Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

Myriam Newman April 13, 2007 Laser-Wire 1 Myriam Newman LC-ABD Meeting University of Oxford Thursday, April 13 Lens Performance Review Laser-Wire Team.
Beam Delivery Simulation Development & BDS / MDI Applications L. Nevay, S. Boogert, H. Garcia-Morales, S. Gibson, J. Snuverink, L. Deacon Royal Holloway,
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Latest laser-wire results ● How does a Laser-Wire work? ● Latest ATF results ● Focusing optics ● Latest PETRA results University of Oxford: Nicolas Delerue,
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Mon 03 July 06Laserwire Mini-Workshop1 Using Laserwires to Measure Emittance at the ILC Leo Jenner, Daresbury Labs.
Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
The ILC Laser-wire system Sudhir Dixit The John Adams Institute University of Oxford.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
Laser Wire: :LBPM G A Blair EUROTeV Scientific Workshop, Uppsala 27 th August 2008 Introduction Emittance extraction Experimental programme Laser R&D Summary.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF LBBD-collaboration Laserwire update Adams Institute (Oxford/Royal Holloway) G.
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
Extraction Line Laser-wire 24 th January 2013 A.Aryshev, G.A.Blair, S.T.Boogert, L.Corner, L. Nevay, P.Karataev, N.Terunuma, J.Urakawa, R.Walczak.
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
L ASER - WIRE U PDATE Commissioning of the PETRA3 Laser-wire Summary of first ATF-ext laser-wire Installation of ATF2 laser wire Grahame Blair CLIC Technical.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Diagnostics Workpackage G A Blair EUROTeV Final Meeting, DESY, Hamburg 30 th January 2009 Tasks Summary.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
1 RTML Emittance Measurement Station Yuri Kubyshin (1), Robert Apsimon (2), Hector García (1,2) (1) Technical University of Catalonia (UPC) (2) CERN CLIC.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
3rd September 2004 G. Blair, RHUL1 Laser Wire Update G. A. Blair Royal Holloway Univ. London ECFA LC Workshop Durham 2 nd September 2004 Laser-wire at.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
What did we learn from TTF1 FEL? P. Castro (DESY).
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
at Royal Holloway Univ. London
Testbeam plans for LEP instrumentation
Plans for Laser-wire System Grahame Blair 30th May 2005
Laserwire: high resolution non-invasive beam profiling
Beam Size Monitor Model
Diagnostics Summary G. Blair RHUL 23rd June 2005
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
3rd ATF2 Project Meeting, December 18-20, 2006
Laser-wire Measurement Precision
Presentation transcript:

Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.

BESSY: T. Kamps DESY : E. Elsen, H. C. Lewin, F. Poirier, S. Schreiber, K. Wittenburg, K. Balewski B. Foster, N. Delerue, L. Corner, D. Howell, L. Nevay, M. Newman, A. Reichold, R. Senanayake, R. Walczak G. Blair, S. Boogert, G. Boorman, A. Bosco, L. Deacon, P. Karataev, S. Malton, M. Price I. Agapov (now at CERN) KEK: A. Aryshev, H. Hayano, K. Kubo, N. Terunuma, J. Urakawa SLAC: A. Brachmann, J. Frisch, M. Woodley FNAL: M. Ross Laser-wire People

Laser-wire Principle PETRAII 2d scanning system DAQ development Crystal calorimeter → PETRA III Ultra-fast scanning Diagnostic tool

Laser wire : Measurement precision NOTE: Rapid improvement with better σ y resolution Reconstructed emittance of one ILC train using 5% error on σ y Assumes a 4d diagnostics section With 50% random mismatch of initial optical functions The true emittance is  m  rad The Goal: Beam Matrix Reconstruction I. Agapov

x y u Skew Correction Error on coupling term: ILC LW Locations E b = 250 GeV x(m)x(m)  y (  m)  opt (° )  u (  m)

2σ scan 2σe2σe 2αJσe2αJσe N train bunches 2σ L =2cτ L 2σ e (1 + s train ) α train σ e Scan of an ILC Train of Bunches Not to scale!

Need for Intra-Train Scanning For <0.5% effect, s train <0.12; otherwise, the effect must be subtracted For 1  m bunches, the error after subtracting for any systematic shift (assumed linear ±α train along the train) is: For <0.5% effect, α train <2.6; otherwise, higher precision BPMs required

Machine Contributions to the Errors Bunch Jitter Dispersion Assuming  can be measured to 0.1%, then  must be kept < ~ 1mm BPM resolution of 20 nm may be required

Alternative Scan Mode R&D currently investigating ultra-fast scanning (~100 kHz) using Electro-optic techniques Alternative: Keep laser beam fixed and use natural beam jitter plus accurate BPM measurements bunch-by-bunch. Needs the assumption that bunches are pure-gaussian For one train, a statistical resolution of order 0.3% may be possible Beam jitter fixed at 0.25 σ BPM resolution fixed at 100 nm Single-bunch fit errors for

σ ey σ ex σℓσℓ xRxR laser beam electron bunch √2σℓ√2σℓ For TM 00 laser mode: Laser Conventions

Compton Statistics Approximate – should use full overlap integral (as done below…) Where : Laser peak power Detector efficiency (assume Cherenkov system) Compton xsec factor Laser wavelength e-bunch occupancy

TM 00 Mode Overlap Integrals Rayleigh Effects obvious Main Errors: Statistical error from fit ~  -1/2 Normalisation error (instantaneous value of  ) – assume ~1% for now. Fluctuations of laser M 2 – assume M 2 known to ~1% Laser pointing jitter 

Y. Honda et al E stat E M2 TM 01 TM 00 TM 01 TM 00 TM 01 TM01 gives some advantage for larger spot-sizes

Laser Requirements Wavelength  532 nm Mode Quality  1.3 Peak Power  20 MW Average power  0.6 W Pulse length  2 ps Synchronisation  0.3 ps Pointing stability  10  rad ILC-spec laser is being developed at based on fiber amplification. L. Corner et al

ATF2 LW; aiming initially at f 2 ; eventually f 1 ? TM 00 mode Error resulting from 5% M 2 change Statistical Error From 19-point scan Optimal f-num  for = 532nm Then improve M 2 determination f-2 lens about to be installed at ATF Relative Errors

Towards a 1  m LW Wavelength266 nm Mode Quality1.3 Peak Power20 MW FF f-number1.5 Pointing stability 10  rad M 2 resolution1% Normalisation (  ) 2% Beam Jitter 0.25  BPM Resolution20 nm Energy spec. res10 -4 Goals/assumptions EE 2.5 E point 2.2 E jitter 5.0 E stat 4.5 EM2EM2 2.8 Total Error8.0 Resultant errors/10 -3 Could be used for  measurement → E  Final fit, including dispersion preliminary

Lens Design + Tests Aspheric doublet N. Delerue et al. Vacuum window f-2 lens has been built and is currently under test. Installation at ATF planned for this year M. Newman, D. Howell et al. Designs for f-1 optics are currently being studied, including:

BDS Laser-wire PETRA – 2d scans, multi-shot. ATF – micron, single shot Laser R&D Fast Scanning R&D Simulation All initial goals have been achieved. New fibre-laser programme at Oxford now under-way in collaboration with EU industry BDSIM plots. At ATF2: EzEz EO fast scanner under test at RHUL; plan to use at PETRAIII

PETRA LW PETRA II 1000 laser shots= 50s. beam: 6 GeV, 0.5 mA. Routine scans of two-dimensions were achieved PETRAII programme now finished; preparing for PETRAIII Fast scanning system with 130kHz laser at RHUL planned Collaborating with DESY on fast DAQ Look forward to installation in new location for PETRAIII next year

Tests of f 2 lens system currently underway at Oxford We will improve ATF laser at KEK in October 2007 Look forward to running with f2 optics in Nov 07 and in ATF LW single LW scan quad scan using LW scans

ATF2 Laser-wire New laser hut New LW location Detailed design of layout, light path, laser hut are underway. An additional LW location has been reserved downstream for multi-axis scans → LC-ABD-II

ATF/ATF2 Laser-wire At ATF2, we will aim to measure micron-scale electron spot- sizes with green (532 nm) light. Two locations identified for first stage (more stages later) 1)0.75m upstream of QD18X magnet 2)1m downstream of QF19X magnet LW-IP (1)LW-IP (2) σ x =  m σ x =  m σ y = 7.74  m σ y = 7.94  m Nominal ATF2 optics ATF2 LW-test optics P. Karataev LW-IP (1)LW-IP (2) σ x =  m σ x = 20  m σ y = 0.9  m σ y = 1.14  m  Ideal testing ground for ILC BDS Laser-wire system

Summary Very active + international programme: –Hardware –Optics design –Advanced lasers –Emittance extraction techniques –Data taking + analysis –Simulation All elements require R&D –Laser pointing –M 2 monitoring –Low-f optics –Fast scanning –High precision BPMs Look forward to LW studies at PETRA and ATF ATF2 ideally suited to ILC-relevant LW studies. CLIC Laser-wire parameters will also be studied