M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July 2015 1 In this talk Preparation of mass construction (including DOM and DU integration)

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

1 4CB Status report T2S Advisory Group 19&20 November 2013.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
DCal Meeting
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
Technical Support Activities in PH-ADO-PO
Compressor status AWAKE Technical Board meeting 19 August 2015.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators on behalf.
ECC Task Force Webinar November 13, Peak Anti-Trust Statement Meeting Minutes (June and Sept) Phase 1A Progress Phase 1A External Entity Testing.
DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015.
DOM INTEGRATION MEETING DAAN VAN EIJK 28 JANUARY 2016.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Control Considerations for the KM3NeT Very Large Volume neutrino Telescope” The.
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
CLB meeting APC Tentative action/work list.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
DOM assembly KM3NeT collaboration meeting Assembly Edward Berbee The cooling mushroom is put in place with tooling, a minimum amount of.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
Camera PDR/CD1 Planning 19 September 2008
DOM & DU tendering and assembly
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Status Optical System KM3NeT
Jim Fast Pacific Northwest National Laboratory
Managing the Project Lifecycle
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
CSP 25th November 2010 Technical agreement number 3: overview
Pasquale Migliozzi INFN Napoli
Complementary ISTC Projects #3888, 3889p
Double Star Progress Meeting #3 Beijing 2 July, 2002.
DOM integration meeting
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Mini-drawers, FE-ASIC , Integrator
Far Detector Activities Late 2017 – Early 2018
DOM Assembly SUBATECH status H. Carduner, Bari June
East Hall under construction
Presentation transcript:

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration) DU-2 Procurement of components Documents for STAC Review of the project

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July Preparation of mass construction PMTs: 15,000 available – 7,500 being equipped (base installed, coating, test) in Naples – 7,500 shipped to Erlangen (test scenario to be defined) DOM/DU integration sites:  4 DOM integration sites (Catania, Naples, Erlangen, Nikhef) preparing to mass production – target speed is 3-5 DOMs/week/site – each site committed to 120 DOMs  Strasbourg expected to join DOM integration later (people available, applying for funds)  3 DU integration sites in preparation: Nikhef, LNS and Naples  3 deployment preparation sites in preparation: CPPM, LNS and Naples Important points:  Request for funds for 6 LOMs and 4 acoustic release frames ongoing in Italy (in order to sustain installation of batches of DUs)  Transportation (of components, DOMs and DUs) to be organized by all involved institutes until this is centrally supported (Common Fund)

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July 2015 DU-2 (general remarks) 3 Infrastructure in KM3NeT-It ready for connection (new CTF and JB installed) PPM-DU left disconnected at end of operation (additional motivation to go for deployment of DU-1&2!) Integration plan defined DOMs built in Nikhef, Naples, Catania Base module built in Bari Integration of DOMs to VEOC started at Nikhef, completed in Naples Integration of base module to VEOC and all following actions (tests, arrangement on LOM, etc.) to be done in Naples Schedule slipping (see later): first 3 DOMs mounted with VEOC, the rest awaiting for VEOC upgrade Aiming for a deployment in fall (from second half of October until mid-November) Review to be launched in early September From now on: alternate-weekly meeting on DU-1 and DU-2 (next one will be on August 5) DU-integration mailing list set up (I will distribute instructions for subscription soon after this meeting)

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July 2015 Preparation of DU-2 4 Availability of components: DOMs – full set in production at NIKHEF + 3 to be built in Catania + 3 in Naples (progressing well, see Daan’s report) VEOC – available but needs modification to BEOC (see Edward’s report) buoy - ordered mechanical parts for buoy – to be produced ropes and mechanical parts for DU – can be procured quickly anchor – available, under finalization base container – in preparation (in aluminum!) – see next slide equipment for base container – available (except BCI, which has been ordered) Availability of deployment tools: LOM and acoustic release – available acoustic release frame – not available steel ropes for acoustic release and acoustic release controller – presumably available (to be confirmed) Availability of integration and test tools: LOM loader – available welding machine – available testing equipment – available dark room – very simplified layout considered (DU arranged on transportation palette and shielded from light) dark rom calibration tools – available shore station/DAQ test station – in preparation Field test equipment – to be defined (can it be the same as for DU-1?)

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July 2015 Base container of DU-2 5 Penetrator (dummy case) and mockup of endcap of BEOC used for tests of the screws Internal frame Front ViewRear View Flange equipped with all needed connectors and (dummy) penetrator for pressure test Connector for jumper Connector for hydrophone Dummy penetrator and dummy BEOC endcap Recent news: Flange machined and equipped with connectors and (dmmy) penetrator for pressure test Pressure test of sealed container ongoing (today!) Cases of penetrators produced, now being equipped with feedthrough in USA

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July 2015 DU-2 (tentative) schedule 6 VEOC upgrade required for proceeding with integration of DOMs with VEOC Penetrator (feedthrough) to be implemented by Pave Technology (to be tested later by KM3NeT)

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July Procurement of components Decided/ongoing: BCI (BPS-CLB Interface for base modules) – 35 (enough for full Phase-1) AHRS – 190 (enough for completing Phase-1) Power-boards – 350 (enough for completing Phase-1) VEOC – new round of pre-production for 5 cables DC/DC converters for the 5 VEOCs (estimated delivery: October) – should we start by building one VEOC ORCA-style with the existing DC/DC of Nikhef? SFP receivers for shore stations in KM3NeT-Fr and KM3NeT-It Note added during the meeting: SFPs and optical components for base modules of KM3NeT-Fr to be sorted out Please inform me of ANY new order of components, possibly in advance if it requires more than 10 kEuro (they need to be accounted for in the table cost of the experiment)

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July Documents for STAC This is the list of documents requested from STAC earlier this year: a)The work breakdown structure (WBS) (priority 1) b)The top level cost estimate (priority 2) c)The project schedule that shows a roll up of the major tasks (priority 1) d)A system block diagram with all the major at-sea and shore-side subsystems (priority 1 if easily available, priority 2 otherwise) e)The quality assurance documents and periodic reports (priority 1) f)The risk management documents a)The reliability analysis, the risk register and the periodic reports are priority 1 b)The FMECA, FTA are priority 2 g)Manufacturing documents and procedures (priority 2) h)Overall system test plan (priority 1) and procedures (priority 2) i)Results of any previous technical reviews and PRRs (priority 1) This is what we provided or promised (in yellow fonts, together with further requests): a)document provided b)no document provided – reference done to presentations at previous meetings c)no document provided - milestones discussed at the meeting d)document with system block diagram promised for September e)NCR/DCR list provided, statistics of QAQC forms shown at meeting – their counter-request was to see how the recent infrastructure problems (fault on node in KM3NeT-Fr, corrosion on JB of KM3NeT-It) are followed up in our QAQC system f)sample of reliability studies document (CLB) provided – their counter-request was to see an executive summary of all these studies g)document on manufacturing and test procedures promised for September h)qualification plan promised for September i)reports on PRR of electronics and review of DU-1 provided, with the promise to send all new documents concerning review of the project

M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July Review of the project Finalized: PMTsinternal review – concluded June 2013 DAQ systemexternal review – meeting with reviewers: 7 August 2014 – report delivered optical systemexternal review – meeting with reviewers: 28 October 2014 – report delivered Being finalized: electronicsexternal review – meeting with reviewers: 9-10 September 2014 – reply to report from reviewers prepared DU-1internal review – meeting with reviewers: 9 April 2015 – all actions being addressed Started: VEOC (by Teledyne/ODI)Started in mid-June In preparation: optical module integration (internal review) Target starting date: September DU-2 mechanics and deployment (internal review)Target starting date: September power system (external review) Target starting date: (late) summer a) calibration (external review) Target starting date: (late) summer a) string mechanics & deployment (external review)Target starting date: late summer – fall b) Remarks: a) Including experience in construction of DU-1 b) Including experience from installation of DU-1 and/or DU-2