P16415: Human Powered Centrifuge Amanda Johnson Nathan Corr Pieter Werner Joanna Jayawickrema Laura Pratt.

Slides:



Advertisements
Similar presentations
Corner Rounder Capstone Team Melissa Anders Andrew Dillon Joshua Schmidt Matt Kirtley Team Members: Faculty Advisor: Huafen Hu.
Advertisements

BRIAN CHURCH ANTHONY SALMIN TYLER BREITUNG ROSS BLUTH MICHAEL OPLINGER STEPHEN MROZ P15318: Gaseous Mass Flow Rate Controller Week 3 Problem Definition.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Automatic Home Medication Dispenser Project # P07009 Team Guide - Dr. Daniel Phillips Project Sponsor - Dr. Michel Berg Team Members Alan StrandburgChris.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Overview P09503 – Electrophotographic Development and Transfer Station David Schwartz – ISE (Team Lead) Ruth Gay – ME Phillip Lopez – ME.
MSD-II Project Review Modular Motion Tracking Sensors 1.
P07007: Adapted Home Entry Sponsor: National Science Foundation Wenbo Chen Project Manager, EE Tanvir Rasel EE Meklet Kidane EE Faculty Mentors: Dr. Elizabeth.
Project Management Tools Utilized in Tech Transfers Morning Session #1 Robert Beall, PMP.
RIT Robotics Platform Laurie Underhill David Gomez Matt Dwyer Joseph Ho Joe KrisherRick Frisicano Design Project Management Team.
P14311: PCB Isolation Routing System Problem Definition Review.
Course Code: SW-SFTY.  Sizewise Rentals is committed to working with our employees to provide a safe work place.  It is our policy that employees should.
Background Cooper Crouse-Hinds Industries is a leader in the manufacturing of luminaires, an encased lighting system, for hazardous locations. These luminaires.
Christopher Barrett (ME) Daniel Graves (ME). Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems Primary Customer: ○ Currently.
Underwater Robotic Fish Week 3 Review Presentation Project #15029 Multidisciplinary Senior Design Rochester Institute of Technology Phase II: Buoyancy.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Motorized Pediatric Stander P15045 Sarah Hill Jon Greene Candice Matthews Courtney Getman Chris Wendel Peter Sevich George Day Snug Seat Rabbit Product.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Motor Assisted Wheelchair Design Review 09/10/15.
P15550: Customized Personal Protection Headwear Chris CasellaChristian Blank Tiffany GundlerNate Marshall Kayla WheelerScott Quenville.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
SPX Data Acquisition PROBLEM DEFINITION REVIEW John Dong David Haller Adam Johnson Thomas Klaben Luke Kranz.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
Automated Microfluidic Cell Separator
Team P15441 Mini Air Daniel Probst Usama Haq Nathan Serfass Joshua Erbland Alexander Cornell 2/10/15P
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
P15051: Robotic Eye Project Definition Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
P16104 Microfluidic Spectroscopy for Proteins within CubeSats.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
Magnetically Levitated Propeller Bernie Garcia (Me, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachory Louison.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Automated Microfluidic Cell Separator Project Group:
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
Orientation and Competency Assessment of Contract Employees, Students, Volunteers and Travelers Randy Benson WHS Healthcare Quality Service May 19, 2015.
Project Agenda Intro Problem Background Problem Statement and Deliverables Stakeholders Use Scenarios Prioritized List of Needs Engineering Requirements.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
P16512 – 3D Printing Ink Development Test Rig
P17415 Battery Powered Centrifuge Edge Site:
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Turbomachinery Flow Visualization P08453
Multidisciplinary Senior Design I: Problem Definition Review
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
Right Move, Right Place, Right Time
Lucrecia Johnson MSW, LSW Mary Bartlett MSW, LISW-S
P15073: Autonomous IV Stand Michael Binger, Caitlin Conway, Nick Goddard, Nicholas Jacobs, Christina Pysher, & Ethan Whritenor Mike September 11, 2014.
P07021: Instrument to Detect Thromboemboli
P17082 Biomechanical Elbow Model Final Presentation
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
P16702: ABVI Fabric Shredding Process and Facility Design
Breadfruit Flour Grinder
P10457: D-R Process Improvement
Project Readiness Review P10029 – Air Muscle Artificial Limb
Tub Lift Rev. 2 Dom Group
Heart Pump and the Circulatory System P17080
Final Project Plan P09004 – Eye Movement Tracking Device
Project
Team P16228: Magnetically Levitated Propeller
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
Presentation transcript:

P16415: Human Powered Centrifuge Amanda Johnson Nathan Corr Pieter Werner Joanna Jayawickrema Laura Pratt

Project Background Haiti Outreach: Pwoje Espwa is seeking a portable centrifuge Sustainable Organic Integrated Livelihoods (S.O.I.L.) also looking Needs to be usable in remote locations Medical tests Compost samples * Image taken from: Tabletop_centrifuge.jpg Tabletop_centrifuge.jpg * Image taken from: ybird/4bucketwhirlybird01.gif ybird/4bucketwhirlybird01.gif

Problem Statement Lack of electricity No vehicular access *Image found at farm__haiti_by_strandin.jpg

Project Deliverables Prototype Engineering Design Process Documented Technical Paper Poster Test results

Stakeholders Lab technicians Doctors Local people of Haiti Members of H.O.P.E Workers at water treatment facilities Government workers RIT faculty MSD students Image came from: a.akamaihd.net/hprofile-ak-frc3/v/t1.0- 1/c /556225_ _ _n.jpg?oh=e6ec6bc8e253376fefe9d7010a936fcd& oe=563ABFA4&__gda__= _db43e49c151 db95d497f98e6909b6b97https://fbcdn-profile- a.akamaihd.net/hprofile-ak-frc3/v/t1.0- 1/c /556225_ _ _n.jpg?oh=e6ec6bc8e253376fefe9d7010a936fcd& oe=563ABFA4&__gda__= _db43e49c151 db95d497f98e6909b6b97

Use Scenarios

Customer Requirements

Engineering Requirements

House of Quality Insight Main takeaway at this stage: All Customer Requirements have been addressed in the Engineering Requirements

Benchmarking Image came from: content/blogs.dir/1/files/2014/11/Jack-Albert-Trew- centrifuge11-537x357.jpghttp://assets.inhabitat.com/wp- content/blogs.dir/1/files/2014/11/Jack-Albert-Trew- centrifuge11-537x357.jpg Image came from: oknew/SaladSpinner.jpg oknew/SaladSpinner.jpg Image came from: ages/centrifugewhirlybird/4bucket whirlybird01.gif ages/centrifugewhirlybird/4bucket whirlybird01.gif Image came from: nnovation/new_emerging_tech_6.pdf nnovation/new_emerging_tech_6.pdf

Risk Management Technical Imbalanced wells could cause vibration, wear and tear, and ultimately failure Insufficient RPM would yield inaccurate results Safety Piece of equipment could fly off while rotating Test tube could come loose while operating, causing sample contact with human skin Resources 3D printing resources could not be readily available Staying within budget Environmental/Social Device malfunction could result in incorrect diagnosis and possible infection Improper disposal of samples could result in biological waste hazards

Draft of Project Plan Objectives: Deliver a working prototype centrifuge which: Does not require electricity Is under 50 lbs Is adjustable for different tests and test tubes Compile a manual Gather together a lab kit: Initial Test tubes Microscope Recommended Next Steps (if needed)

Next 3 Weeks Finish Research--Monday 9/14 Finalize Customer and Engineering Requirements--Tuesday 9/15 Begin Concept Generation--Wednesday 9/16 Begin Concept Evaluation--Tuesday 9/22 Select Final Overall Concept--Wednesday 9/23 Conduct Thorough Risk Analysis of Chosen Concept--Thursday 9/24 Determine Methods to Mitigate or Eliminate these risks--Monday 9/28 Consolidate Resultant Design into a Presentation--Tuesday 9/29 Present Current Concept and its risks--Thursday 10/1