Cosmic Origins Spectrograph

Slides:



Advertisements
Similar presentations
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Investigations Rick Finnegan April 22, 2008.
Advertisements

Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
Project Management Methodology (PMM)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
Initial Alignment Check / Calibration in Vacuum Dennis Ebbets With substantial contributions from Tom Delker, Erik Wilkinson, Steve Osterman, Ken Brownsberger,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
Page 1. Page 2 SMOV Status SMOV is proceeding on-track Key programs executed –ERO program –Geometric distortion program completed –ACS to FGS alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
Request for Service (RFS) Process and Metrics Update June 24, 2008.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
Cosmic Origins Spectrograph November 13, 2003 Page 1 “Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
Introducing the INS Master Schedule Wayne Baggett.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
STScI Ground System Development Status:
Presentation transcript:

Cosmic Origins Spectrograph Charles D. (Tony) Keyes Last MSR: 22 April 2002 16 July 2002

The project is on track (green) Project Summary A M J Remarks Budget G G G Schedule G G G Technical G G Y G Y FUV QE grid The project is on track (green) most recent report: 22 April 2002 LEGEND: G NOMINAL MODERATE PROBLEM SOLUTION EXISTENT Y R MAJOR PROBLEM NO SOLUTION YET

Schedule

Health Chart Subproject Staffing Schedule Technical Instrument Development OK (g) ongoing (g) IDT/STScI MOU (g) FUV I & T CU/UCB (y) Commanding and RPS2  OP-01 (g) calib exposure development (g) Pipeline and Calibration  keyword development (g) pipeline development (g) SM4 initial planning (g)

Instrument Development (FSW) DATE Y PROBLEMS/ISSUES PROGRAMMATIC IMPACT ACTION ESTAB. COMPL. Delay of FSW implementation for target acquisition (Build 4.0) Delays timeframe for testing our acq commanding and delays availability of subset of test image data Revised FSW development schedule implemented at Ball CURRENT STATUS Open  Tool is not mature enough for use in Cycle 11 Phase II Cycle 11 Phase II to be released Spring ‘02 (originally January ‘02) Evaluation underway (internal & external evaluators) look and feel GUI process model STScI front-end development completed; one-month Ball schedule slip this period (Sep 02 delivery); no impact on beta OPUS/HDA Delivery nor Thermal-Vac MOU schedule; now one month of float

Instrument Development DATE Y PROBLEMS/ISSUES PROGRAMMATIC IMPACT ACTION ESTAB. COMPL. None to STScI short-term; delays integration of FUV flight detector; IDT delay in MOU deliverables, T-V and SI delivery; additional long-term impacts possible IDT investigation: review of qualification procedures and test data; secure new grid; revise test procedures; utilize ETU for optical bench fitting activities; implemented repair and testing FUV detector QE enhancement grid breakage CURRENT STATUS Open  Tool is not mature enough for use in Cycle 11 Phase II Cycle 11 Phase II to be released Spring ‘02 (originally January ‘02) Evaluation underway (internal & external evaluators) look and feel GUI process model Investigation complete; fix identified, implemented, and integrated; detector scrubbed and testing proceeding; 4-week delay to SI schedule and MOU deliverables (STScI T-V support development); FUV install in optical bench expected late July.

Highlights - Accomplishments SI News: FUV flight detector QE grid breakage in detector T-V testing Detailed investigation conducted; full review of qualification and inspection procedures; modeling of material and test properties; design fix fabricated, installed, tested, and verified; re-scrub detector. Final vibration and thermal-vac testing of flight unit FUV01 to be performed in July; cumulative 4-week schedule impact. (continues yellow ) MEB functional tests completed successfully FUV and NUV gratings all installed on Optic Select Mechanisms (OSM) OSMs installed in COS optical bench OSM repeatability and stability accuracies require wavecal with each new central wavelength including FP-POS positions Completed and delivered COS Mini-Handbook Initiated SM4 SMOV requirements planning Joint effort with COS IDT

Highlights - Accomplishments (cont.) STScI scheduling system Phase 5 Scheduling System components FLATFIELD exposures and SAA contours completed on schedule AUTO “WAVECAL” exposures in code development; revision of FP-POS (formerly called FP-SPLIT) exposure capability Ops bench testing at Ball for all components per Ball FSW availability timeline (Aug 02) Phase 6 integrated schedule established Continued keyword review; established COS Association requirements Commenced Bright Object Protection requirements review Evaluated FASTEX Standards for use with COS 2 are acceptable; FUSE DD observations submitted and approved Established STScI COS public WWW pages

Additional Information Appendix Additional Information

APPENDIX: Planned Activities and Future Milestones Commence Phase 6 Special Commanding requirements definition Commence Phase 6 Anomalous Recovery, Initial Turn-on developmnet Complete Phase 5 AUTO-WAVECAL exposure development Continue STScI FSW macro-timing tests on ops bench Complete review and issue OSM thermal issues report Continue keyword review; add TV-specific keywords to ICD-19 Commence Bright Object Screening scheduling system development Commence APT/ETC development Milepost Dates: {+ ==> later than last report} COS integrated SI test data to STScI: 1 Sep 2002 (no change) [Ball timeline] SI delivery to GSFC: 20 Mar 2003 (+1 month) [Ball timeline/QE grid impact] Launch: February 2004 (no change) [SM3B + 2 yr]

APPENDIX: COS Phase Development Plan (rev 6, 10/26/01) Macro Development Reconfigurations Phase 2 (7/1/00 – 12/31/00) NUV Timetag Mode + Darks FUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) FUV & NUV Accumulation Science Exposures FUV & NUV Target Acquisition Exposures FUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) Aperture Alignment Exposures OSM1 Focus Alignment Exposures OSM1 Rotation Alignment Exposures OSM2 Rotation Alignment Exposures FUV & NUV FP-Split Exposures Phase 5 (1/1/02 – 6/30/02) FUV & NUV GO Wavelength Calibration Exposures FUV & NUV Flat Field Lamp Calibration Exposures FUV & NUV Automatic Wavelength Calibration Exposures SAA Contours Phase 6 (7/1/02 – 12/31/02) SMGT Preparations SMOV Special Commanding FUV & NUV Anomalous Recovery FUV & NUV Initial Turn-on FUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) FUV & NUV Lifetime Adjustments

APPENDIX: Project Synopsis Role: STScI supports COS science operations by leading development of “front-end” (operations) and “back-end” (OPUS/MAST/calibration) ground system and user support functions. COS project is led by NISD, and presently consists of 12 people (7.65 FTE) drawn from NISD, SISD, and ESS. The project is on track (green) most recent report: 22 April 2002

APPENDIX: Resource Summary Current COS Resources (FY 02) NISD 3 Scientists (3.0 FTE) SISD 1 Data Analyst (0.5 FTE) ESS 1 System Engineer (0.5 FTE) 1 Command Development System Engineer (1.0 FTE) 1 Instrument Engineer (0.4 FTE) 2 Developers (1.25 FTE) Pipeline Development (1.0 FTE)

Progress versus Planned Milestones and Requirements: APPENDIX: Metrics Progress versus Planned Milestones and Requirements: 5 of 7 planned activities completed within reporting period COS Operations Working Group Action Items: 0 opened, 0 closed; 2 revised during review period 4 presently open (1 High, 2 Medium, 1 Low) COS Calibration Working Group Action Items: 0 opened, 0 closed during review period 0 presently open

APPENDIX: COS FUV QE Grid old broken new

APPENDIX: COS STScI WWW Page www.stsci.edu/instruments/cos