Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.

Slides:



Advertisements
Similar presentations
Kay Graf Physics Institute 1 University of Erlangen ARENA 2006 University of Northumbria June 28 – 30, 2006 Integration of Acoustic Neutrino Detection.
Advertisements

Status of the ANTARES Neutrino-Telescope Alexander Kappes Physics Institute University Erlangen-Nuremberg for the ANTARES Collaboration WIN´05, 6.–11.
Kay Graf Physics Institute University of Erlangen TeV Particle Astrophysics II Madison, WI, USA August 28 – 31, 2006 Towards Acoustic Detection of UHE.
Prototype string for a km3 Baikal neutrino telescope Roma International Conference on Astroparticle Physics V.Aynutdinov, INR RAS for the Baikal Collaboration.
By E. Anassontzis, A. Belias, E. Kappos, K. Manolopoulos, P. Rapidis on behalf of the KM3NeT Collaboration.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
Catania VLVnT09 Athens, Greece 1/14 Catania Performances of four super bialkali large area photomultipliers with respect to.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
Francisco Salesa Greus IFIC (CSIC–Universitat de València, Spain) Representing the KM3NeT Consortium 4 th International Workshop on Very Large Volume Neutrino.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
V.Bertin CPPM / ANTARES Coll. - Moriond ANTARES : A deep-sea 0.1 km² neutrino telescope Vincent Bertin - CPPM-Marseille on behalf of the Antares.
Amsterdam 29 March 2011 Fernando Urbano IFIC (CSIC – Universidad de Valencia) KM3NeT Optical Calibration Laser Beacon and Nanobeacon Status.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
INSTRUMENTATION NEEDS FOR THE CALIBRATION UNIT …AS A WORK DOCUMENT Pascale Keller KM3Net Meeting CPPM, january 2013 Inputs from : Miguel Ardid, Tassos.
S. Viola VLVνT 2015, Rome – 14/09/2015 Characterization and testing of the KM3NeT acoustic positioning system F. Simeone VLVνT 2015 – Rome, 14/09/2015.
31 May 2006Federico Paoletti Elba GWADW 1 Available traps (short sensors’ list) l Fast monitoring (50Hz < f sample < 20kHz)  vertical high frequency accelerometers.
Karman filter and attitude estimation Lin Zhong ELEC424, Fall 2010.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
Review of Positioning in ANTARES Dr. Lee F. Thompson Department of Physics and Astronomy University of Sheffield Special thanks to Vincent Bertin, CPPM.
KM3NeT Pylos meeting, April, 2007 Some preliminary studies for the positioning calibration of KM3NeT Miguel Ardid Universitat Politècnica de València.
Acoustic Calibration for the KM3NeT Pre-Production Module Alexander Enzenhöfer on behalf of the KM3NeT consortium VLV T 2011 Erlangen, –
First results from the Biocams J. Brunner. Cameras on floor 1 and floor 5 together with an OM and an ADCP Floor 1 –80m above sea floor Floor 5 –270m above.
The ANTARES Project Sino-French workshop on the Dark Universe Stephanie Escoffier Centre de Physique des Particules de Marseille On behalf of the ANTARES.
Catania 11 ICATPP october, 2009 Como 1/12 Catania Comparative measurements of the performances of four super bialkali large.
DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
PMT measurements in Antares Oleg Kalekin on behalf of Antares collaboration VLVnT 2011 Erlangen
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Nanobeacon test (Could the Nanobeacon be used to extract the PPS signal from the DOM once closed?): Signal 1 (yellow).- Nanobeacon trigger signal derived.
AHRS calibration and performance study V. Kulikovskiy.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
The Trigger and Data Acquisition System for the KM3NeT neutrino telescope Carmelo Pellegrino Tommaso Chiarusi INFN - Sezione di Bologna VLVnT 2015 | Rome,
Characterization of Hamamatsu R12199 PMTs Oleg Kalekin KM3NeT Meeting CPPM, Marseille
Development of combined sensors for UHE neutrino detection Alexander Enzenhöfer ARENA 2010 Nantes,
G. Larosa, M. Ardid (for the KM3NeT Consortium) Institut d’Investigació per a la Gestió Integrada de les Zones Costaneres - Universitat Politècnica de.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
VLVNT’08 - ToulonM. Ardid – Positioning System of the ANTARES Neutrino Telescope Positioning system of the ANTARES Neutrino Telescope Miguel Ardid (IGIC.
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
Status and Perspectives of the BAIKAL-GVD Project Zh.-A. Dzhilkibaev, INR (Moscow), for the Baikal Collaboration for the Baikal Collaboration September.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
Umberto Emanuele IFIC (CSIC-UV), Valencia (Spain) Status of Time Calibration System forKM3NeT.
KM3NeT Optical Calibration Umberto Emanuele IFIC (CSIC – University of Valencia, Spain) WPF/L KM3NeT Meeting Nikhef 5 th - 7 th July
Marseille 29 January 2013 Diego Real IFIC (CSIC – Universidad de Valencia) Instrumentation for Optical Calibration: Laser Beacon and Nanobeacon.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Giorgio Riccobene, LNS-INFN KM3NeT WPF/L Meeting, NIKHEF 5-7/07/2010 Status of the Acoustic Calibration System for KM3NeT.
Summary of Calibration and Instrumentation Session Robert Lahmann KM3NeT Collaboration Meeting, CPPM, 31-Jan-2013.
Test boxes software and first tests V. Kulikovskiy.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
Multi-PMT DOM P.Kooijman University of Amsterdam-GRAPPA Presentation for SSC.
Pre-Production Models for KM3NeT
Deep-sea neutrino telescopes
DOM acceptance and calibration
Characterization of the ETEL and HZC 3+ inch PMTs
Robert Lahmann VLVnT – Toulon – 24-April-2008
T. Eberl for Robert Lahmann and the Erlangen acoustic group
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
Els de Wolf 20 February 2012, Catania
TDR of PMT: Timing issues
LHAASO-WCDA: Design & Performance
ANTARES time calibration
Directional Optical Module Integration
Department of Physics and Astronomy,
Nanobeacon: A low cost calibration instrument for KM3NeT
Presentation transcript:

Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration

Contents DarkBox (acceptance and calibration of all PMTs before assembly into DOMs) GreenBox/BlueBox (acceptance and calibration of the DOM before integration in a DU) Time synchronization Acoustic positioning Calibration Unit (seawater properties measurement, part of the system for acoustic positioning of DOMs and interline time calibration with laser). V. Kulikovskiy, KM3NeT Calibration, VLVNT2015 2

PMT qualification - DarkBox Simultaneous tests of 62 PMTs (2 DOMs). Electronics + DAQ reused from the final project. 2 CLBs synchronized with White Rabbit Switch. Octopuses + long cables for the PMT connections. Laser triggered using the DOM nanobeacon trigger (synchronous with CLB clock) Splitter for 62 channels with the same fiber length and similar power output. See talk of Carlos Napoli PC CLB1 CLB2 Laser Controller trigger optical WR Switch 3

PMT qualification - DarkBox PMT calibration and qualification: HV tuning to have fixed Time over Threshold time (ToT correlates with number of photoelectrons) Darkening (>8 h), dark rate measurement. Transit time: TT peak, TTS (PMT delay + base digitisation) Spurious pulses (prepulses, delayed, afterpulese type II) DB upload – PMT passed qualification are ready to be used in the DOMs (precalibrated).

HV tuning Dynodes voltage ratio used for KM3NeT is not the default option – HV tuning is needed to be performed. Tune HV to have 26.4 ns ToT mean (the value obtained from the PMTs with tuned proper gain). V. Kulikovskiy, KM3NeT Calibration, VLVNT2015 5

Darkening Several hours of rate monitoring. V. Kulikovskiy, KM3NeT Calibration, VLVNT2015 6

Laser measurements First hits are collected to determine TT peak, TTS, prepulses, delayed pulses. Secondary hits are collected to determine afterpulses. First hits (-10, 100 ns)Secondary hits (0 – 20 μs) V. Kulikovskiy, KM3NeT Calibration, VLVNT2015 7

DOM acceptance tests Temperature, humidity, pressure check. PMT tests dark rates test after integration: effects of the structure, glass, gel Time calibration with laser (4 reference PMTs). K40 coincidence rates: PMT placement check + PMT time intercalibration. LED beacon test. Piezo qualification. AHRS calibration: magnetometer scans (3D rotation). Electronic test (WR synchronization, DAQ system is equivalent to the final detector DAQ). 8

K40 calibration K40 decays in glass, gel are seen by the neighbor PMTs. Rate depends on the angular distance. DOM with proper PMT numbering.DOM with wrong PMT numbering. V. Kulikovskiy, KM3NeT Calibration, VLVNT2015 9

Piezo calibrations GreenBox Noise level (increases when PMTs are ON) Test with 30 kHz sound emitter V. Kulikovskiy, KM3NeT Calibration, VLVNT

AHRS calibration AHRS comprises magnetometers, accelerometers and gyroscopes. Sensor fusion algorithms (Kalman filter) are used for yaw, pitch, roll calculation. Magnetometers calibration to compensate for the internal fields (due to metal components). Earth field makes sphere when the DOM is rotated. Rotation in three planes (XY, YZ, ZX) using automatic rotation table. Orientation check for 4 directions (N,E,S,W). V. Kulikovskiy, KM3NeT Calibration, VLVNT

Time synchronization Bidirectional connection via single fiber for the string Base: WR solution! Common line delay measurement. Base DOM Time and control (Slow control) broadcast from the master WRS to all DOMs, data return to the data switch. Synchronization thanks to the fixed delays (due to the short paths inside the line) Normal switch The longest fiber (~50 km in Toulon, 100 km in Capo Passero) is common for the base and the DOMs. See talk of Gerard Kieft

Time calibrations The longest fiber (~50 km) is common for the base and the DOMs. One needs to measure delays in not common paths of the base and the DOMs: Base: laboratory calibrations with short 5 m cables (known delay line). Reference CLB with frozen FW (“calibrator”) to monitor delay changes due to CLB FW change/shore station upgrade. Final delay line measurements. DOMs intercalibration: laboratory calibrations with laser in the dark room. PMT intercalibrations: K40. In situ: Laser calibrations, nanobeacons. FVP 100/110 (5 m) 1x20 PMMA 1000 (5 m) FC/PC FC/PC – FC/PC FC/PC Laser Head PiLas Mod. EIG2000DX V. Kulikovskiy, KM3NeT Calibration, VLVNT2015

DU-1 calibration PPS synchronization (Shore + base) – sub- ns precision. Inter-DOM time calibration with laser 14

DU-1 calibration: piezos Acoustic signal timing (emitter is close to DOM) Correlation analysis: emitted signal with a known shape (sinusoidal) vs detected signal + noise. V. Kulikovskiy, KM3NeT Calibration, VLVNT

Positioning Acoustic emitters on the calibration lines with known position. Hydrophones (sensitive acoustic receivers) in the base of each line) Piezo receivers inside the DOMs AHRS inside each DOM for the orientation LBL transceivers Detection Unit Receiver Piezo Hydrophone DU Base Beacon AHRS See talk of Salvo Viola 16

Calibration unit Calibration Base (CB) laser beacon (interline time calibration + water optical properties monitoring) long-baseline acoustic beacon (positioning for DOMs) Hydrophone (positioning of CB) Instrumentation Unit (IU) instrumentation base (electronics interface board and an inductive modem) environmental monitoring instruments (conductivity salinity, temperature, sound velocity, sea currents +?) See talk of Bruny Baret V. Kulikovskiy, KM3NeT Calibration, VLVNT

Summary Calibrations and quality control on different stages in the lab: PMTs – DarkBox at Naples DOMs – Green/Blue boxes at integration sites (NIKHEF, Catania, Naples) Line – first line CPPM (deployment line), next line – integration sites (Naples, NIKHEF) Calibrations and monitoring in situ: DOMs: PMTs, Nanobeacons, piezos, AHRS Base line: hydrophones Calibration Units Acoustic receivers/emitters, laser beacone, environmental conditions instruments. V. Kulikovskiy, KM3NeT Calibration, VLVNT