One Corps Serving the Armed Forces and the Nation Mel Price Locks & Dam Miter Gate Inspections Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006
One Corps Serving the Armed Forces and the Nation 3 October 2004 – Auxiliary Lock Downstream Miter Gate
One Corps Serving the Armed Forces and the Nation Auxiliary Lock Downstream Miter Gate
One Corps Serving the Armed Forces and the Nation FLOW IL LEAF MO LEAF Leafs Forced Downstream From Normal Mitered Position
One Corps Serving the Armed Forces and the Nation Initial Inspection Determine scope of damage Gather “forensic evidence”
One Corps Serving the Armed Forces and the Nation Overall Distortion – Approximately 2 Feet
One Corps Serving the Armed Forces and the Nation Local Damage – Miter Ends
One Corps Serving the Armed Forces and the Nation Damage to Gate Anchorages Secondary Anchorage Primary Anchorage
One Corps Serving the Armed Forces and the Nation Primary Anchorage Fatigue
One Corps Serving the Armed Forces and the Nation Secondary Anchorage Deflection
One Corps Serving the Armed Forces and the Nation Miter Block – IL Leaf
One Corps Serving the Armed Forces and the Nation Timber Fender – MO Leaf
One Corps Serving the Armed Forces and the Nation Miter Block – IL Leaf
One Corps Serving the Armed Forces and the Nation Diagonal Failure - Buckled
One Corps Serving the Armed Forces and the Nation Cracked Gusset – IL Leaf
One Corps Serving the Armed Forces and the Nation Cracked Gusset – MO Leaf
One Corps Serving the Armed Forces and the Nation Failed Operating Struts
One Corps Serving the Armed Forces and the Nation Operating Arm Failure Tube Failure Bolts (compression)
One Corps Serving the Armed Forces and the Nation Operating Strut Failure – IL Leaf Failure Bolts (compression) Intact Fractured Strut (tension)
One Corps Serving the Armed Forces and the Nation Failure Bolt (compression) Fractured Strut (tension) Operating Strut Failure – MO Leaf
One Corps Serving the Armed Forces and the Nation Failed Operating Strut
One Corps Serving the Armed Forces and the Nation Impact Marks
One Corps Serving the Armed Forces and the Nation Impact Marks
One Corps Serving the Armed Forces and the Nation Gouged Operating Strut
One Corps Serving the Armed Forces and the Nation Failure Tube Bolts
One Corps Serving the Armed Forces and the Nation Inspection of Leafs On Gate Barge
One Corps Serving the Armed Forces and the Nation Surveying Leaf
One Corps Serving the Armed Forces and the Nation Survey Results – Illinois Leaf 2’ 1’ 1.5’ 0.5’ 2.21’ max deflection
One Corps Serving the Armed Forces and the Nation Survey Results – Missouri Leaf 1.6’ max deflection
One Corps Serving the Armed Forces and the Nation Manlift for Inspection
One Corps Serving the Armed Forces and the Nation Inspection From Manlift
One Corps Serving the Armed Forces and the Nation Deformed Diaphragms Over 2” In Some Locations (most ½” or less)
One Corps Serving the Armed Forces and the Nation Inspections - Leafs Horizontal
One Corps Serving the Armed Forces and the Nation Leafs In Horizontal Position
One Corps Serving the Armed Forces and the Nation Crack at Diaphragm Flanges
One Corps Serving the Armed Forces and the Nation Crack in Girder Flanges
One Corps Serving the Armed Forces and the Nation Torch Cut Hole in Girder Flange
One Corps Serving the Armed Forces and the Nation Inspection of Repairs
One Corps Serving the Armed Forces and the Nation UT Inspection of Diagonal Gusset
One Corps Serving the Armed Forces and the Nation UT Inspection of Diagonal Gusset
One Corps Serving the Armed Forces and the Nation Welding Strut Arm at Service Base
One Corps Serving the Armed Forces and the Nation MT Inspection of Strut Arm at Shop
One Corps Serving the Armed Forces and the Nation UT Inspection of Strut Arms
One Corps Serving the Armed Forces and the Nation UT Inspection of Strut Arms
One Corps Serving the Armed Forces and the Nation UT Testing Of Repaired Cracks
One Corps Serving the Armed Forces and the Nation Diagonal Modification
One Corps Serving the Armed Forces and the Nation Lower Diagonal Gusset
One Corps Serving the Armed Forces and the Nation Stress Relieving Diagonal Gusset
One Corps Serving the Armed Forces and the Nation Top End of Diagonal
One Corps Serving the Armed Forces and the Nation Bottom End of Diagonal
One Corps Serving the Armed Forces and the Nation Bottom End of Diagonal Undercut
One Corps Serving the Armed Forces and the Nation Gudgeon Hood Casting
One Corps Serving the Armed Forces and the Nation Casting Weld Repair Defect
One Corps Serving the Armed Forces and the Nation Stay Tuned……………. Mel Price Lock and Dam Miter Gate Inspections
One Corps Serving the Armed Forces and the Nation Inspections - Other Projects
One Corps Serving the Armed Forces and the Nation Locks 27 - Miter Gate Inspections and Instrumentation
One Corps Serving the Armed Forces and the Nation Locks 27 – Auxiliary Lock Miter Gate
One Corps Serving the Armed Forces and the Nation Cracks in Girder Flanges
One Corps Serving the Armed Forces and the Nation Sill Vertical Diaphragms Bottom Girder Designed as horizontally framed
One Corps Serving the Armed Forces and the Nation Instrumentation of Typical Connection
One Corps Serving the Armed Forces and the Nation Diaphragm Flange Girder Flange Strain Transducer
One Corps Serving the Armed Forces and the Nation Instrumentation Results Stresses Higher in Diaphragm
One Corps Serving the Armed Forces and the Nation Lock 27 Miter Gate Instrumentation Results Diaphragm Flange 8 ksi T Web 4 ksi T Girder Flange 7 ksi T Web 3 ksi C
One Corps Serving the Armed Forces and the Nation Locks 27 - Main Lock – Jan 2003
One Corps Serving the Armed Forces and the Nation Locks 27 - Main Lock – Jan 2003 Failed Diagonal Rods
One Corps Serving the Armed Forces and the Nation Why are rods failing? 1) Cyclic loading (beach marks = fatigue) 2) Bending (Unidirectional - beach marks on one side)
One Corps Serving the Armed Forces and the Nation Instrumentation of Diagonals
One Corps Serving the Armed Forces and the Nation Instrumentation on Diagonals
One Corps Serving the Armed Forces and the Nation Instrumentation Results One Lockage = Many Cycles
One Corps Serving the Armed Forces and the Nation Rope Access Inspections Tainter gates at flood control projects Tainter gates at navigation project Dam bulkheads Miter gates
One Corps Serving the Armed Forces and the Nation Clarence Cannon Dam Spillway and Tainter Gates
One Corps Serving the Armed Forces and the Nation Locks 27 Miter Gate
One Corps Serving the Armed Forces and the Nation Kaskaskia L&D Tainter Gate
One Corps Serving the Armed Forces and the Nation Carlyle Dam Tainter Gate
One Corps Serving the Armed Forces and the Nation Questions?