October 05, 2005D. Ferrère, RD05 Florence1 From the ATLAS SCT endcap module production to the commisionning D. Ferrère, University of Geneva in behalf.

Slides:



Advertisements
Similar presentations
Construction of the ATLAS SCT Endcap Modules Steve Snow Manchester University On behalf of the ATLAS SCT Collaboration Context - ATLAS, Inner Detector,
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
H.-G. Moser, Max-Planck-Institut für Physik, Munich1 Beauty03, October 2003 The Status of the ATLAS Inner Detector Hans-Günther Moser for the ATLAS Collaboration.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
Didier Ferrère, Geneva University Como, October The Construction Status of the ATLAS Silicon Microstrip Tracker D. Ferrère on behalf of the SCT.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
ATLAS SCT module performance: beam test results José E. García.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
The ATLAS SemiConductor Tracker Abstract The ATLAS SemiConductor Tracker (SCT) is presented. About silicon micro-strip sensors with a total active.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Endcap Module Status Agreed Responsibilities Overall Production UK Situation Global Schedule Issues General Production Issues.
The ATLAS Inner Detector Steve McMahon / RAL. Welcome to CERN Geneva Airport LHC accelerator CERN main site SPS accelerator CERN 2nd site It is your laboratory.
The ATLAS Silicon Microstrip Tracker
LHCb VErtex LOcator & Displaced Vertex Trigger
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Michał Dwużnik, for the SCT collaboration
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
The ATLAS Silicon Microstrip Tracker introduction system design sensors module design electronics hybrids construction integration Zdenek Dolezal, Charles.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Vertex ‘99, 6/21-25/1999 p. 1 CDF Run II SiliconAlan Sill, Texas Tech University CDF Run II Silicon Tracking Projects 8th INTERNATIONAL WORKSHOP ON VERTEX.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Precision Drift Chambers for the ATLAS Muon Spectrometer
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
J.R. Carter SCT Barrel Module PAR - Overview 1 14th May 2003 ATLAS SCT BARREL MODULE PAR COMPONENTS AND PRODUCTION OVERVIEW Janet Carter, Cambridge TOPICS:
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
Operation & Performance of the ATLAS SemiConductor Tracker Dr. Petra Haefner Max-Planck-Institut für Physik.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
Developing Radiation Hard Silicon for the Vertex Locator
Detector building Notes of our discussion
FCAL R&D towards a prototype of very compact calorimeter
Simulated vertex precision
Integration and alignment of ATLAS SCT
From the ATLAS SCT endcap module production to the commisionning
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
L H C A T L A S International Collaboration on the LHC Project
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Presentation transcript:

October 05, 2005D. Ferrère, RD05 Florence1 From the ATLAS SCT endcap module production to the commisionning D. Ferrère, University of Geneva in behalf of the ATLAS SCT collaboration Overview:  Introduction of SCT  The endcap modules and the specifications  The module production and logistics  Production results: yield and statistics  The endcap macro-assembly: status and results  The integration and commissioning

October 05, 2005D. Ferrère, RD05 Florence2 Atlas Experiment Barrel Electromagnetic Calorimeter Barrel Toroid Good tracking performances that are required for:  Secondary vertices  Impact parameters resolution  Track isolation  Measurement of high momentum particles Main physics motivation is the search for the Higgs boson, but not only given the large range of physics opportunities!

October 05, 2005D. Ferrère, RD05 Florence3 The SCT Semiconductor Tracker 4 barrels 5.6 m 1.04 m 1.53 m SCT is made of 4088 modules: ~ 61 m 2 of silicon 15,392 silicon wafers ~ 6.3 million of readout channels Endacp A: 9 wheels Endacp C: 9 wheels Layout was done such that 4 space points can be reconstructed

October 05, 2005D. Ferrère, RD05 Florence4 Endcap module types 1976 modules mounted on the 2 endcaps: 936 Outer Forward Modules 640 Middle Forward Modules (incl. 80 Short Middle) 400 Inner Forward Modules A module consists of 768 readout strips on each side with a constant angular pitch pointing towards the center of the wheel. Pitch between 70 to 90  m. Middle short

October 05, 2005D. Ferrère, RD05 Florence5 Expanded view of an outer module 2 detectors strip-chained and readout at one end by 6 binary chips (ABCD3T) on each side  768 readout strips per side. Clock, control and signal are transmitted optically. Detectors are mounted back to back with a 20 mrad stereo angle.

October 05, 2005D. Ferrère, RD05 Florence6 Module requirements Electrical specifications: (Based on a full set of digital/analog chip characterization + bias tests) Noise occupancy at 1 fC less than 5x10 -4 also related to the input noise Less than 1 % dead channels ( 15/1536 ) – From the response curve test Detector current less than 20  A at 350V per detector. Long Term Test (LTT) operation for hours cold: > thermistor on hottest part of hybrid at ~10 ºC > Chip and detector biases and currents should remain stable top side bottom side

October 05, 2005D. Ferrère, RD05 Florence7 Module requirements Mechanical specifications: XY alignment - 13 parameters defined but critical are – Front-to-back detector alignment: midYF within ± 5  m – Individual detector angles: a1 to a4 within ± 130 mrad – Mounting hole and slot alignment: mhx, mhy and msy within ± 20  m Z detector profile – 50 points are focused on the Si-detectors and per module side. None of them should exceed ± 115  m envelope. Chip and fanins must be assembled within a defined envelope to avoid clashes with neighbor modules The alignment and the profile must survive 10 thermal cycles between +35 ºC down to –30 ºC Ceramic mounting surface should be clear of cracks (very fragile part) 13 XY alignment parameters50 Z focus points for the module profile

October 05, 2005D. Ferrère, RD05 Florence8 Module production and endcap flow diagram Module Production and QA Cluster Complete Fanin production (CNM Barcelona) Spine Production (Protvino) Hybrids (Cicorel + Freiburg) Others: Washers, glue EndCap C macro-assembly Liverpool (UK) EndCap A macro-assembly Nikhef (NL) In progress... Hybrid QA Site Spine QA & rework (CERN) ID Installation CERN ATLAS pit May/June 2006 ID Integration Tests and cosmic run CERN SR1 January 2006March 2006 Si-Detectors (Hamamatsu & CiS) Cracow INP Freiburg Univ. CLRC, RAL Freiburg Univ. Geneva Univ.  CERN Manchester Univ.  Liverpool, Glasgow MPI, Munich  Prague Charles Univ, Prague Czech Tech. Univ. Melbourne  CERN Nikhef Valencia

October 05, 2005D. Ferrère, RD05 Florence9 Module assembly resources - 7 assembly sites in total involving 12 institutes or Universities - Up to 6 technicians/site (~3 FTE) for the module assembly - Up to ~8 physicists and PhD per site (~2 FTE) for the module QA - Component selection and reception tests ~2h - Alignment and assembly of detectors~2h + 24h glue curing - Detector current check and visual inspection~40min - Assembly with hybrids and fanins~1h h glue curing - Wire bonding~3h - Detector current check and visual inspection~15min - Metrology survey~30min - Thermal cycling~18h - Metrology survey~30min - Electrical characterization~2h30 - Long Term Test electrical characterization~24h - Inspection and packing for storage~20min From start to the end a module fabrication takes ~9 working days/module! In practice a module is issued after 3 to 4 weeks!

October 05, 2005D. Ferrère, RD05 Florence10 Module assembly procedure Detector alignment Assembly with spine Assembly with hybrid and fanins Wire bonding

October 05, 2005D. Ferrère, RD05 Florence11 Endcap module production Production Started in June 03 and completed in May-June 05 Total : 2377 Outer : 1106 Middle : 775 Inner : 496 Number of modules were made with a 20% contingency to allow up to 15% lost at the production sites and 5% at the macro-assembly sites. Max production rate: ~55 modules/week Outer : 94.7% MidL : 94.4% MidS : 88.3% Inner : 87.4% Average yield : 93.1% Front side of an outer module

October 05, 2005D. Ferrère, RD05 Florence12 Few illustrations of problems found – Part of the learning curve Si surface Teflon surface Detector scratches due to trapped debris into the teflon surface of the transfer plate. Module is out of detector current specs! Detector broken due to debris that was sticking on the backplane. This happened when sucking down on the miniature alignment stage. Module is broken! The spacer mounted on the spine was glued with an angle and clash during the assembly was unavoidable but impossible to anticipate. Module was aborted!

October 05, 2005D. Ferrère, RD05 Florence13 Electrical QA results Out of specs Good Out of specs

October 05, 2005D. Ferrère, RD05 Florence14 Mechanical QA results Good Pass midyF specification inside ± 5 microns mhy specification inside ± 20 microns Good Some stats on essential XY alignment parameters Stereo angle specification 20 ± 0.13 mrad. Defined between front and back detector axis. Good

October 05, 2005D. Ferrère, RD05 Florence15 Mechanical QA results Front and rear detector profile GoodPass ZminF Good

October 05, 2005D. Ferrère, RD05 Florence16 Endcap macro-assembly Disk 5A in Module to Disk stand at NIKHEF Liverpool: Endcap C & Nikhef: Endcap A 52 outer and 40 inner modules Front side 40 middle modules Rear side

October 05, 2005D. Ferrère, RD05 Florence17 Endcap C disk testing results (Liverpool) Outers: 1576e- Middles: 1529e- Inners: 1070e- Short Middles: 907e- Average Input noise on the complete endcap C Endcap A has similar results so far...

October 05, 2005D. Ferrère, RD05 Florence18 Endcap C disk Thermal study (Liverpool) T coolant = -22 ºC, T ambient = -8 ºC Average±RMS: Hybrid main point: ± 0.8 ºC Detector-end temp: ± 0.6 ºC (T. Jones)

October 05, 2005D. Ferrère, RD05 Florence19 Endcap status Endcap C (Liverpool): Module to disc completed and tested Discs 9 to 5 in cylinder FSI to mount on discs 1 to 4 Service to cylinder started: cooling, LMT, fibers, DCS Delivery to CERN in January 06 Endcap A (Nikhef): Module to disc completed from 9 to 5 Disks 9 to 7 in cylinder Disk 5 under test Modules to be mounted on disc 4 Services to discs on disc 1 & 3 to do Services to cylinder started: cooling, LMT, fibers, DCS Delivery to CERN in March 06 EC-C cylinder with discs 6 to 9 at Liverpool EC-A Disk 8A inserted into cylinder at Nikhef

October 05, 2005D. Ferrère, RD05 Florence20 Integration and commissioning at CERN SR1 1. The 2 ECs will arrive at CERN in January 06 and March Reception tests: visual inspection, leak test and electrical tests 3. Final SCT assembly 4. Integration with TRT 5. Combined tests SCT/TRT - 9 SCT discs will be tested together on 1 sector 6. Installation into the pit foreseen in May and June 06 Cantilever stand with 1 endcap TRT trolley in aligned position for the integration

October 05, 2005D. Ferrère, RD05 Florence21 Conclusions SCT is one of the largest Si-Tracker (~61 m2). A lot of expertise is essential from physicists, engineers and technicians in various fields such as: physics, mechanics, electronics, computing, thermodynamics,... Even with the strict requirements, a module yield as high as 93.1% was achieved modules have been built and 1976 will be used in SCT. The EC module production was a great success and experience in all the assembly sites: 7 sites involving 12 universities and institutes. Modules are completely mounted on discs for EC-C and half for EC- A and module performances are as expected! The macro-assembly, service assembly, integration and commissioning are on the way or about to start at Liverpool, Nikhef and at CERN. The installation into the pit is close: May 06 and June06.

October 05, 2005D. Ferrère, RD05 Florence22 Extra slides

October 05, 2005D. Ferrère, RD05 Florence23  23 overlapping interactions every bunch crossing (at the full Luminosity)  A bunch-bunch crossing every 25ns (40MHz)  Maximum equivalent 1 MeV neutron fluence after 10 years is ~ n/cm 2  Operating temperature on silicon detectors is -7 o C to contain the reverse annealing and the leakage current BUT the maintenance will likely require yearly warm-up of 2 days at 20 o C and 2 weeks at 17 o C  Operation in a 2 Tesla solenoid field  Material < 0.4 X 0 at the outer SCT envelope  SCT coverage up to  =2.5  More than 99% hit efficiency is required Running conditions and features

October 05, 2005D. Ferrère, RD05 Florence24 Module components Hybrid: - 6 copper-kapton layers laminated onto a carbon-carbon substrate - Equipped with 12 ABCT3T readout chips and opto-chips for clock/control and readout Detectors: - 5 detector types made in 4 inch wafers by 2 manufacturer (Hamamatsu and CiS) strips (1 st and last not readout) of 20 micron width with an average pitch of ~80  m Fanins: -Aluminum strips on glass used for electrical connection and thermal isolation between hybrid and detectors. Different sets for the 3 module types. - 4 items per module: 2 left and 2 rights Spine: -Made of TPG (Thermal Pyrolytic Graphite) for the excellent thermal conductivity and AlN ceramic pieces for the mechanical stiffness. All in one single item during the module assembly. Location pads: -very precise hole and slot made on an Aluminium washer and glue onto FR4 piece. The slot washer is glued on the spine and the hole is overlapping the hybrid and the spine.

October 05, 2005D. Ferrère, RD05 Florence25 SCT production Database Oracle DB (kernel 9i) Why? Traceability of the items, shipped items, assemblies and tests that had been made Most of the relevant test data and parameters were stored in structured way otherwise stored in raw data Useful GUI has been made either for upload or report thanks to: – Java applications for massive data upload – Web interfaces (SQL form) for individual data access or report – Java or other applications coupled with root display for statistics and reports Encourages auto-discipline. Data transparent to all the collaboration and DB entries were one of the requirements to be qualified for the module production.

October 05, 2005D. Ferrère, RD05 Florence26 Electrical QA results Long Term Test (LTT) After some stats decreased from 24h to 18h duration Very rare problems found with the modules (0.05%)! In principles problems are detected earlier during hybrid LTT.

October 05, 2005D. Ferrère, RD05 Florence27 Endcap macro-assembly