Laboratory Pilots/Deployment January 22, 2013 1. Agenda 1.eDos pilot status update 2.LRI pilots status update 3.LOI pilots status update 4.Riki questions.

Slides:



Advertisements
Similar presentations
EDOS Workgroup Update July 16, 2013 Laboratory Orders Interface Initiative.
Advertisements

EDOS Workgroup Update June 4, 2013 Laboratory Orders Interface Initiative.
EDOS Workgroup Update Laboratory Orders Interface Initiative.
EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012.
EDOS Workgroup Update Laboratory Orders Interface Initiative.
EDOS Workgroup Update HL7 Orders & Observation WG May 7, 2013 Laboratory Orders Interface Initiative.
EDOS Workgroup Update June 18, 2013 Laboratory Orders Interface Initiative.
LRI Validation Suite Meeting August 16, Agenda Review of LRI Validation Suite Charter/Overview Acquiring test data update Review of proposed test.
LRI/LOI Pilots May 1, Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support Team Others.
S&I Framework Testing HL7 V2 Lab Results Interface and RI Pilot Robert Snelick National Institute of Standards and Technology June 23 rd, 2011 Contact:
5/10/2015DRAFT1 Public Health & Clinical LOINC - Feb 17 th 2012 CDC Vocabulary Team Office of Surveillance, Epidemiology and Laboratory Services (OSELS)
VSAC Users’ Forum Thursday, January 15 2:00 – 3:00 PM, EST.
S&I Framework Laboratory Initiatives Update June 6, 2013.
Update on Vocabularies and Value Sets for Meaningful Use Betsy Humphreys, MLS, FACMI Deputy Director National Library of Medicine National Institutes of.
Laboratory Pilots/Deployment June 12, Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support.
1 Work Plan for Testing the LIS and EHR Systems Define Test Flow based from Work Flow Define a testing methodology Develop high-level requirements for.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting January 23, 2012.
LRI Validation Suite Meeting November 1st, Agenda Review of LIS Test Plan Template CLIA Testing EHR testing (Juror Document)—Inspection Testing.
LRI Validation Suite LRI Validation Suite Meeting Rob Snelick—NIST April 24th, 2012.
S&I Framework Operating Metrics Timing Outputs Participation & Process Framework Launch DateJan 7, 2011 First Initiative Launch DateJan 31, 2011 Elapsed.
LRI Validation Suite LRI Validation Suite Meeting Rob Snelick—NIST March 27th, 2012.
Clinical Oncology Patient Transfer Summary Ballot Development Spring Ballot Clinical Oncology Treatment Plan and Summary, Release 1 Ballot for May 2013.
Automate Blue Button Initiative Push Workgroup Meeting January 7, 2013.
LRI Validation Suite LRI Prototype Tool Demonstration Rob Snelick—NIST January 31st, 2011.
July 20, 2007 Healthcare Information Technology Standards Panel Principles for Proper Use of HITSP Interoperability Specifications And Proposal for Proper.
Laboratory Pilots/Deployment May 15, Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support.
PHDSC session Readiness of public health information systems to support Meaningful Use of EHRs through health information exchanges.
S&I Public Health * We will start the meeting 3 min after the hour September
EHR-S Functional Requirements IG: Lab Results Interface Laboratory Initiative.
Laboratory Orders Interface (LOI) Weekly WG Meeting 5/10/2012.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting March 12, 2012.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting August 15, 2011.
1 Agenda  For PSS preparation discuss naming of the final deliverables: – 3 Documents from OO  EHR Functional Profile for Lab  EHR Functional Requirements.
SAIF Effects on Interoperability Reviews WG Baris E. Suzek May, 11, 2010.
EHR-S Functional Requirements IG: Lab Results Interface 10/17/2014.
Laboratory Orders Interface (LOI) Initiative Kickoff 3/30/2012.
EDOS Workgroup Update May 21, 2013 Laboratory Orders Interface Initiative.
MATT REID JULY 28, 2014 CCDA Usability and Interoperability.
S&I PUBLIC HEALTH REPORTING INITIATIVE: DEVELOPING OF A TEAMING APPROACH S&I Public Health Reporting Initiative Nikolay Lipskiy, MD, DrPH, Co-Lead September,
Electronic Submission of Medical Documentation (esMD) AoR L2 Harmonization July 3, 2013.
© 2012 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
Data Access Framework All Hands Community Meeting November 5 th, 2014.
Lab Results Interface Validation Suite WG July 28, 2011.
Pediatric Data Standards SIG Meeting San Diego, CA January 8-9, 2007.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting May 9, 2011.
OST Update Health IT Policy Committee March 14, 2013 Doug Fridsma, MD, PhD, FACP, FACMI Chief Science Officer & Director, Office of Science & Technology.
LRI Validation Suite Meeting Prototype Tool Demonstration December 20th, 2011.
Laboratory Pilots/Deployment June 26, Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis LRI/LOI/eDOS.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting August 29, 2011.
SAIF Effects on Interoperability Reviews WG Baris E. Suzek May, 25, 2010.
EDOS Workgroup Update Laboratory Orders Interface Initiative.
Electronic Submission of Medical Documentation (esMD) Electronic Determination of Coverage (eDoC) Workgroup & SD SWG October 9, 2013.
Lab Results Interface Validation Suite Workgroup and Pilots Workgroup Vision, Charter, NIST Collaboration, July 8,
Public Health Reporting Initiative July 25, 2012.
Lab Results Interface Pilots WG Kick-Off August 1, 2011.
LRI/LOI Pilots April 17, Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support Team Others.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting November 21, 2011.
Lab US Realm Pilot Project LOINC Committee Meeting Carolyn A. Knapik, BS, MT(ASCP) June 9, 2016.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting September 12, 2011.
Labs Early Adoption Program Template Insert the Name of Your Implementation / Organization Here MM/DD/YYYY.
EDOS Workgroup Pilots – Engagement Plans. Meeting Etiquette Remember: If you are not speaking keep your phone on mute Do not put your phone on hold –
Longitudinal Coordination of Care LCP SWG Thursday, April 25, 2013.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting July 18, 2011.
Labs Early Adoption Program Template Insert the Name of Your Implementation / Organization Here MM/DD/YYYY.
Laboratory Orders Interface Initiative
Healthcare Information Technology Standards Panel
Patient Care Workgroup Care Plan Topic
Patient Care WG Allergy and Intolerances Project
US Core Data for Interoperability (USCDI): Data Provenance IG
Presentation transcript:

Laboratory Pilots/Deployment January 22,

Agenda 1.eDos pilot status update 2.LRI pilots status update 3.LOI pilots status update 4.Riki questions re LOI 5.Next Steps 2

eDOS Pilot Update – Patrick Lloyd 1.Status of Pilots selection – running behind 2.Plan to submit eDOS DSTU for May 2013 a)Preliminary content due 2/24 b)Final content due 3/17 3.Lab-Lab Pilots 4.Implications of LOINC orders effort 5.NIST support for eDOS Q2/Q for start (done by Sept 2013) 6.Expansion of eDOS IG a)Ask at order (standardized questions) (eDOS or LOI?) i.Need more work from vocabulary group ii.Common data elements (LOINC codes) suggested code sets b)define segment / element location for AOE result (appears HL7 will not approve) [segment for AOE?] 3

LRI Pilot Update 1.LRI pilots – completed 2.LRI implementation by EHR vendors in process 3.NIST test tool released for EHR Certification

LOI Pilot Update 1.Status of Pilots selection 2.Scope of Pilots a.Within single vendor (e.g. LIS / EHR from same vendor) b.Between vendors (e.g. LIS / EHR from different vendors) 3.NIST effort with respect to LOI a)Start in Feb b)Prototype in May LOINC orders effort 5

Questions for Pilots Group 1.List of some of the most common orders in the ambulatory setting to use in the LOI guide (see LOINC) a)Will match the existing LRI cases, but additional cases will help. b)Need common orders that include Ask at Order Entry questions – these will be build in respective eDOS test scenarios 2.Add-On orders - would those ever be based on the result of a previous test? a)For example the doc gets the first results back on a blood sample and then realizes he would like to add another test, because one of the screening tests was positive? Liver profile in asymptomatic patient – may want to order hepatitis screen b)We are asking, because that would require to test support for parent-child linking in at least one of the scenarios. 6

Questions for Pilots Group 3.Since LOI includes billing/insurance information - could anyone share sample data or IN1 and GT1 segments with "real" data - especially to see how the insurance information looks. – ask financial management workgroup at HL7 4.Does anyone have sample messages compliant with the eDOS IG? 5.Should testing include scenarios for new catalog and update to existing catalog? 7

Next Steps / Questions Next Steps Continue effort to recruit eDOS and LOI pilots Schedule Calls for coordination every other week at same time next call 1/22 at 2pm Eastern For questions, please feel free to contact Bob Dieterle: Patrick Loyd: 8