Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.

Slides:



Advertisements
Similar presentations
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 1 Forward Multiplicity Detector FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Technical Forum, 8 March 2007Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
HFT face-2-face F.Videbaek Brookhaven National Lab.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
PHOS progress in LS1 Alexander Vinogradov 11 August 2014.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Status of NA62 straw electronics Webs Covers Services Readout.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
(Alice COsmic Ray Detector) Status Report
PIXEL CAEN Installation Status
Status of NA62 straw electronics and services
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Børge Svane Nielsen/JJG
T1 Electronic status Conclusions Electronics Cards:
10/month is the present production rate 2 FTE + sporadic contributions
Pierluigi Paolucci - I.N.F.N. Naples
Presentation transcript:

Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute

Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 2 Assembly and Transport FMD3 FMD2 CERN

Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 3 Arrival and Unpacking Shipped and unpacked TPC cleanroom used for testing and verification Shipped and unpacked TPC cleanroom used for testing and verification

Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 4 Installation Case carried to main building Brought to pit via elevator Crane put case on scaffolding Unpacked and carried to IP Installed in halves around beampipe on temporary support Cabled up

Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 5 Issues Some readout cables severed during packaging for shipping Some fixable module damage –Damaged bonding wires –Damaged hybrid connector HV patch cable connector damaged –Changed to different type connector for FMD2 Some power cable cross-sections increased –-2V supply for FMD3 had cross-section doubled –Cables for FMD1 and FMD2 quadrupled in cross-section (cables also twice as long)

Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 6 Testing Commissioned using DAQ and Trigger subsystems HV from CAEN power supply, LV from test power supplies (not CAEN) Commissioning testing showed noise consistent with lab tests Some optimization can be performed –Should be done after we have final LV power supplies

Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 7 DCS PVSS control/monitoring of HV, LV, and detector implemented Some debugging required - HV control has been used Alexander Kurepin of T0 group collaborating to finish DCS work

Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 8 Remaining Tasks Install FMD2 on June 24 Finish A-side cabling FMD2 testing at service chariot - end of July after TPC is in IP FMD1 is under construction, installation - early October DCS integration from early August Commissioning with CAEN LV power supplies (when?) Install final trigger configuration –Final TTC fiber –Fan-in Fan-out