Oliver Boine-Frankenheim, High-Current Beam Physics Accelerator Facility for Energetic Ion Beams of High Intensity and Quality Inter’l Accelerator Project.

Slides:



Advertisements
Similar presentations
FAIR accelerator R&D Oliver Kester GSI Helmholtzzentrum für Schwerionenforschung Darmstadt and IAP Goethe-Universität Frankfurt.
Advertisements

FAIR Synchrotrons SIS100/300
L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities P. Forck et al.,
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December GSI UHV System Upgrade The GSIThe GSI Future Accelerator Facility for Beams.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Helmholtz International Center for Oliver Boine-Frankenheim GSI mbH and TU Darmstadt/TEMF FAIR accelerator theory (FAIR-AT) division Helmholtz International.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
Intensity Limits and Beam Performances in the High-Energy Storage Ring
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
COULOMB ’05 Experiments with Cooled Beams at COSY A.Lehrach, H.J.Stein, J. Dietrich, H.Stockhorst, R.Maier, D.Prasuhn, V.Kamerdjiev, COSY, Juelich, I.Meshkov,
Peter Spiller, Heavy Ion Fusion Symposium Princeton June 7-11, 2004 Accelerator Plans at GSI for Plasma Physics Applications.
Oliver Boine-FrankenheimSIS100-4: High current beam dynamics studies SIS 100 ‘high current’ design challenges o Beam loss in SIS 100 needs to be carefully.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
I. Strasik et al. ● Halo Collimation of Proton and Ion Beams in FAIR Synchrotron SIS 100 ● CERN Halo Collimation of Proton and Ion Beams in.
Oliver Boine-Frankenheim, HB2008 High Intensity Challenges of the FAIR Project Oliver Boine-Frankenheim, GSI, Darmstadt.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
ICFA Workshop, December 9-12, 2003 Andreas Krämer - GSI Darmstadt1 Ion Beam Induced Desorption Yield Measurements at GSI The 13th ICFA Beam Dynamics Mini-Workshop.
Oliver Boine-Frankenheim, High Current Beam Physics Group Simulation of space charge and impedance effects Funded through the EU-design study ‘DIRACsecondary.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
Experimental and Theoretical Study of Energy Deposition and Residual Activation Induced by Uranium Ions to Model the Beam Loss Hazards in the GSI Future.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Lecture17(Course Summary).PPT - E. Wilson - 3/3/ Slide 1 COURSE SUMMARY A Design Study of a Compressor ring for A Neutrino Factory MT 2009 E. J.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
6 July 2010 | TU Darmstadt | Fachbereich 18 | Institut Theorie Elektromagnetischer Felder | Sabrina Appel | 1 Micro bunch evolution and „turbulent beams“
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Halo Collimation of Protons and Heavy Ions in SIS-100.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Status of HESR 18th March Gießen Dieter Prasuhn.
Collimation Concept for Beam Halo Losses in SIS 100
Calculation of Beam Equilibrium and Luminosities for
FAIR high intensity beam dynamics
HIAF Electron Cooling System &
Simulation of Luminosity Variation
Status of the beta-beam study
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Vacuum and electron cloud issues at the GSI present and future facilities Giovanni Rumolo, O. Boine-Frankenheim, I. Hofmann, E. Mustafin Overview on the.
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
FFAG Accelerator Proton Driver for Neutrino Factory
Collimation for beta-beams
Project "Nuclotron M" / NICA
A Design Study of a Compressor ring for
Explanation of the Basic Principles and Goals
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
JLEIC Ion Integration Goals
JLEIC 200 GeV ion beam formation options
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Oliver Boine-Frankenheim, High-Current Beam Physics Accelerator Facility for Energetic Ion Beams of High Intensity and Quality Inter’l Accelerator Project The International Accelerator Project at GSI O. Boine-Frankenheim, High-Current Beam Physics, GSI, Darmstadt

Oliver Boine-Frankenheim, High-Current Beam Physics Unilac SIS18 ESR Ion sources Tumor therapy The GSI Accelerator Facility 2004: /s U GeV/u 110 Ds 269

Oliver Boine-Frankenheim, High-Current Beam Physics Superconducting double-synchrotron SIS 100/ GeV/u U /s 29 GeV p /s 22 (35) GeV/u U /s  Gain compared to the existing facility / new and special beam propoerties: - Primary beam intensities: Factor 100 – Ion energy: Factor 15 (25) Scheme of the New Accelerator Facility

Oliver Boine-Frankenheim, High-Current Beam Physics NESR CR  Gain compared to the existing facility / new and special beam propoerties: - Primary beam intensities: Factor 100 – Ion energy: Factor 15 (25) - Secondary beam intensities for radioactive Ions: up to a factor New: cooled antiproton beams up to 15 GeV - Special: intense cooled radioactive ion beams - efficient parallel operation of several experiments HESR Superconducting double-synchrotron SIS 100/ GeV/u U /s 29 GeV p /s 22 (35) GeV/u U /s Scheme of the New Accelerator Facility

Oliver Boine-Frankenheim, High-Current Beam Physics BMBF Pressemitteilung vom : Die GSI soll gemeinsam mit europäischen Partnern ihre Anlagen stufenweise ausbauen und zu einem führenden europäischen Physikzentrum werden. Mindestens ein Viertel der Kosten in Höhe von 675 Millionen Euro soll von ausländischen Partnern aufgebracht werden. Bird‘s Eye View on the New Facility

Oliver Boine-Frankenheim, High-Current Beam Physics 2x120 superconducting (SC) dipole magnets SC quadrupole magnets The SIS 100/300 Double-Synchrotron Two synchrotrons in one tunnel: 5xSIS= 1080 m SIS 100: Booster and compressor ring SIS 300: ‚Stretcher‘/ high energy ring Nuclotron-type dipole magnet: B=2T, dB/dt=4T/s RHIC-typ dipole magnet: B=4T (6T), dB/dt=1T/s

Oliver Boine-Frankenheim, High-Current Beam Physics SIS 100/300: Low Loss Design /s 2.5 GeV/u U 28+ : 100 kW (1 TW) /s 1 GeV/u U 73+ : 0.4 kW SIS 18 average power: SIS 100/300 average (peak) power: SIS 100/300 SIS 18 Quenching/Lifetime of SC magnets: tolerable beam loss in the SC coils: < 1 % Structure activation: Hands-on maintenance requires losses < 1 % Beam loss induced outgassing Dynamic pressure below 5x10 12 mbar requires < 1 %

Oliver Boine-Frankenheim, High-Current Beam Physics U 28+ RF Bunch Gymnastics in SIS 100 Injection and acceleration of (hollow) buncheshollow rebunching in a barrier bucket precompression fast bunch rotation Key Issues: Losses < 1% and Dilution Factor < 2 ! 40 kV/m 500 kHz 26 compressor cavities (20 m) filled with high-  cores: + about 20 ‘normal’ acceleration cavities = 1 MV total ! U GeV/u 50 nsP max  1 TW Beam loss budget: Projectil range in steel  1 cm

Oliver Boine-Frankenheim, High-Current Beam Physics Nonlinear Magnet Fields and Beam Loss SIS 100 dipole field errors + aperture: Beam envelope Vacuum pipe Iron Key issue: Can we store a (thick) beam for 1 s (10 5 turns) in a nonlinear machine with space charge ? Long term stability (T=1 s): nonlinear magnet errors nonlinear space charge force (Horizontal) betatron equation of motion: linear betatron motion a=55 mm b=27 mm

Oliver Boine-Frankenheim, High-Current Beam Physics Bunch compression in SIS 18/100 2D (!) Simulation of fast bunch compression. × Space charge induced crossing of structure resonances in SIS during fast (100 turns) bunch compression: Q x +3Q y =12 3Q v =12 4Q v =12 ∆Q=-1 in SIS 100 ! 3D Simulation code development (self-consistent space charge) has been started ! Key question: bunch compression with losses < 1%

Oliver Boine-Frankenheim, High-Current Beam Physics Injection of secondary beams into the collector ring (CR) requires primary beam puls length  < 1  s and d≈1 mm on the target ! Problem: Hydrodynamic expansion of the target Pulse length/ns Pulse Target Solution (?): Pulse length shorter 50 ns Target recovery with 1 Hz (liquid Lithium) High-Power (TW) Exotic Ion Production Target 1 GeV/u U /pp Plasma physics targets

Oliver Boine-Frankenheim, High-Current Beam Physics CR+NESR: 2x24 large aperture (  180 mm) superferric (1.6 T) dipole magnets 5 ‘decompressor’ cavities (200 kV) + stochastic cooling Electron and stochastic cooling + eA collider 210 m circumference (approx. 2xESR) 180 m circum- ference Fast debunching of exotic nuclei from Target/SFRS Collector and Accumulator Rings for Exotic Ions

Oliver Boine-Frankenheim, High-Current Beam Physics 12 m H - Cyclotron 30 m Solenoid field High voltage (8 MV) tank HESR Feasibility study of fast electron cooling for the HESR, Budker Institute, Novosibirsk, RUS HESR Electron Cooler Monte-Carlo-Simulation of pbar cooling: 1 A electron beam ESR Cooler: 3 m, 300 kV Control of Antiproton Beam Quality at High Energies

Oliver Boine-Frankenheim, High-Current Beam Physics U 28+ Lifetime and UHV Requirements U 28+ Beam lifetime measurements in SIS: ‘Born Approximation’ Measurement CTMC-Simulation Projectile-Stripping in the residual gas: U 28+ operation with 1 % stripping loss means: 10 s lifetime in SIS (4 Hz) or P=5x mbar 100 s lifetime in SIS 100/300 (T= 1 s) or P=5x mbar 8x mbar Scaling of the stripping cross section:

Oliver Boine-Frankenheim, High-Current Beam Physics Beam Loss Distribution in SIS 100 U28+ beam U28+/U29+ beam stripping capture Dipole magnet U 29+ corresponds to a momentum offset of dp/p=-3.5 % P. Spiller (2003)

Oliver Boine-Frankenheim, High-Current Beam Physics  ≈ 10 4 !!! Gas particle:X Uranium beam Desorption coefficient: Stripping losses: U 29+ Beam pipe (steel) Pressure instability ! Beam particle: U 28+ Dynamic-UHV in SIS 18/100/300 talk (canceled) by Edil Mustafin: Modeling Dynamic pressure limit in SIS 100/300: (  =10 3, S/L=100 l s -1 m -1,  P=5x mbar) Threshold for pressure instability in SIS 18: Mustafin, et al. (NIM A, 2003)

Oliver Boine-Frankenheim, High-Current Beam Physics Control of dynamic UHV in SIS 18/100/300  Short cycle time and short sequences SIS12 :10 T/s - SIS100 : 4 T/s  Enhanced pumping power (talk by H. Reich) Cryo pumps/panels, NEG coating/stripes  Localization of losses and controle of desorption gases Prototype desorption collimator installed  Low-  materials (talk by A. Krämer) Desorption rate test stand comissioned Desorption test-stand Novel collimators

Oliver Boine-Frankenheim, High-Current Beam Physics,R&D Challenges’ Fast ramping SC magnets: extremly demanding RF systems: at the limit of technical feasibility Control of dynamic vacuum (UHV): at (or presently even beyond) the limit Control of beam loss/collective effects: extremly demanding, many open questions Fast stochastic/electron cooling: at the limit of technical feasibility Talks during the workshop: Andreas Krämer (SIS 18 measurements+ desorption teststand) Hartmut Reich (UHV design) Edil Mustafin (Dynamic vacuum modeling)