NLCTA Safety Audit Radiation Safety Review W. R. Nelson 9 November 2001.

Slides:



Advertisements
Similar presentations
Radiation Safety Training Lab Survey Program Washington State University Radiation Safety Office.
Advertisements

Industrial Radiography
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
Radiation at accelerator laboratories Prompt radiation from the particle beam Beam induced radiation –Neutrons –Gammas –Synchrotron radiation Radiation.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
E163: Laser Acceleration at the NLCTA Eric Colby, ARDB For the E163 collaboration Safety Overview Committee Meeting Sept. 19, 2002.
August 4, 2009Radiation Safety Committee Operational Radiation Safety Program for the NEH A.A. Prinz, J.C. Liu and J. Vollaire.
Safety Oversight for SLAC Accelerator Department Operations
C. Theis, D. Forkel-Wirth, S. Roesler, H. Vincke.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
X-ray Capability for Energy Response. Ludlum already has many capabilities in-house:  PMT’s and plastic scintillators  Circuit boards (4-layer SMT)
Radiation Safety Rules of Thumb. TR-2 Alpha Particle An alpha energy of at least 7.5 MeV is required to penetrate the protective layer of the skin (0.07mm).
1 BROOKHAVEN SCIENCE ASSOCIATES Review of May 29 Excursion Bob Casey.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
PPS and BCS Requirements for LCLS-II (Baseline) Stan Mao 06/10/2015.
Posting of Accelerator Enclosures Vashek Vylet and Keith Welch DOE Accelerator Workshop SLAC, August 17 – 19,
ALPHA Project Safety Assessment Document Vladimir Anferov.
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
March 17, Radiation Shielding Update and Guidance Don Parry, MHP, CHP Region I Physicist Michigan Department of Community Health Radiation Safety.
RADIATION PROTECTION IN DIAGNOSTIC AND INTERVENTIONAL RADIOLOGY
ANALYTICAL X-RAY SAFETY User Training Centre for Environmental Health, Safety and Security Management.
The days before Treatment
Authorization and Inspection of Cyclotron Facilities Inspections.
Health & Safety Site Verification Audit Procedural Training F b RevNo: 0 / Omni Facility Services Health & Safety Site Verification Audit.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
FNAL, May 10, Introduction for Beam Diagnostics Laboratory Main Mission: R&D on charged particle beam diagnostics for e + /e - linear colliders.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
After last meeting Matt, Riad and I discussed January energy choice…  Focus on Physics paper measurements  Focus on 5 MeV systematics  Pick “final”
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Summary of radiation shielding studies for MTA Muon production at the MiniBooNE target Igor Rakhno August 24, 2006.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Development of Cryogenic Moderators Using a Small Proton Accelerator Yoshiaki Kiyanagi*, Fujio Hiraga, Takashi Kamiyama, Akira Homma, Fumiyuki Fujita and.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Radiological Safety for Experiment T-489 Irradiation Experiment in Endstation A Spring 2007 ITEMS: Experimental Setup Long-Term Radiation inside ESA Short-Term.
Radiation Protection Standards for Prompt Radiation Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Dark Current and Radiation Shielding Studies for the ILC Main Linac
WANG chuanzhen PENG wei XIAO min LI Chunsong (SQHL)
Comparisons of neutron production by muons in GEANT4 and toy model
Shielding Design for LCLS Injector Operation – Phase one
Industrial Radiography
IAEA E-learning Program
Desirable BCM Performance
Radiation protection of Linac4 M. Silari Radiation Protection Group
C100 Activation Status and Projections JLab Ops Staytreat 2016
Vashek Vylet RadCon Manager UITF Internal Safety Review May 10, 2016
Andreas Jansson, Lali Tchelidze
Update on Dark current generation in ILC Main Linac
J. Seeman Assistant Director for PPA/LCLS
Operations Section Leader
Maximum Credible Beam Event Paul Emma et al
LCLS Personnel Protection System and Beam Containment System
T-489: Induced Activity and Residual Dose Rates
E. Michael Saleski PPS and BCS Systems Manager
UITF Conduct of Operations Review
Vashek Vylet, RadCon UITF Conduct of Operations Review April 24, 2019
In-situ determination
Presentation transcript:

NLCTA Safety Audit Radiation Safety Review W. R. Nelson 9 November 2001

Outline of talk Quick look at the facility – Shielding (acts as a PPS enclosure) – Roof (designated a Radiation Area) Beam Authorization Sheet (BAS) Radiation surveys – With beam – X-rays from RF structures (on the roof) Area Monitoring (OHP) Unattended operation (RF test only)

The NLCTA Shielding (PPS) Enclosure

The NLCTA Roof (Radiation Area)

Beam Authorization Sheet (BAS)

Beam Authorization Sheet (cont.)

Additional Documentation NLCTA website – project.slac.stanford.edu/lc/local/Projects/NLCTA/ project.slac.stanford.edu/lc/local/Projects/NLCTA/ – See nlcta.htm for various checklists (weekly, daily, etc.) – See Supporting-documentation for memos (e.g., radiation surveys, modifications to requirements for unattended operation, etc.)

Additional Documentation (cont). ESD/Controls Group (on NT) For example, RF Pre-running Condition 6, the procedure for the NLCTA Radiation Certification [ ] can be found at: W:/PPS Procedures/Certification Procedures/PPS PROCEDURES Latest /PPS Procedures 39- NLCTA/NLCTA RAD3.doc

Radiation Surveys OHP surveys: klystrons, RF structures – Done on routine basis, results given to operations Surveys by Radiation Physics with beam – Performed several times as the energy increased – Highest energy was 270 MeV – Special survey done at 65 MeV with penetrations unshielded

Radiation Surveys (cont.) X-ray surveys were also carefully surveyed on the roof near RF structures with help from OHP

Radiation survey at 270 MeV Performed on August 17, 1999 (270 MeV, 90 mA, 120ns, 10 Hz = 29 Watts) (see memo Rad-survey 270 MeV.pdf on NLCTA web site) Both neutron (Rem counter) and gamma (ion chamber) data collected – Normal beam operation – Mis-steered beam (two scenarios) Protection Ion Chamber (PIC) readings recorded

Normal beam operation results Levels found to be less than 0.2 mrem/h (gamma) and zero neutron Both around the sides and on the roof One exception: – Small corner location (F34U) near East PPS Entry – Shield thickness is 4-ft instead of the normal 6-ft – 0.9 mrem/h (gamma) – No neutron radiation

Mis-steered beam results Highest level found on roof above the source – 1.7 mrem/h (gamma) – 0.3 mrem/h (neutron) Whereas SHIELD11 code predicted – 3.5 mrem/h (gamma) – 1.3 mrem/h (neutron) Source most likely not a “standard target” (i.e., 4-inch diameter, 12-inch long Fe cylinder) Levels around sides still less than 0.2 mrem/h

Protection Ion Chambers (PICs) Again, PIC levels simultaneously recorded during entire survey (for calibration purposes) Also, studied PIC history buffers for last 3-4 years (to see if and when they tripped) Setting trip levels at 50nA would guarantee for worst- case steering – less than 0.6 mrem/h on sides – less than 6 mrem/h on roof Currently set at 10 nA (NLCTA: Daily BCS Cklist.pdf)

Special survey of roof penetrations Purpose: determine if local shielding (gravel) is really necessary (at least at this point in time) – The original penetration calculations are “subject to a large uncertainty” (SAD p.7-21) Survey performed on September 22, 2000 (65 MeV, 10 9 e/p, 10 Hz = 0.1 Watts) Steered beam into quad located near penetration Documented by memo – see NLCTA web site – Rad-survey penetrations 65 MeV.pdf

Penetration study (cont.) (0.1 W mis-steering loss ) ConditionLocation Neutron (  rem/h) Gamma (  rem/h) Total (  rem/h) Normal lossAbove hole78087 Mis-steeringAbove hole Mis-steering3-ft Off hole SHIELD11 calculation Same11314

Protection Ion Chambers (PICs) again PIC levels simultaneously recorded during entire survey Largest value was found to be 4.8 nA at PIC (closest one downbeam of penetration) With a trip level of 10 nA, this corresponds to (10/4.8)x103  rem/h = 0.2 mrem/h above the penetration, and 5 times smaller away from it

Protection Ion Chambers (cont.) Based on these numbers, we have removed the penetration shielding restriction from the BAS. At 200 MeV we will measure again (see Initial Checkout item #2 on BAS).

X-rays from the RF structures (roof) Somewhere towards the 4 th quarter of 1999 it became clear that there was an X-ray source around Station 1 on the roof that needed to be shielded. We saw this because of – Occasional BSOIC trips (very sporadic) – OHP Event Monitoring (TLDs)

X-rays from RF structures (cont.) As expected, the so-called “flower-petal” mode converter turned out to be the problem, so we decided to make additional measurements With support from OHP, we placed a matrix of TLDs about a foot away from the coupler We also placed TLDs inside a stack of Pb foils so we could better understand the spectrum

X-rays from RF structures (cont.) The Pb-tranmission curve initially resembled a 150-keV spectrum, consistent with that seen earlier by Vlieks et al. (SLAC-PUB-7938 (1998)). But at larger Pb thicknesses it data flattened out – The spectrum “hardened” (150  250 keV) – 1/8-inch Pb gave a total transmission factor of 0.03 Although sporadically produced, the integrated dose rate 1-ft from the source turned out to be about 10 mrem/h * * Note: the roof is designated as a Radiation Area

X-rays from RF structures (cont.) Decided to shield all of such RF structures with boxes made of wood sandwiched around 1/8 th inches of Pb Integrated dose projection (2000 h/y): – 20 rem (unshielded) – 600 mrem (shielded)

X-rays from RF structures (cont.) Measured (shielded) dose: mrem/h, or 124 mrem in a 2000 hour working year (to be compared with the 600 mrem calculation) Reported to Radiation Safety Committee (see NLCTA web site: roof-dosimetry 9 oct01.pdf)

Unattended operation (RF tests only) During Jan-Feb 2000 the NLCTA staff requested permission to operate klystrons and modulators at the NLCTA in order to process accelerator structures With the X-ray problem understood, the Radiation Safety Committee agreed to this request, provided that…

Unattended operation (cont.) …special requirements – the gun was locked off (with some hardware modifications made to the PPS panel) – a designated EOIC would be responsible even with the absence of an operator in the control room – together with some other details (check lists, etc.) (see NLCTA web site: rsc pdf)

NLCTA Area Monitoring Spring01 & Summer01 (6 months) LocationDose (mrem) S side, outside wall by Faraday cup, on floor4 Operator's Office0 BLDG 237, on deck0 Roof, above beam dump2 Roof, above Farady cup, on BSOIC (near Station 1)4 Maze entrance, beam dump end0 Inside ESB, east of klystrons, on S wall of NLCTA1 West End PPS0 Outside wall, S of beam dump1 N side, outside wall by Faraday cup, on BSOIC2 Bldg 225, Inside on wall0 Bldg 104C, Next to Door, on wall2

Extending unattended operation to include weekend running Request was made on September 20, 2001 to extend the unattended mode of operation to include weekends This was approved by the Radiation Safety Officer on October 17, 2001 (see NLCTA web site: unattended-mods.pdf) Good shielding, dosimetry and configuration control was essential to getting this approval

Additional Event Monitoring The NLCTA physicists believe that they have now significantly reduced the X-ray source strength Accordingly, we are helping them prove this by installing Event Monitors on the inside and outside each of the wood-Pb boxes Furthermore, the number of these boxes has been increased from three to nine, as part of a proactive move to make sure that people are not exposed to possible new sources of X-rays