October 2006ICFA workshop, Cracow1 HEP grid computing in Portugal Jorge Gomes LIP Computer Centre Lisbon Laboratório de Instrumentação e Física Experimental.

Slides:



Advertisements
Similar presentations
CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001
Advertisements

Jorge Gasós Grid Technologies Unit European Commission The EU e Infrastructures Programme Workshop, Beijing, June 2005.
An open source approach for grids Bob Jones CERN EU DataGrid Project Deputy Project Leader EU EGEE Designated Technical Director
CBPF J. Magnin LAFEX-CBPF. Outline What is the GRID ? Why GRID at CBPF ? What are our needs ? Status of GRID at CBPF.
INFSO-RI Enabling Grids for E-sciencE The EGEE project Fabrizio Gagliardi Project Director EGEE CERN, Switzerland Research Infrastructures.
The Portuguese National Grid Initiative (INGRID) Jorge Gomes LIP Computing Division Lisbon Laboratório de Instrumentação e Física Experimental de Partículas.
E-science grid facility for Europe and Latin America SA1 - Status Report Grid Infrastructure Activity Diego Carvalho (SA1 Activity Manager)
Estonian Grid Mario Kadastik On behalf of Estonian Grid Tallinn, Jan '05.
Hungrid A Possible Distributed Computing Platform for Hungarian Fusion Research Szabolcs Hernáth MTA KFKI RMKI EFDA RP Workshop.
EGEE is proposed as a project funded by the European Union under contract IST The EGEE International Grid Infrastructure and the Digital Divide.
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 15 th April 2009 Visit of Spanish Royal Academy.
Overview of LCG-France Tier-2s and Tier-3s Frédérique Chollet (IN2P3-LAPP) on behalf of the LCG-France project and Tiers representatives CMS visit to Tier-1.
11 September 2007Milos Lokajicek Institute of Physics AS CR Prague Status of the GRID in the Czech Republic NEC’2007.
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2 report for LIP-Lisbon Gabriel Amoros on behalf of LIP-Lisbon J. Aparício, G. Barreira,
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Nov. 18, EGEE and gLite are registered trademarks EGEE-III, Regional, and National.
10 October 2006ICFA DDW'06, Cracow Milos Lokajicek, Prague 1 Current status and plans for Czech Grid for HEP.
4th EGEE Meeting, PISA October, 2005 E-Infraestructure shared between Europe and Latin America Jesús Casado, CIEMAT
UTA Site Report Jae Yu UTA Site Report 4 th DOSAR Workshop Iowa State University Apr. 5 – 6, 2007 Jae Yu Univ. of Texas, Arlington.
INFSO-RI Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
UTA Site Report Jae Yu UTA Site Report 2 nd DOSAR Workshop UTA Mar. 30 – Mar. 31, 2006 Jae Yu Univ. of Texas, Arlington.
From GEANT to Grid empowered Research Infrastructures ANTONELLA KARLSON DG INFSO Research Infrastructures Grids Information Day 25 March 2003 From GEANT.
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme The EU-IndiaGrid Project Joining.
IST E-infrastructure shared between Europe and Latin America High Energy Physics Applications in EELA Raquel Pezoa Universidad.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 25 th April 2012.
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America EELA Infrastructure (WP2) Roberto Barbera.
Ian Bird LHC Computing Grid Project Leader LHC Grid Fest 3 rd October 2008 A worldwide collaboration.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
A. Hoummada May Korea Moroccan ATLAS GRID MAGRID Abdeslam Hoummada University HASSAN II Ain Chock B.P Maarif CASABLANCA - MOROCCO National.
LIP workshop LIP Computing Overview Jorge Gomes Laboratório de Instrumentação e Física Experimental de Partículas.
SiGNET – Slovenian Production Grid Marko Mikuž Univ. Ljubljana & J. Stefan Institute on behalf of SiGNET team ICFA DDW’06 Kraków, 10 th October 2006.
1CHEP2000 February 2000F. Gagliardi EU HEP GRID Project Fabrizio Gagliardi
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks South-West Federation Gabriel Amorós (CSIC)
Computing at LIP Jorge Gomes LIP Laboratório de Instrumentação e Física Experimental de Partículas LIP Workshop 2008, Luso, 12 January 2008.
BalticGrid-II Project EGEE’09, Barcelona1 GRID infrastructure for astrophysical applications in Lithuania Gražina Tautvaišienė and Šarūnas Mikolaitis Institute.
7 September 2007 AEGIS 2007 Annual Assembly Current Status of Serbian eInfrastructure: AEGIS, SEE-GRID-2, EGEE-II Antun Balaz SCL, Institute of Physics,
, VilniusBaltic Grid1 EG Contribution to NEEGRID Martti Raidal On behalf of Estonian Grid.
Grid Activities in Portugal Gonçalo Borges Jornadas LIP 2010 Braga, Janeiro 2010.
PIC port d’informació científica EGEE – EGI Transition for WLCG in Spain M. Delfino, G. Merino, PIC Spanish Tier-1 WLCG CB 13-Nov-2009.
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
Dr. Isabel Campos Plasencia (IFCA-CSIC) Spanish NGI Coordinator ES-GRID The Spanish National Grid Initiative.
IAG – Israel Academic Grid, EGEE and HEP in Israel Prof. David Horn Tel Aviv University.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Portuguese Grid Infrastruture(s) Gonçalo Borges Jornadas LIP 2010 Braga, Janeiro 2010.
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
The Grid in Israel Presentation to the Athens meeting, April 06 David Horn Tel Aviv University.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
INFSO-RI Enabling Grids for E-sciencE Turkish Tier-2 Site Report Emrah AKKOYUN High Performance and Grid Computing Center TUBITAK-ULAKBIM.
November 28, 2007 Dominique Boutigny – CC-IN2P3 CC-IN2P3 Update Status.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
NDGF – a Joint Nordic Production Grid Lars Fischer ICFA Workshop on HEP Networking, Grid, and Digital Divide Issues for Global e-Science Cracow, 2 October.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
 Prospective Nationale sur les Grilles de Production, Paris, L'état d'avancement des grilles.
Grid Colombia Workshop with OSG Week 2 Startup Rob Gardner University of Chicago October 26, 2009.
Grid activities in Czech Republic Jiri Kosina Institute of Physics of the Academy of Sciences of the Czech Republic
Bob Jones EGEE Technical Director
e-infrastructures in Portugal
Christos Markou Institute of Nuclear Physics NCSR ‘Demokritos’
Grid related projects CERN openlab LCG EDG F.Fluckiger
Dagmar Adamova, NPI AS CR Prague/Rez
The INFN TIER1 Regional Centre
Gonçalo Borges on behalf of LIP
Peter Clarke EGEE Peter Clarke
Presentation transcript:

October 2006ICFA workshop, Cracow1 HEP grid computing in Portugal Jorge Gomes LIP Computer Centre Lisbon Laboratório de Instrumentação e Física Experimental de Partículas

October 2006ICFA workshop, Cracow2 HEP in Portugal LIP is a Portuguese High Energy Physics laboratory LIP is an associated laboratory funded by the Portuguese public funding agencies LIP has three centres: –Lisbon, Coimbra and Faro LIP participation in experiments includes: –Atlas, CMS, Compass, Auger, AMS, SNO, Zeplin, Hades, n-TOF, … Other activities include: –Building DAQ systems and detectors, detectors R&D, medical physics, grid computing, Geant4

October 2006ICFA workshop, Cracow3 Grid computing at LIP Centred on HEP: –WLCG support for ATLAS and CMS Participation in EU funded grid computing projects: –EGEE –EELA –int.eu.grid

October 2006ICFA workshop, Cracow4 LIP and EU grid projects LIP has been participating in EU grid projects since FP5 Since LIP is involved both in Atlas and CMS grid computing has become a priority Objective: –Obtain know-how needed to operate a grid infrastructure for Portuguese HEP users –Build a grid operations and support team –Build the national grid infrastructure for LHC –Provide support for the Portuguese HEP users –Establish links with other organizations

October 2006ICFA workshop, Cracow5 Grid computing - old projects LIP started as an unfunded collaborator in the DataGrid project: (April 2001 to March 2004) –First contacts with grid middleware –Creation of the LIP certification authority –Test of middleware CrossGrid: (March 2002 to February 2005) –Operations, middleware validation, integration, authentication and authorization, monitoring, support EGEE: (April 2004 to March 2006) –Operations, user and site support, test of middleware, core services, authentication, production cluster

October 2006ICFA workshop, Cracow6 Grid computing – current projects EELA: (started January 2006) –Extending grid computing to Latin America –Using EGEE middleware –LIP is the only Portuguese partner –Operations, authentication, authorization, virtual organizations, support, core services, CA deployment and coordination for Latin America EGEE-II: (started April 2006) –Production grid computing infrastructure –LIP is the only Portuguese partner –Operations, user and site support, global support, core services, authentication, pre-production, production cluster, dissemination, training, relations with scientific community, deployment coordination

October 2006ICFA workshop, Cracow7 Grid computing – current projects int.eu.grid: (started May 2006) –Focused on interactivity and MPI issues –Building on EGEE middleware –LIP is the only Portuguese partner –Operations, infrastructure management, authentication and authorization, support, middleware deployment coordination LIP is almost the only Portuguese organization involved in EU funded grid projects in Portugal. Other Portuguese organizations in this kind of projects are focused on middleware and grid technology development.

October 2006ICFA workshop, Cracow8 LIP Certification Authority Created during the DataGrid project Currently operated as a production service for the Portuguese Scientific community Issue certificates for grid computing without any cost for the subscribers Vital for the participation of Portuguese users and sites Registration authorities already in some Universities and institutes: –Uporto, UMinho, IST fusion, IEETA, UAL, Lusiada, LIP-Lisbon, LIP-Coimbra, FCT-UNL Recognized by IGTF CA upgrade funded during 2006 by the Ministry of Science (FCT)

October 2006ICFA workshop, Cracow9 LIP and WLCG Portugal is contributing to the WLCG effort by sending engineers to work for grid computing at CERN –7 engineers working at CERN funded by Portugal LIP supports both ATLAS and CMS VOs: –Enable LIP users to access the experiments computing resources and data –Contribute with computing and storage resources for the ATLAS and CMS VOs –Provide support for local users –Build and operate a tier 2

October 2006ICFA workshop, Cracow10 LIP and WLCG MoU voluntary additional contributions to the LCG deployment at CERN

October 2006ICFA workshop, Cracow11 Tier 2 Federated tier 2 with to centres: –Lisbon (ATLAS + CMS) –Coimbra (ATLAS) About 2/3 of the computing capacity will be deployed in Lisbon The tier 1 for the LIP federated tier 2 is PIC in Barcelona - Spain

October 2006ICFA workshop, Cracow12 Tier 2 - WLCG MoU ATLAS CPU (SSI2K) Disk (TB) WAN (Mbits/s)100 CMS CPU (SSI2K) Disk (TB) WAN (Mbits/s)100 Some values need to be revised: –Networking –Some 2006 expectations will not be fulfilled

October 2006ICFA workshop, Cracow13 Tier 2 status Lisbon –26 CPUs for ATLAS and CMS Xeon 2.8GHz and Opteron 2.2GHz –dcache based disk pool with 13 TB –Some more Opteron 2.2GHz CPUs being deployed until the end of the year –Actual tier-2 deployment foreseen for next year Coimbra –integrating a cluster for ATLAS ~ 100 CPUs Xeon 2.2GHz – Xeon 2.8GHz –Storage to be acquired –Site to become available until the end of the year –Upgrade foreseen for next year

October 2006ICFA workshop, Cracow14 Tier 2 status The LIP computer centre facilities in Lisbon were improved during 2006 –More space –More power –New UPS system –New cooling equipment –Raised floor –Network infrastructure partially improved Unfortunately the space available is still insufficient for a tier-2 –It must be shared with all LIP Computer Centre systems and with other experiments –Total area around 39 m 2 –Many old systems not rack mounted

October 2006ICFA workshop, Cracow15 Tier 2 status In Coimbra the Tier 2 will be housed at the University’s Computational Physics Centre –Agreement established with the University –CFC is being currently improved Power Cooling UPSs –Large computer room The agreement includes grid computing and the possibility of sharing resources from the CFC cluster –500 new Opteron CPUs

October 2006ICFA workshop, Cracow16 Network connectivity LIP federated tier 2 bandwidth: –Coimbra - 1Gb/s (shared with CFC) Already using proprietary fibre –Lisbon - still at 100Mbits/s Studying proprietary fibre link to connect to the NREN backbone –Network connectivity is still partially paid by the users 100Mbits/s in the current price list is 137, Euro + TVA –Commercial operators are dropping prices and a new NREN price list will become available soon.

October 2006ICFA workshop, Cracow17 Network connectivity NREN backbone is 10Gb/s –Uses proprietary dark fibre –Bough to the railway company Last mile is starting to be delivered at gigabit rates for some (few) Universities –Mostly using proprietary last mile links –Agreements with gas companies, underground etc.

October 2006ICFA workshop, Cracow18 Network connectivity Connectivity with Geant only 2.5Gb/s: –connection through Madrid –backup through London New proprietary fibre optic links will be established with Spain at North to Galicia (Tui or Caminha) and at South to Badajoz –Proprietary dark fibre until the Spanish border –These new fibres will be used to provide Geant connectivity through Spain and to share resources with Spanish centres –The call for the Badajoz link has been launched very recently –The link through the North is still pending

October 2006ICFA workshop, Cracow19 Human resources The Tier-2 will be operated by the LIP computer centre personnel from Lisbon and Coimbra Current personnel: –Lisbon Computer centre operations and support team 9 FTEs – 6 in grid computing –spread in several projects (LCG, EGEE, EELA, int.eu.grid) 2 FTEs – Physicists from ATLAS and CMS to interface with the experiments –Coimbra Computer centre system managers ~2 FTEs – 1 in grid computing (beginning)

October 2006ICFA workshop, Cracow20 National Grid Initiative NGI officially launched by the Ministry of Science in April Programme details and funding already defined The initiative will be based on projects –Strong focus on infrastructure projects –Also includes: R&D, pilot applications and training First Portuguese NGI workshop (INGRID’06) will take place on November 11 –Focused on internal organization –The way to proceed will be discussed there –Collaboration with Spain will be in the agenda

October 2006ICFA workshop, Cracow21 National Grid Initiative Call for projects will open still in Funding will become available in LIP will likely become deeply involved both at organizational and at the projects level. Funding for the tier 2 will come likely from an NGI project to be submitted. NGI funding for 2007 is 2.5 Million Euro