Logistic and Intermodal Transport in Serbia Conference on Logistic Belgrade, 5 June
Task A: Market analysis and location selection (8 Working papers) – selection of location – traffic and market study Task B: Defining of the institutional framework and promoting the concept of terminal (7 Working papers) – institutional awareness – terminal concept defined – Workshops and Study tours Task C: Preliminary design, feasibility studies and preparation of tender dossier (4 Working papers, Preliminary design and Tender dossier) - design documentation and tender dossier - economic and financial analysis Project
Logistic chain
Traffic and market study Envisaged routes: 3 to 5 trains/week on relation with Rijeka (with antenna service to Koper) 2 trains/week to Bar 2 to 3 trains/week to Germany 2 to 3 trains/week to Italy 2 trains/week to Poland/Romania 2 trains/week to Montenegro 2 trains/week to Russia? 2-3 trains per day
Vrcin Pancevo Ada Huja Pancevacki Rit Zemun Batajnica Stara Pazova Surcin Dobanovci Makis Selection of location
Zemun Novi Sad
7 2 loading/unloading tracks truck loading lane handling area reach stacker temporary storage area Reverse track Loading tracks InboundOutbound 1010 m Terminal: I phase
Terminal: II phase II a 4 loading/unloading tracks gantry crane II b 4 loading/unloading tracks Gantry crane “drive trough” terminal
Phase 1UnitCosts Preliminary works € Terminal construction costs € Access roads costs € Railway connection costs € Investment costs € Planning and supervision costs (7%)7% € Contingencies (10%)10% € Total investment € Land expropriation costs (145 ha) € Total investment (including land costs) € Construction costs BIT (phase 1)
Input dataValues Analysis period20 years Discount rate5% GDP growth3% per year Output dataValues IRR13.21% NPV17.09 million € Results of CBA Basic case: 12 trains/week The investment is no longer economically justified for 7 trains/week!
Results of financial analysis – Business plan - Income statement is positive from % ROE - EU donation is essential to achieve this result - Minimum number of trains for financial justification is 8 trains/week!
Functional structure 2 functionally independent and separate entities are created under the public company structure 22 employees in Terminal Operator, 8 is Site Development Company
Future tasks Preparation of urban planning documentation for construction Application for IPA 2013 Creation of future logistics platform Attraction of logistic companies and investments Creating of new jobs
Cooperation MoIE and City of Belgrade have nominated Beoland as project investor Preliminary design was submitted to Investor by Consultants Investor will deal with all investor issues and land expropriation EU/IPA financing, budget of RS and City of Belgrade Framework and basic principles of cooperation for project implementation were defined Creation of public company (Republic of Serbia and City of Belgrade)
Future terminal and logistics zone Logistcs zone BIT
THANK YOU Miodrag Poledica Ministry of Infrastructure and Energy 011/