1 STAR TPC The STAR TPC Status and Issues A brief report to the STAR Council Jim Thomas.

Slides:



Advertisements
Similar presentations
“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”
Advertisements

1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
 These 100 seniors make up one possible sample. All seniors in Howard County make up the population.  The sample mean ( ) is and the sample standard.
1 Potential Hardware Improvements, Related R&D Wieman RNC LBNL TPC Review Friday 6 October 2006.
1 Jim Thomas - LBL A Quick Look at Some Systematic Errors in the TPC By Jim Thomas.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
HLT & Calibration.
SVT present and future resources Rene Bellwied Wayne State University SVT review, BNL, July 7 th /8 th, 2006.
Lukens - 1 TDC Review – 28 September 2004 TDC Production Review - Introduction Pat Lukens.
1 Data Storage MICE DAQ Workshop 10 th February 2006 Malcolm Ellis & Paul Kyberd.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
STAR Collaboration Meeting, Nantes, July2002 SVT Analysis/Status Update Jun Takahashi – University of Sao Paulo.
28 February, 2003 STAR Collaboration meeting Status of the dE/dx calibration Yuri Fisyak.
STAR Time-Projection Chamber Huan Zhong Huang Department of Engineering Physics Tsinghua University & Department of Physics and Astronomy University of.
1 TPC online  offline calibration November 2002.
C.Woody, PHENIX Upgrades, 11/10/00 A TPC for PHENIX ?? No, surely you must mean for STAR…. PHENIX, really …. ??? You must be NUTS !!! Well, wait a minute...
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
Gating grid concept for ALICE upgrade Howard Wieman 4/2/
JT: 1 The Berkeley Lab STAR TPC Distortions in the Transverse Plane: An Update Jim Thomas.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
 production in p+p and Au+Au collisions in STAR Debasish Das UC Davis (For the STAR Collaboration)‏
1 TPC Basics H. Wieman LBNL Oct. 18, Ann. Rev. Nucl. Part. Sci : 217.
PAD MONITOR The TPC pad monitor is used to check the performance of the TPC electronics. It can display the amplitude vs time bucket histogram for all.
MICE Target - Risk Lara Howlett University of Sheffield.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
JT: 1 The Berkeley Lab O STAR The STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory for the STAR collaboration The Vienna Conference.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
LASER CALIBRATION SYSTEM for STAR TPC Alexei Lebedev (BNL) for STAR collaboration  Design and description  Performance  Goals and results  Future developments.
STAR Operations Workshop 2007 H. Matis1 SSD Operations August 20, 2007 H. Matis for the SSD group.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
TPC ExB distortion at LHC-ALICE experiment Yasuto Hori for the ALICE-TPC collaboration Center for Nuclear Study, University of Tokyo 1.
HFT-prototype BUR considerations (Quantitative) What physics is possible in Run-13 assuming some (prototype) sectors are there? Relates to how long would.
Nov 2002T. Ljubicic DAQ100 Calibration Needs 10 to 8 bit (and back!) conversion table Gain correction per pad T0 correction per pad.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
STAR J/  Trigger in dA Manuel Calderon for the Heavy-Flavor Group Trigger Workshop at BNL October 21, 2002.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
HLT Kalman Filter Implementation of a Kalman Filter in the ALICE High Level Trigger. Thomas Vik, UiO.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
1 Jim Thomas - LBL Inner Sector Upgrade for the TPC Jim Thomas Lawrence Berkeley National Laboratory UCLA Upgrades Workshop December 14 rd, 2011.
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Study of Charged Hadrons in Au-Au Collisions at with the PHENIX Time Expansion Chamber Dmitri Kotchetkov for the PHENIX Collaboration Department of Physics,
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
By the end of this lesson you will be able to explain: 1. Identify the support categories for reported computer problems 2. Use Remote Assistance to connect.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
1 STAR TPC The STAR TPC Status and Additional Issues: 2009 (There are a few issues other than wire aging, and HV trips, …) Jim Thomas.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
June 4, 2009 STAR TPC review Estimation of TPC Aging Based on dE/dx Measurements Yuri Fisyak.
Hardware considerations about Ar vs. Ne
FEE for TPC MPD__NICA JINR
STAR Time-Projection Chamber
HLT & Calibration.
Kevin Burkett Harvard University June 12, 2001
Inclusive p0 Production in Polarized pp Collisions using the STAR Endcap Calorimeter Jason C. Webb, Valparaiso University, for the STAR Collaboration Outline.
Presentation transcript:

1 STAR TPC The STAR TPC Status and Issues A brief report to the STAR Council Jim Thomas

2 STAR TPC The TPC is alive and well and taking data, pp 500 The last time I spoke to the STAR Council, we were in the middle of an education and documentation project It has been reasonably successful. The TPC is up and running Goal: Plug and Play people – try to avoid singleton experts Three people know how to run the gas system (sort of …) –Alexei Lebedev –Dana Beavis –Jim Thomas

3 STAR TPC pp 500 is more demanding of the TPC … Beam currents are up compared to previous pp runs –Peak luminosity at the very end of run 8 was 2 * –Peak luminosity today is 3.8 * 10 31, and still going up –pp 500 goals are to achieve 4x higher luminosity Significantly more tripping than in previous years –Carl has taken to calling them “our old friend 18-4” –Speculation as to why this may be true –This may be due to holes in our shielding in the tunnel leading to hotspots in the TPC (consistent with Carl’s observations) –It may merely be due to increased background that goes with increased beam currents –Perhaps the TPC is getting older (aka ‘aging’) or has faults This is happening even though trigger rates are being held at about 100 Hz –A higher trigger rate means more charge travels to the anode wires; in proportion to a background rate + the trigger rate –We have tested up to 400 Hz. Rate limiter prevents exceeding 750 Hz.

4 STAR TPC Anode Currents in Run 8 Our tradition has been to keep the anode currents low to avoid damage to the TPC and to avoid aging the anode wires

5 STAR TPC Anode currents on the outer sector in Run 9 The radiation load on the TPC sectors ~ 1/r 2 so the outer sectors see less load

6 STAR TPC Inner Sector: Normal operation – GG triggered Last night at 2:20 AM To be fair, the alarm limits are set at our discretion and we haven’t changed the alarm limits on these screens compared to last year. We are debating whether it is wise … or not.

7 STAR TPC We are exploring new territory … Trigger rates could go up by a factor of 3 compared to last year The luminosity is already up a factor of 2 compared to last year and will climb higher as the run progresses pp 500 multiplicities are up a factor of 1.25 compared to pp 200 So the radiation load on the TPC could go up by almost an order of magnitude this year Here we go … –pp 500 operation is very stressful on the TPC … more stress than HI –High rate running cause the TPC anode wires to age rapidly –How much is too much … we don’t know –Peter Braun-Munzinger is concerned and raised the issue at the Science and Technology review last summer and even challenged the assumptions underlying our previous estimates of aging in the TPC

8 STAR TPC Upcoming TPC Review – report due by end of May Evaluate the seriousness of the aging problem Evaluate the impact on the physics programs Evaluates possible ways to predict and/or mitigate the problem The STAR Collaboration has recently upgraded the Time Projection Chamber readout electronics so the TPC can take data at ~1 kHz rates. The collaboration is also planning to install several new detectors whose installation will coincide, in time, with a significant increase in the luminosity of the beams at RHIC. These upgrades will allow the collaboration to continue to do compelling physics for many more years but the usefulness of these new detectors will depend on excellent performance from the TPC. Therefore, it is important to know if the TPC can meet the requirements of the experimental program in the high luminosity era at RHIC and if there are intrinsic lifetime or aging issues for the TPC that might affect how, or how long, it can run. The committee is requested to assess the performance of the TPC in the high luminosity environment which will be encountered at RHIC II, for both pp and HI collisions. The benchmark values of the luminosity for 2013, and beyond, are: Au-Au (200 GeV/N) L avg = 80 x cm -2 sec -1 pp (200 GeV) L avg = 6 x cm -2 sec -1 pp (500 GeV)L avg = 15 x cm -2 sec -1 The committee should also review the manpower commitments that are devoted to the operation of the TPC.

9 STAR TPC More Challenging Than Ever … TPC calibrations are more challenging than ever –Yesterday’s low luminosity run (12x12) was not low luminosity –Usually we try to get a very low luminosity run to calibrate our calibrations –This year we will have to calibrate the calibration run –Not to mention that the magnitude of the distortions in the physics runs will be larger than ever before The TPC is supposed to last another 10 years –One constraint: HFT takes its first data in Run 14 –Data taking sequence is 3-5 years long … run 14, 15, 16, 17,18 At some point we, as a collaboration, may decide that it is prudent to manage the luminosity of the beams –Manage the luminosity –Manage the trigger rates –Not an exact science What happens if we run the TPC until it melts? –The anode wires are the most likely component to wear out –We can replace them –Not clear that we can predict, in advance, if and when this will be necessary

10 STAR TPC Winding new grids Approximate Cost and schedule 6 technicians 1 year 1 million dollars The STAR TPC should last a long time. However, the option to replace the wire grids on the endcaps of the TPC is an extremely valuable contingency for us in case of pre-mature aging of the anode wires or other worst case scenarios.

11 STAR TPC End

12 STAR TPC TPC Manpower - Hardware Hardware –Alexei (BNL), Dana (BNL), Jim (LBL), Howard Wieman (The Temple Mount) –Blair does answer … but is anxious to preserve his retired status Gas System –Leonid Kotchenda (MePhi) [Alexei, Dana, Jim … in training for Lite duty] Interlocks –Jim Water –CAD, Alexei, Soja (BNL) Slow controls & Computers –Yuri Gorbunov (Creighton) & Wayne Betts(BNL) Electronics –STSG – Padrazo + Crew, Tonko, Jeff Landgraf, Bob Scheetz (BNL) Laser –Alexei

13 STAR TPC TPC Manpower - Software Pad Monitor –Jo Schambach (UT) has plans to upgrade the old pad monitor –Will require continuing support: new features, formats change … –Jeff arranged a test last year, Blair was able to see DAQ1000 files Bad Pad/Gain file –Tonko, Jeff Calibrations for Drift Velocity, dE/dx, etc. –Richard Witt (Naval Academy), Yuri (BNL), Patricia Fachini (BNL) Calibrations for Grid leak, Space Charge, Shorts etc. –Gene (BNL), Jim, Hao Qiu New Fast Tracker for Fast Offline –Hao Qiu (Lanzhou & BNL) + Zhangbu + Yuri

14 STAR TPC Manpower Issues Same old faces … some are wearing out –Many of these folks would like to move on to new frontiers New faces –Nu has been very good about recruiting students (esp. for calibration work) –We also need some senior faces, and people who don’t rotate so fast Slow Controls –DAQ 1000 is only one of the new systems joining STAR this year –STAR is always under-staffed in this category. Creighton does heroic work … but its only a small group … additional manpower would help ensure STAR’s future Pad Monitor –Who upgrades and maintains the new pad monitor for DAQ 1000? –Hopefully Jo Schambach is willing to do this … but unknown

15 STAR TPC New TPC Projects Possible new gated grid system and new pulser –Based on ALICE driver, depends on performance (& failure) of old drivers –R&D should proceed now Fast tracking with fast offline event pool –Hao Qiu has made an excellent start in this direction TPC Calibrations –There is always something … –Usually driven by increasing luminosity … but hardware failures are possible, too. Explore aging of the TPC wire grids –PBM challenged us at the last S&T review. Must report again. Wind new grids for the TPC –pp 500 GeV running will be very stressful on the TPC … kaput in 2 years? –Preserve capabilities, document procedures, R&D

16 STAR TPC Inner Sector: Beam Background – GG Closed The background rate is 10-20% of the total load on the anodes