CSC3047 IT Enterprise Project Dr Darryl Stewart Dr Barry McCollum Dr Paul McMullan.

Slides:



Advertisements
Similar presentations
MEDICAL MUTUAL OF OHIO Corporate Data Warehouse January 17, 2000 By Terry Cleary Alycia Lieber Mike Mina.
Advertisements

QUALITY ASSURANCE AGENCY FOR HIGHER EDUCATION Handbook for Academic Review Karen Czapiewski.
NB DataConnect Phase 1 – SIS Replacement Project 1.
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
P3, P4, P5, P6.
OPUS-College Student Information System Current State of Affairs (pre-milestone 3.1)
ACS 567: Software Project Management Spring 2009 Instructor: Dr. John Tanik.
EPortfolio for UG and PGT students An update for Heads of Teaching and Learning, November 2011 Professor Barry Hirst Dean of Postgraduate Studies Medical.
NSG Software Development Acceptance Test Presentation May 2, 2006 NSG Software Development May 2,
Project Overview E911 Provisioning System Royal Flush Software
IASCE Conference Athlone October 7 th & 8 th 2004 Responsive Evaluation. Working with Stakeholders: A review of the Open Training College Quality Assurance.
1 As Class Convenes u Find your team; pick up your team’s folder; and select a table u If your team is presenting today – load your presentation –turn.
10/7/1999Database Management -- R. Larson Database Administration: Additional Issues University of California, Berkeley School of Information Management.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
Interface Programming 1 Week 15. Interface Programming 1 CALENDAR.
Annual Monitoring and Review & Mutual Review Quality Assurance Services.
Northern Ireland Practice and Education Council for Nursing and Midwifery Lesley Barrowman Barbara Bradley.
ININ 4017 Computer-Based Information Systems 1st Semester
Program Overview The College Community School District's Mentoring and Induction Program is designed to increase retention of promising beginning educators.
COMP 208/214/215/216 LECTURE 1 Introduction 恭喜發財.
Developing a programme of information literacy. Strategy Will you work at an institutional level? Will you work at a course level? Will you work at a.
OHT 16.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The objectives of training and certification The training and certification.
Test Organization and Management
MINISTRY OF ECONOMY AND FINANCE C.S.F M.A SPECIAL COORDINATION SERVICE FOR THE IMPLEMENTATION OF THE OPERATIONAL PROGRAMMES COMMUNITY SUPPORT.
Program Overview The College Community School District's Mentoring and Induction Program is designed to increase retention of promising beginning educators.
Foundation Degrees Foundation Degree Forward Lichfield Centre The Friary Lichfield Staffs WS13 6QG — Tel: Fax: —
Spring 2011 CIS 4911 Senior Project Catalog Description: Students work on faculty supervised projects in teams of up to 5 members to design and implement.
Project Title (as descriptive as possible) Group Members CPE495 Group ??? Computer Engineering Design I Electrical and Computer Engineering The University.
Introduction Mnge 460 Sr. Design Project ©Dr. B. C. Paul 2003.
© 2002 IBM Corporation 1 CSC3023 BIT Final Year Project Dr Barry McCollum 30 Jan 2011.
Database Administration COMSATS INSTITUTE OF INFORMATION TECHNOLOGY, VEHARI.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
1 Implementing A PMO & Enterprise Project Management at NIH February 3, 2005 Bill Vesey, PMP Manager EPM Consulting Practice Forte Systems, Inc General.
QA Methodology By Rajib Roy Independent Consultant Qcon.
1 WP 8 Quality Assurance TEMPUS BE-TEMPUS-SMHES Kick-off meeting – Tétouan, January 2014 Eva Reina, UNICA Project Manager.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Acceptance Test 04/25/2012 Presented By: ExoNET Solutions 1.
Mark Dixon 1 Tech – Introduction. Mark Dixon 2 Module Aims give you experience of: –The Software Development Lifecycle Analyse (of Problem / Application.
NMC Standards to Support Learning and Assessment in Practice Lesley Barrowman Senior Professional Officer NIPEC.
Client Ames Community School District Faculty Advisors Dr. John Lamont Prof. Ralph Patterson Dr. Gregory Smith Application Team Justin Brown Amy Joines.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
Workshop #1: Introduction to Graduation Project Wednesday September 2 nd at 10 am Capstone Committee Department of Computer Science.
K-12 Teaching Application Support and Software Ongo-08 Client Dr. John Lamont Prof. Ralph Patterson Advisor Dr. Gregory Smith Team Members Sean Boyle Tony.
An organizational structure is a mostly hierarchical concept of subordination of entities that collaborate and contribute to serve one common aim... Organizational.
Lecture 1: Introduction – Graduation Projects Topics to Discuss in Lectures 1. Project Deliverables 2. Course grading 3. Project Concept Writing.
My Learning Plan Enhancing the student portfolio experience.
CS6361 Project, Part 2 Fall 2006 The Design Firm of Bouchier, Fischer, Herschbach, & Nina.
Enhancing capacity in the Child & Youth sector through situated supported distance learning Building Capacity through a Participatory Institutional Assessment.
Personal Professional Development and Vocational Practice Professional Development Log BTEC Care Year Two.
Software Development Cycle and Roles in a Project Team
Programming Contest Scoreboard and Submission 1 Welcome Mr. Matthews and Dr. Vandenberg SEG Acceptance Test April 26th, 2005.
T Project Review Magnificent Seven Final demonstration
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
Chapter 8 – Administering Security  Security Planning  Risk Analysis  Security Policies  Physical Security.
1st Year Review [ M&E, Experience in Burkina Faso ] 1 Dr Victor NANA Programme Manager ACCESS-SMC Project Burkina Faso 19/1/16.
Understanding the Relationship between Administrator Evaluation and Data Teams “1-2-3 goal setting” Phase I: Whole School Learning Indicator (analyze data)
Specialties Description
COMP 208/214/215/216 Lecture 1 Introduction.
English Language Education Information Day May 2017
Dr Sally Priest, Flood Hazard Research Centre
Preparation for SER on Mechanical Engineering Study
Indian Head Elementary Charles County
Roles and Responsibilities (1/3)
Sample School Elementary Sample County
IAF Cross Frontier Policy
Institution Name.
Meeting the data and capacity challenge
Ashtabula Area City Schools
Our Process CMSC 345, Version 1/04.
Presentation transcript:

CSC3047 IT Enterprise Project Dr Darryl Stewart Dr Barry McCollum Dr Paul McMullan

IT Enterprise Project Individual Research Project 1st Semester Issues Development Project Teams Requirements Supervision Deliverables Final Report Assessment

Questions? 3

IT Enterprise Project Requirements Students Academics Administrators Academic Programme Managers

IT Enterprise Project Deliverables Group Presentation System Demonstration Final Report System

IT Enterprise Project Final Report Project Management Requirements Specification User Interface Design Database Design System Design Coding Standards and Convention Unit Implementation Quality Assurance Critical Evaluation

Supervision 7 Meetings with one of the Customers/Supervisors Dr Barry McCollum Dr Paul McMullan Questions Progress monitoring Meetings begin Tuesday 13th

ElementPercentageType 1.Group Presentation & System Demonstration 15%Group 2. Final Report & System Produced 30%Group 3. Development Diary15%Individual 8