Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)

Slides:



Advertisements
Similar presentations
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 CMN Problem Review-Anthony AffolderTPO, December 11, 2003 Review of CMN Problem/Studies Ariella requested me to review the current understanding of the.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Electrical Testing at UCSB: Hybrids, Modules, & Rods Anthony Affolder On.
Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Update of US Testing Status
US Module Production Status
UCSB Testing Status Anthony Affolder
Review of CMN Problem/Studies
UCSB Short-term Testing Plan
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Hamburg Bonding Report
Results from module testing
UCSB Testing Status Anthony Affolder
US Module Production Quality
Recent TOB Developments
FNAL Module Testing Status
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Short-term Testing Plan
UCSB Qualification Module Grading
Hybrid & Module Electrical Testing
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
US Hybrid/Module/Rod Testing Model
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
Anthony Affolder UC Santa Barbara
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Current Module LT Testing Capability
Operations/Failure Analysis
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Is Increased Bias Current and CMN Correlated?
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Failures on Rods
US Module Testing Progress Report
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Presentation transcript:

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago) On behalf of the US testing group Outline Status of test equipment and manpower Testing capacity Recent test results  common mode noise  other failures Conclusions and outlook

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 2 Module Testing Cycle Wire bond (15)Module quick test (15) Storage/Mount on Rods Thermal cycle modules (15): 2 loads, 8 hours each Pinhole tests (15) Gantry makes modules (15) Rod testing will be covered in P.Tipton’s talk Expected peak production rate – 15 modules per day

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 3 Test equipment and capacity Fermilab Clean Room lab D  Adjacent to production area  Hybrid characterization and thermal cycling  Single module quick test 2 ARC test stations Clean Room lab C  Single module quick test 2 ARC test stations  Module burn-in station UCSB Clean Room  Adjacent to production area  Hybrid characterization and thermal cycling  Single module quick test 3 ARC test stations  Module burn-in station Total testing capacity per site: Hybrid  28/day (4hybrids per load  7 hours) Module Test ~24/day (1h/module  8h  3stands) LT Test ~20/day (10 modules per load  ½ day thermal cycles)

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 4 ManpowerManpower Fermilab professors – 2 postdocs - 2 graduate students – 1 exchange visitor - 1 engineer - 1 technicians – 3 Trained to run ARC:  2 technicians  1 engineer Trained to run LT:  1 grad student  1 exchange visitor  2 technicians UCSB professors – 2 postdocs - 3 graduate students - 2 electrical engineers - 1 mechanical engineers – 2 undergraduate students – 3 Trained to run ARC:  ? Trained to run LT:  ?  2

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 5 ARCS Based Test Stands Hybrid testing  Thermal cycle/pulsing Module testing  LED systems Pinhole/Open Tests  DEPP HV supply Automated IV curves  3 Module test stands at UCSB 2 TOB 1 TEC  4 Module test stands at Fermilab DEPP LED Controller ARC Controllers ARCS - APV Readout Controller Software Purpose - Fast testing of hybrids and modules LED System ARC FE And adaptor card

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 6 Module Testing with ARCS Module testing has matured greatly  A standard set of tests was defined  Fault finding algorithms are now tuned to maximize fault finding and fault type identification, while minimizing false bad channel flagging Testing procedures are now almost automated  Wo to automate testing  fault finding  module grading  database entry underway Noise performance and shielding standardization has allowed for the same fault finding algorithms to work on the TIB, TEC & TOB modules  Minimize the effects of external noise sources  All test stands are cross calibrated to identify the same faults Faults identified:  sensor-sensor opens;  sensor-PA opens;  mid-sensor opens;  pinholes;  noisy channels.

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 7 Fault Finding Using ARCS Noisy 1 sensor open 2 sensor open Pinholes Bad Channel Flags Noise Measurement Pulse Height Measurement (with Calibration Pulse) Bad Channel Flags Shorts Pinhole Opens

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 8 DAQ Based Test Stands DAQ system – a PC based prototype of the real CMS tracker readout chain Purpose – fast and burn-in testing of modules and rods Module Burn-in (Wien box) Same structure of root output as on ARCS Similar analysis macro is applied to LT data for fault finding

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 9 Recent Module Production Goals  To establish new peak production capacity (15 modules/day) Determine if testing capabilities sufficient  Build as many modules as possible using new ST sensors as agreed upon in December Use sensor grading scheme to find out if subclass of perfect sensors exists (A, A+, A++) Complete set of module tests made  ARCS quick test  Module thermal cycle (Vienna Box) 1 thermal cycle for each module (~7  10 hours)  LED test Results: USCB – 150, Fermilab – 102  Easily met testing capacity needs  Extremely low rate of introduced failures seen  CMN modules occurred at same rates as previous builds using re- probed sensors Did not appear to depend on production period or sensor grading

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 10 UCSB Module Quality/Grading 117 modules tested so far Failure rates/sources (excluding CMN modules)  0.39% Bad channels on average 0.26% Known bad sensor channels 0.13% Unmarked bad sensor channels 0.004% open hybrid-APV bonds 0.001% module bonding 0.002% testing errors  Less than 0.01% bad channels introduced during assembly/bonding/testing Module Grading  5 Grade B All due to sensor faults  7 Grade A/F 6 CMN modules 1 after thermal cycle 1 module fails to operate at -20 C Tested in 3 different Vienna box slots  2 Grade C/F 12 mid-sensor opens in aluminum strips (lithographic error) 1 CMN module

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 11 FNAL Module Quality/Grading

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 12 Thermal Cycling Results Thermal Cycling Results UCSB: 101 modules thermal cycled  One module does not function at -20 C Tested in 3 different cold box slots Hybrid bonded and thermal- cycled at UCSB without seeing this effect  One module developed CMN Prior to thermal cycling, the channel had 10 ADC noise Now consistently has CMN  One module have a single APV channel burn-out  Multiple noisy channels (2-5 ADC) appeared and disappeared after cycling Fermilab:

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 13 CMN modules and sensor grading Sensors graded using Vienna rules  All sensors were re-probed prior to assembly  Worst sensor grading out of two measurements used Sensors sub-divided into three time periods  Prior to Week 39, 2002 (Pre-production)  Week 39, 2002-Week 12, 2003 (Production improvements being implemented)  Week 13, 2003-now (Final Production) 7 Common mode modules found (6% of production)  Same rate as seen previously with re-probed sensors  1 after thermal cycling No statistically significant difference rate in CMN modules for the different sensor grading Sensor Grade NUMBERCMN%NUMBERCMN%NUMBERCMN% GRADE A % %1200.0% GRADE A3825.3%1119.1%1616.3% GRADE B000.0%6116.6%100.0%

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 14 New CMN Module IV Curves After Thermal Cycle

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 15 CMN Module Bias Current A large fraction (7/23) of CMN noise modules show a less than 5  A current increase relative to the sensor QTC expectations! 4 of the modules built with re-probed bad sensors with >10 mA increase in bias current

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 16 Module Time Degradation- Module 689 After 3 months on shelf, module retested Second chip now has a high noise channel which causes common mode noise  Channel previously only had a slightly higher noise (0.3 ADC)

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 17 After assembly module was tested (09/08) on ARCS at 400 V and graded “B” (6 faulty channels). No problems observe. After sitting on shelf for more than 3 months, module re-tested. A new pinhole is found Module Time Degradation-705 After LT, one chip shows CMN

Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 18 ConclusionsConclusions Testing infrastructure is ready for the large scale module production Testing facilities have trained personal and with sufficient experience 252 TOB modules were produced and fully tested in US in 2004 Ability to test at peak production rate of 15/day demonstrated for ~2 week period  Modules have excellent quality BUT CMN modules are still being produced at the ~5% rate!!!!