2005 n WP5M8 3rd Phase Integration Completed: 01/2006 n WP5M9 Integrated Trial and Test Report: 04/2006

Código 00/00 21 A2: Contributors and first steps l Contributors to this activity are: n The different test site contributors: l Belgacom l Elisa l France Telecom l Telefónica I+D... n Services and platform developers: Alcatel, Visonic, Nokia, Thompson R&D, Telvent... l First activities: n Set up the testing sites for the platforms and services (proof of concept and demos). n Elaborate a testing plan for the different sites.

Código 00/00 22 Index Overview A1: Trial and European Lab Planning A2: Integration Tests A3: User Testing Sessions A4: (Field) Trial Deployment A5: (Operational) Trial Support

Código 00/00 23 A3: Main goals and tasks l Implementation of user testing sessions. n Adaptation to the country. n Different services and platforms to be tested. l Provide feedback to the other WPs about user reactions. l Inclusion of real users. l Major topics to be addressed: n Application usability. n Community aspects. n Interconnection of service, platforms and trial interoperability. l Task Leader: France Telecom.

Código 00/00 24 A3: Deliverables and milestones l No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report. l Milestones, regarding the end of each of the services iterations : n WP5M3 1st Phase User Testing Session Results: 03/2005 n WP5M6 2nd Phase User Testing Session Results: 10/2005 n WP5M10 3rd Phase User Testing Session Results: 07/2006

Código 00/00 25 A3: Contributors and first steps l Contributors to this activity are: n The different site contributors, where user sessions are planned: l Belgacom l France Telecom l Telefónica I+D l Telvent (???) l First activities: n Elaborate a method to gather the feedback from users for the different sites. n Set up the process to choose the users that will take part in the sessions. n Set up the demonstrators and enable services and platforms.

Código 00/00 26 Index Overview A1: Trial and European Lab Planning A2: Integration Tests A3: User Testing Sessions A4: (Field) Trial Deployment A5: (Operational) Trial Support

Código 00/00 27 A4: Main goals and tasks l Implementation of field trials in different European countries. n Deploying the relevant applications and service bundles. l Provide feedback to the other WPs, compiling the results of the trials. l Evolve their existing pilot and trial network infrastructures for establishing a pan-European service laboratory n Performing relevant infrastructure upgrades. n Providing coordination or interconnection between trials site. n Connecting and/or upgrading live customer base. l Task Leader: Belgacom.

Código 00/00 28 A4: Deliverables and milestones l The deliverable, WP5D12, Conclusion of Trials report, is due on this task. (09/2006) n All other tasks in WP5 will also contribute to the document. l Milestones, regarding the end of each of the services iterations : n WP5M4 1st Phase Trial Completed: 05/2005 n WP5M7 2nd Phase Trial Completed: 12/2005 n WP5M11 3rd Phase Trial Completed: 09/2006

Código 00/00 29 A4: Contributors and first steps l Contributors to this activity are: n The different site contributors, where field trials are planned: l Belgacom l Elisa l First activities: n Elaborate a method to gather the feedback from users for the different sites. n Set up the process to modify the current trials, in order to integrate Encompas with existing infrastructure. n Set up the infrastructures and enable services and platforms.

Código 00/00 30 Index Overview A1: Trial and European Lab Planning A2: Integration Tests A3: User Testing Sessions A4: (Field) Trial Deployment A5: (Operational) Trial Support

Código 00/00 31 A5: Main goals and tasks Implement the required customer and technical support needed to run a successful lab and field trial operations. n Underlying infrastructure. n Demonstrators. n Service laboratory. l Main focuses: n Customer care centre function n Technical operations support n Systems engineering support l Task Leader: Alcatel.

Código 00/00 32 A5: Deliverables and contributors l No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report. l Contributors to this activity are: n Platform developers l Server side: Alcatel, Telefónica I+D. l RG side: Telvent, Thompson R&D, Visonic n Services developers l TV centered: Alcatel, Androme, K.U. Leuven l Home security, monitoring: Elisa, France Telecom, Telvent l AV community applications: Alcatel, Elisa, Nokia.

Código 00/00 33 A5: First steps l Identify the persons who will be responsible for offering the support (regarding the different components). l Form the different supporting groups, which should be coordinated with the other tasks. l Set the support process to be ready before the beginning of the A2, A3 and A4 tasks within this WP.