Ideas for e+ source and e+ polarization 29-May-2013 ECFA LC Workshop at DESY T. Omori.

Slides:



Advertisements
Similar presentations
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Advertisements

Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
~1m undulator IP Pol. e + source based on Compton scattering with FEL & 4 mirror cavity Low energy electron beam Gamma-ray FEL photon beam LCWS2014 in.
A_RD_01 Applications of a high finesse Fabry Perot Cavity for the ILC ► Introduction ► Status of the cavity R&D – at ATF – at LAL/Orsay French Labs. :
Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators.
Compton based Polarized Positrons Source for ILC V. Yakimenko, I. Pogorelsky BNL Collaboration meeting, Beijing, January 29-February1, 2006.
Status of g ray generation at KEK-ATF ► Introduction ► Status of the cavity R&D ► Out Look French Labs. : LAL (Orsay) in Collaboration with CELIA (Laser.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Compton Linac for Polarized Positrons V. Yakimenko, I. Pogorelsky, M. Polyanskiy, M. Fedurin BNL CERN, October 15, 2009.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Status of g ray generation at KEK-ATF ► Introduction ► Status of the cavity R&D ► Out Look French Labs. : LAL (Orsay) in Collaboration with CELIA (Laser.
SAPPHiRE workshop, CERN 19 th Feb 2013 A SAPPHiRE Laser? Laura Corner Lasers for Accelerators group (L4A) John Adams Institute for Accelerator Science,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Status of R&D of Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Out Look KEK, Hiroshima University LAL (Orsay) in Collaboration withCELIA.
Update of R&D Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Recent activities ►Out Look KEK, Hiroshima University LAL (Orsay) in.
Status of R&D of Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Out Look KEK, Hiroshima University LAL (Orsay) in Collaboration withCELIA.
300 Hz e + Generation for ILC MM with advanced conventional e + sources T. Omori (KEK) 17-Nov-2008, GDE meeting, Chicago Many thanks to Chehab-san, Logachev-san,Urakawa-san,
ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Feedback R&D for Optical Cavity Ryuta TANAKA (Hiroshima univ.) 19 th Feb 2013 SAPPHiRE DAY.
T.Takahashi Hiroshima γγ state of the art and research plan, what system tests can be done at ATF2, ESA T.Takahashi Hiroshima Univ. March GDE BDS/ACFA.
Status of the optical cavity R&D at ATF IWLC2010 Geneva 20-October-2010 T.Takahashi Hiroshima University for collaborators.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
Status and Plan of Compton  -ray Generation at KEK-ATF Japanese Labs. : KEK, ATF group, Hiroshima University Tsunehiko OMORI (KEK) for 13 February 2014.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Compton Experiment at ATF LCWS10 28-March-2010 T. Takahashi (Hiroshima) / T. Omori (KEK) for collaborators.
Study of High Intensity Multi-Bunch  -ray Generation by Compton Scattering ATF TB 28/May/2006 presented by Tsunehiko OMORI (KEK) on behalf.
After Posipol In my opinion we are still too much dispersed. We have to re compact our community if we want to succeed in presenting a Compton version.
E + ソースの現状 大森 GDE 活動報告会 2008 年 6 月 23 日 シカゴ GDE meeting に向けて 大森 GDE 活動報告会 2008 年 10 月 6 日 かなりの数のスライドが、栗木さんが先ごろ大邱 "2nd Asia ILC R&D Seminar, Sep 29-30,
A.Variola Motivations…from D.Hitlin Talk The polarized positron source.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Laser Based Polarized e + e + Source for ILC 8th ACFA Daegu 11-14/Jul/2005 Tsunehiko OMORI (KEK)
T.Takahashi Hiroshima Optical Cavity R&D for Photon Colliders T.Takahashi Hiroshima Univ. 26 May 2008 NanoBeam 2008.
T.Takahashi Hiroshima Optical Cavity R&D around KEK-ATF T.Takahashi Hiroshima Univ. Nov LCWS08 at Chicago.
Progress at BNL Vitaly Yakimenko. Polarized Positrons Source (PPS for ILC) Conventional Non- Polarized Positrons: In our proposal polarized  -ray beam.
A.Variola LCWS Bejing ERL Compton Scheme Status of the Orsay activity.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Overview of 300 Hz Conventional e + Source for ILC T. Omori (KEK) 29-May-2013 ECFA LC Workshop at DESY Truly Conventional Collaboration ANL, IHEP, Hiroshima.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
T.Takahashi Hiroshima Photon Collider testbed at ATF2 ~a possible plan~ T.Takahashi Hiroshima Univ. May ATF2 meeting.
Ring / ERL Compton e + Source for ILC PosiPol 2008 International Conference Center Hiroshima 16-June-2008 Tsunehiko OMORI (KEK)
Status of the Compton Experiment at the ATF TILC09 18-April-2009 T.Takahashi Hiroshima University for collaborators.
Compton Experiment at ATF DR 2009 Summary and Plan ATF2 Project Meeting 15-Dec-2009 T. Omori (KEK) for collaborators.
T.Takahashi Hiroshima /11/5 Tohru Takahashi Hiroshima University 高橋 徹 広島大学.
Target studies for the ILC 300 Hz conventional e + source 29-May-2013 ECFA LC Workshop at DESY T. Omori Target study team: K. Yokoya (KEK), J. Urakawa.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Compton for ILC LCWS2012, UT at Arlington, USA T. Omori (KEK)
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
Truly Conventional e + Source for ILC Special Thanks to Takahashi-san: About half of the slides are taken from Takahash-san's talk at ALCPG11 T. Omori.
Laser electron beam x 30 Multi-Compton chamber system γ-ray cm Conceptual design in 2005 Snowmass X 5 at present Big progress During R&D.
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
Update of R&D Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Recent activities ►Out Look KEK, Hiroshima University LAL (Orsay) in.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Status of Hiroshima-KEK Compton Experiment at ATF ► Introduction ► Status of the cavity R&D – for Two mirror cavity – for four mirror cavity KEK – Hiroshima.
Laser electron beam x 30 Multi-Compton chamber system γ-ray cm Conceptual design in 2005 Snowmass X 5 at present Good progress During R&D From Conventional.
Compton based Polarized Positrons Source for ILC V. Yakimenko 1, D. Cline 2, Ya. Fukui 2, V. Litvinenko 1, I. Pogorelsky 1, S. Roychowdhury 3 1 BNL, 2.
Some Aspects on Compton Scheme Positron Source Study Wanming Liu ANL Tsunehiko OMORI KEK.
Truly Conventional e+ Source for ILC
Pol. positron generation scheme for ILC
Compton effect and ThomX What possible future?
Summary for the Sources working group
ERL accelerator review. Parameters for a Compton source
Jim Clarke ASTeC Daresbury Laboratory March 2006
ATF project meeting, Feb KEK, Junji Urakawa Contents :
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Presentation transcript:

Ideas for e+ source and e+ polarization 29-May-2013 ECFA LC Workshop at DESY T. Omori

Assumption

If Undulator source is OK, we need no discussions. Assumption We are worried about the status of the target R/D for undulator. It is challenging target: create 2600 bunches in 1 m sec. Tangential speed of 100 m/s required. Backup plan: 300 Hz conventional scheme. No polarization.

300 Hz scheme e+ generation in 63 m sec (cf. undulator : in 1 m sec) conventional & NOT polarized.

Total Number of bunches: 2640 How? Divide into 20 triplets (1 Triplet = 3 Mini-Trains) 300 Hz creation of triplets triplet to triplet time space = 3.3 m sec Each triplet contains 132 bunches 2640 = 20 x 132 Create 20 triplets : 63 m sec Stretching in time

20 triplets, rep. = 300 Hz triplet = 3 mini-trains with gaps 44 bunches/mini-train, T b_to_b = 6.15 n sec DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec e+ creation go to main linac Time remaining for damping = 137 m sec We create 2640 bunches in 63 m sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Pendulum or Slow Rotation Conventional e+ Source for ILC Normal Conducting Drive and Booster Linacs in 300 Hz operation 2640 bunches 60 mini-trains

20 triplets, rep. = 300 Hz triplet = 3 mini-trains with gaps 44 bunches/mini-train, T b_to_b = 6.15 n sec DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec e+ creation go to main linac Time remaining for damping = 137 m sec We create 2640 bunches in 63 m sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Pendulum or Slow Rotation Conventional e+ Source for ILC Normal Conducting Drive and Booster Linacs in 300 Hz operation 2640 bunches 60 mini-trains Stretching

Compton Pol. e+ Source Upgrade from 300 Hz Conventional e+ source to Compton pol. e+ source

Introduction Polarized e+ by laser Compton Scheme Ee~1GeV for 10MeV gammas easy to control polarization independent source Toward the positron sources (1) Design Study : upgrade from 300 Hz Conventional (2) R/D : Optical cavity at ATF

Introduction Polarized e+ by laser Compton Scheme Ee~1GeV for 10MeV gammas easy to control polarization independent source Toward the positron sources (1) Design Study : upgrade from 300 Hz Conventional (2) R/D : Optical cavity at ATF

Design Study Upgrade from 300 Hz Conventional e+ source to Compton pol e+ source.

Laser Compton e + Source for ILC 2. Ring Base Laser Compton 3. ERL Base Laser Compton 1. Linac Base Laser Compton Storage Ring + Laser Stacking Cavity ( =1  m), and e+ stacking in DR ERL + Laser Stacking Cavity ( =1  m), and e+ stacking in DR Linac + non-stacking Laser Cavity ( =10  m), and No stacking in DR Reminder: We have 3 schemes. T. Omori et al., Nucl. Instr. and Meth. in Phys. Res., A500 (2003) pp Proposal V. Yakimenko and I. Pogorersky S. Araki et al., physics/

Laser Compton e + Source for ILC 2. Ring Base Laser Compton 3. ERL Base Laser Compton 1. Linac Base Laser Compton Storage Ring + Laser Stacking Cavity ( =1  m), and e+ stacking in DR ERL + Laser Stacking Cavity ( =1  m), and e+ stacking in DR Linac + non-stacking Laser Cavity ( =10  m), and No stacking in DR T. Omori et al., Nucl. Instr. and Meth. in Phys. Res., A500 (2003) pp Proposal V. Yakimenko and I. Pogorersky S. Araki et al., physics/ Reminder: We have 3 schemes.

20 triplets, rep. = 300 Hz, pulse length ~ 1  s triplet = 3 mini-trains with gaps 44 bunches/mini-train, T b_to_b = 6.15 n sec DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec e+ creation go to main linac Time remaining for damping = 137 m sec We create 2640 bunches in 63 m sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Pendulum or Slow Rotation Conventional e+ Source for ILC Normal Conducting Drive and Booster Linacs in 300 Hz operation 2640 bunches 60 mini-trains

20 triplets, rep. = 300 Hz, pulse length ~ 1  s triplet = 3 mini-trains with gaps 44 bunches/mini-train, T b_to_b = 6.15 n sec DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec e+ creation go to main linac Time remaining for damping = 137 m sec We create 2640 bunches in 63 m sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Pendulum or Slow Rotation Conventional e+ Source for ILC Normal Conducting Drive and Booster Linacs in 300 Hz operation 2640 bunches 60 mini-trains

Linac Scheme‏ 4GeV 1A e - beam 30MeV  beam 15MeV e + beam  to e + conv. target ~2 m ► CO 2 laser beam and 4 GeV e-beam produced by linac. ▬ 4GeV 15nC e- beam with 12 ns spacing. ▬ 10 CPs, which stores 10 J CO 2 laser pulse repeated by 83 Mhz cycle. ► 5E+11 γ-ray -> 2E+10 e+ (2% conversion) ► 1.2μs pulse, which contains 100 bunches, are repeated by 150 Hz to generated 3000 bunches within 200ms. ▬ Laser system relies on the commercially available lasers but need R&D for high repetition operation. ▬ Ring cavity with laser amplifier realizes the C0 2 laser pulse train. V. Yakimenko and Igo Pogorelsky

20 triplets, rep. = 300 Hz, pulse length ~ 1  s triplet = 3 mini-trains with gaps 44 bunches/mini-train, T b_to_b = 6.15 n sec DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec e+ creation go to main linac Time remaining for damping = 137 m sec We create 2640 bunches in 63 m sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Pendulum or Slow Rotation Conventional e+ Source for ILC Normal Conducting Drive and Booster Linacs in 300 Hz operation 2640 bunches 60 mini-trains

20 triplets, rep. = 300 Hz triplet = 3 mini-trains with gaps 44 bunches/mini-train, T b_to_b = 6.15 n sec DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec e+ creation go to main linac Time remaining for damping = 137 m sec We create 2640 bunches in 63 m sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target CO2 Laser Cavities Linac Compton (NO big change) Normal Conducting Drive and Booster Linacs <-- Reuse 2640 bunches 60 mini-trains Replace target Single Tungsten Target --> CO2 Laser Cavies NO stacking in DR

Compton Ring Electron driver:5.3nC, 6.2ns, 1ps, 1.8GeV Laser : 0.6Jx5 CP (optical cavities). By one collision, positron bunch with Ne+:2.0E+8 is generated. 10 bunches are stacked on a same bucket in DR. This process is repeated 10 times with 10ms interval. Finally, Ne+:2E+10 is obtained. 1.8GeV 90 ms (10 ms x 9)

ERL scheme Electron is provided by ERL (Energy Recovery Linac). Both advantages (high yield at Linac and high repetition at CR) are compatible in the ERL solution. Continuous stacking the e+ bunches on a same bucket in DR during 100ms, the final intensity is 2E+10 e +. Another 100ms is used for damping. 100 ms

20 triplets, rep. = 300 Hz triplet = 3 mini-trains with gaps 44 bunches/mini-train, T b_to_b = 6.15 n sec DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec e+ creation go to main linac Time remaining for damping = 137 m sec We create 2640 bunches in 63 m sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Pendulum or Slow Rotation 2640 bunches 60 mini-trains Ring/ERL Compton Normal Conducting Drive < -- Throw away, Booster Linac <-- Reuse 300 Hz Conventional

DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec go to main linac Time remaining for damping = 137 m sec We throw away this part. Booster Linac 5 GeV NC 300 Hz 2640 bunches 60 mini-trains Ring/ERL Compton Normal Conducting Drive < -- Throw away, Booster Linac <-- Reuse

DR T b_to_b = 6.15 n sec 2640 bunches/train, rep. = 5 Hz T b_to_b = 369 n sec go to main linac Time remaining for damping = 137 m sec We create 640 bunches in 63 m sec Booster Linac 5 GeV NC 300 Hz 2640 bunches 60 mini-trains Ring/ERL Compton Normal Conducting Drive < -- Throw away, Booster Linac <-- Reuse We put Compton

DR Booster Linac up to 5 GeV duration 1  sec 300 Hz SR 1 GeV Linac Superconducting duration 63 m sec 5 Hz Target Compton Ring or ERL 1.8 GeV T b-to-b = 6.15 ns Stacking Ring 1 GeV C = 260 m No stacking is required in DR 132 bunches are circulated 100 times of stacking for Ring T b-to-b = 6.15 ns Reuse of the linac of the conventional scheme bunches are circulated 1000 times of stacking for ERL Ring: T b-to-b = 6.15 ns ERL: T b-to-b = 18.5 ns  -rays e+se+s optical cavities Compton Ring/ERL Compton (Big Change) Normal Conducting Drive < -- Throw away, Booster Linac <-- Reuse

Ways from 300 Hz conventional e + source to Compton pol e + source are presented. (1) Linac Compton : Small modification. Just replace tungsten target by CO2 laser cavities. (2) Ring/ERL Compton : Large modification is required. We add a 1 GeV SC linac (63 ms pulse), a 1 GeV stacking ring, and a Ring/ERL as a driver. 300 Hz Conventional e+ Compton pol. e+ source

Undulator Upgrade from 300 Hz Conventional e+ source to Undulator pol. e+ source

e + lineace - lineac e + DR e - DR Undulator e+ source undulator

e + lineace - lineac e + DR e - DR 300 Hz Conventional e+ 300 Hz e + source

e + lineace - lineac e + DR e - DR 300 Hz Conventional e+ Undulator pol. e+ source 300 Hz e + source

e + lineace - lineac e + DR e - DR 300 Hz Conventional e+ Undulator pol. e+ source 300 Hz e + source remove a part of lineac ~ 5 GeV

e + lineace - lineac e + DR e - DR 300 Hz Conventional e+ Undulator pol. e+ source 300 Hz e + source put undulator, drift, target,,,, undulator

e + lineace - lineac e + DR e - DR 300 Hz Conventional e+ Undulator pol. e+ source 300 Hz e + source put undulator, drift, target,,,, undulator this part?

DR T b_to_b = 6.15 n sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Slow Rotation or Pendulum 2640 bunches 60 mini-trains 300 Hz Conventional e+ Undulator pol. e+ source This part will be used as a single-bunch full-charge Keep Alive Source

DR T b_to_b = 6.15 n sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Slow Rotation or Pendulum 2640 bunches 60 mini-trains 300 Hz Conventional e+ Undulator pol. e+ source This part will be used as a single-bunch full-charge Keep Alive Source We need the booster linac which has 1 ms pulse length. We need a SC booster linac.

DR T b_to_b = 6.15 n sec Booster Linac 5 GeV NC 300 Hz Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Slow Rotation or Pendulum 2640 bunches 60 mini-trains 300 Hz Conventional e+ Undulator pol. e+ source This part will will be used as a single-bunch full-charge Keep Alive Source throw away

DR T b_to_b = 6.15 n sec Drive Linac Several GeV NC 300 Hz Target Amorphous Tungsten Slow Rotation or Pendulum 2640 bunches 60 mini-trains 300 Hz Conventional e+ Undulator pol. e+ source This part will will be used as a single-bunch full-charge Keep Alive Source

e + lineace - lineac e + DR e - DR 300 Hz Conventional e+ Undulator pol. e+ source a part of lineac ~5 GeV becomes the booster

DR T b_to_b = 6.15 n sec Booster Linac 5 GeV SC 5 Hz Drive Linac Several GeV NC 300 Hz -- > operate 5 Hz Target Amorphous Tungsten Slow Rotation or Pendulum 2640 bunches 60 mini-trains 300 Hz Conventional e+ Undulator pol. e+ source This part will will be used as a single-bunch full-charge Keep Alive Source put a 5 GeV SC linac which comes from the end of the main linac

DR T b_to_b = 6.15 n sec Booster Linac 5 GeV SC 5 Hz Drive Linac Several GeV NC 300 Hz -- > operate 5 Hz Target 2640 bunches 60 mini-trains 300 Hz Conventional e+ Undulator pol. e+ source gamma-ray from undurator Target

DR T b_to_b = 6.15 n sec Booster Linac 5 GeV SC 300 Hz Drive Linac Several GeV NC 300 Hz -- > operate 5 Hz 2640 bunches 60 mini-trains 300 Hz Conventional e+ Undulator pol. e+ source Keep Alive Source gamma-ray e + lineace - lineacundulator

300 Hz Conventional e+ Undulator pol. e+ source Pros. No big additional investment. We can reuse removed e- linac for the e+ booster. Cons. Decrease E cm dE(e-) = - 5 GeV (remove e- linac) - 3 GeV (undulator) dE cm = - 16 GeV (We don't want asymmetric collision) Others. Path length adjustment (e- and e+ interconnection). We may need to move the turnaround.

Summary

Summary 1. Worry: We are worried about the status of the target R/D for undulator. Target tangential speed 100 m/s. 2. Backup: 300 Hz conventional scheme. Time stretch. Target tangential speed 1 m/s. No polarization. 3. Ways to polarization: Ways from 300 Hz conventional e + source to Compton pol e + source and to undulator pol e + sourceare discussed.

Backup Slides

Jeff Gronberg, Oct 22, LCWS 2012

DR Booster Linac up to 5 GeV duration 1  sec 300 Hz SR 1 GeV Linac Superconducting duration 63 m sec 5 Hz Target Compton Ring or ERL 1.8 GeV T b-to-b = 6.15 ns Stacking Ring 1 GeV C = 260 m No stacking is required in DR 132 bunches are circulated 100 times of stacking for Ring T b-to-b = 6.15 ns Reuse of the linac of the conventional scheme bunches are circulated 1000 times of stacking for ERL Ring: T b-to-b = 6.15 ns ERL: T b-to-b = 18.5 ns  -rays e+se+s optical cavities Ring/ERL Compton Normal Conducting Drive < -- Throw away, Booster Linac <-- Reuse We create 2640 bunches in 63 m sec. We make stacking in the SR. NO stacking in DR. Long pulse (63 ms). Need SC linac.

Positrons produced by the polarized gamma-rays are accelerated upto 1 GeV by the superconducting linac then injected into the 1 GeV stacking ring. The linac operates at 5 Hz and has a long duration of 63 m sec. Then the 1 GeV stacking ring with about 260m circumference is employed. In the stacking ring, 132 bunchs are stored with 6.15 ns bunch spacing. The 132 bunches are sent to the booster linac at once by a kicker which pulse length is 1 micro seconds. The booster linac is normal conducting. It has heavy beam loading (3x10 10 positrons/bunch) and operated with about 1μsec pulse duration at 300 Hz. 20 times beam extraction from the stacking. We need 100 times positron bunch stacking in the same bunch in the staking ring. Since the bunch spacing in the Compton ring and in the staking ring is the same, 100 times of stacking need 100 turns in the sacking ring. It takes about 87  s, because the circumference of the ring is 260 m. We take cooling period of 3.2ms after stacking for stable operation of the Compton ring and the stacking ring. Total period of one cycle is 3.3 m sec (300 Hz). 20 times beam extraction takes 63ms. We need 1000 times of the stacking in the same bunch in the stacking ring. The bunch separation in ERL is 18.5 n sec. Therefore, the period of 1000 times positron bunch stacking is about 2.4ms. In a turn of the stacking ring, stacking is performed with three bunch intervals. In the next turn, stacking is not performed in the same bunch, but it is performed in the adjacent bunch which has 6.15-n-sec separation. This means stacking on the same bunch is performed with three turn intervals. The interval makes the stacking easier. Also through the process of the stacking, bunch spacing is changed from 18.5 ns to 6.15 ns. Since stacking takes long time, 2.4 m sec, cooling in the stacking ring is on going simultaneously. Remaining 0.9 m sec is used for additional cooling. Ring/ERL Compton Details (All parameters are tentative and still premature) Ring/ERL Common Details Ring-Compton Details ERL-Compton Details

Ring/ERL Compton Timing Chart (All parameters are tentative and still premature)

(For ERL, in each turn stacking are performed with three bunch intervals. This makes the stacking easier and changes bunch spacing from 18.5 ns to 6.15 ns.)

Laser Compton e + Source for ILC 1. Ring Base Laser Compton 2. ERL Base Laser Compton 3. Linac Base Laser Compton Storage Ring + Laser Stacking Cavity ( =1  m), and e+ stacking in DR ERL + Laser Stacking Cavity ( =1  m), and e+ stacking in DR Linac + non-stacking Laser Cavity ( =10  m), and No stacking in DR We have 3 schemes. T. Omori et al., Nucl. Instr. and Meth. in Phys. Res., A500 (2003) pp Proposal V. Yakimenko and I. Pogorersky S. Araki et al., physics/

SC Linac 1.8 GeV Laser Optical Cavities Photon Conversion Target Capture System To Positron Liniac RF Gun Dump Electron Storage Ring 1.8 GeV 1.8 GeV booster Ring scheme and ERL scheme are SIMILAR Ring Scheme ERL scheme

Compton Ring (1)‏ Inverse Compton scattering between electron stored in a ring (CR) and laser light stored in optical cavities. Energy spread of the electron beam is increased by the scattering. 10 ms interval for the beam cooling. 100 times stacking in a same bucket of DR makes the required bunch intensity.

We should go to 3D 4 mirror ring cavity to get small sport size 2 mirrors is not stable for small spot size α 2d 4M has astigmatism 3D (or twisted) 4M ring cavity

Brief History Mirror cavities installed –  kW  rays generate 2010 French 4 Mirror cavity installed –  rays confirmed 2011 earthquake – No major damage to our equipment. – beam back in June KEK-Hiroshima 4 mirror cavity installed –  rays confirmed Reported FJPPL2010 Annecy

Installation of KEK-Hiroshima 4M-cavity

3 Dimensional 4 Mirror Cavity Resonates only for circular polarization – geometric phase due to twisted pass – cavity only resonates with circular polarization – usable for pol. switching circumference of the cavity left handed right handed transmitted light

Configration of test bed

calculation of spot size w/ test bench geometry minor axis major axis spot size  (  m) spot size is not sufficiently small with test bench geometry L(mm) L

new geometry

expected spot size w/ new geometry spot size  (  m) L(mm) laser spot size of 15  m is expected with new geometry Before optimization After optimization

Cavity length feedback with 3D feature + = 3D4M cavity resonate only with circularly polarized lasers differential signal for feedback cavity length must be L = n  with very high precision (for enhancement of 1900 dL<< 87pm while L = 1.64m)

右円偏光 左円偏光 蓄積強度 Laser Power 2.6kW Time Jitter = 8.0ps 14 th Sep 2012 Stored Laser Power in the cavity

Right pol Left pol Sotred power Laser Power 2.6kW (1850 enhancement) Time Jitter = 8.0ps 14 th Sep 2012 Stored Laser Power in the cavity Stored Power [w] FWHM: 110pm 4pm