SAFETY AND ECONOMIC CONSIDERATIONS To ensure no overflow in treatment tank – Another pipe will be installed on the gutter To ensure continuous supply of water – Tap water piping is connected to reserve tank
NO.ITEMPRICE 1.WoodRM PlywoodRM Timber finishRM Aluminum sheetRM ValveRM Electronics partsRM TOTALRM Cost of Project Economically, this project is highly feasible - Low operational cost - High return over time
RECOMMENDATIONS Pneumatic valve to be used instead of manual valve Water pump to be installed at reserve tank Sprinkler to be installed on roof top for better surface coverage Metal mesh to be installed on gutter to prevent leaves and debris from entering gutter.