Advaned Planning and Scheduling J.Skorkovský, KPH.

Slides:



Advertisements
Similar presentations
CONWIP (A pull alternative to kanban principle)
Advertisements

Strategic Decisions (Part II)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
1 Advanced Planning & Scheduling Presentation. CUSTOMERSCUSTOMERS SUPPLIERSSUPPLIERS PURCHASING PRODUCTION PLANNING CUSTOMER SERVICE FINANCE Acknowledge-
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Chapter 8 Aggregate Planning in a Supply Chain
LESSON 8: AGGREGATE PLANNING
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution Instructor: Richard W. Vawter.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.
Production Scheduling: What Tool is Right for You?
© Prentice Hall, 2005: Enterprise Resource Planning, 1 st Edition by Mary Sumner 6-1 Enterprise Resource Planning, 1 st Edition by Mary Sumner Chapter.
MGMT Materials Management Systems Master Production Scheduling Chapter 3.
Operations Scheduling. Scheduling in a Process-Focused Environment.
FLEXIBLE MANUFACTURING SYSTEMS. FLEXIBLE MANUFACTURING SYSTEMS MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS.
1 ISE 195 Fundamentals of Industrial & Systems Engineering.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Collaboration among sales, production, planning, purchasing, maintenance and management to positively impact the bottom line.
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Manufacturing Systems
Business Policy & Strategy: Chapter Nine Production Murdick, Moor, Babson & Tomlinson Sixth Edition, 2000.
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk E2-201 Information Systems.
1 © The Delos Partnership 2003 Supply Chain Techniques Getting the plan executed.
Activity Scheduling and Control
1 Office Space Requirements 2 Universal Axioms Manufacturing managers in large companies tend to overestimate their individual cell or departmental space.
DP Johnson, 2005 Dealing with Production Bottlenecks Mini-case Be Sure To Review Notes Area And Related Word Document Forward to Instructors.
Procurement in Industrial Management BPT3133
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
6-1 Manufacturing Systems ERP Background Designed to re-order inventory using re-order point –Adapts production to customer orders –Increased flexibility,
SchedulingProducingControllingSchedulingProducingControlling.
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Material Requirements Planning
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Bin Contents Bin Contents Pallets Lot Batch Lot Batch SKU SALES Customer Contract Contract Order New product ENGINEERING BMP/Routine Process BOM Partlist.
Sales and Operations Planning
Enterprise Resource Planning, 1st Edition by Mary Sumner
AXUG Partner Showcase – Introducing Preactor
Tour - session 8 Detailed Scheduling
Inventory Fundamentals
Facility Inventory Old Facilities Modern Facilities Classroom Size
COMPUTER INTEGRATED MANUFACTURING
Introduction to Materials Management
Operations an exploration of basic manufacturing operations, forecasting, budgeting and control.
Performance Measures, Capacity Planning & Scheduling
Andrew Good, Liberty Grove Software
Chapter 7 Capacity Planning and Management
Production Activity Control
Manufacturing Planning and Control
Reserved for Intro Picture
Material Requirements Planning (MRP)
Introduction to Materials Management
Enterprise Resource Planning, 1st Edition by Mary Sumner
Chapter 14 Dependent Demand
Operations an exploration of basic manufacturing operations, forecasting, budgeting and control.
Manufacturing Planning and Control
Aggregate Production Planning (APP)
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Master Production Scheduling (MPS)
Inventory Fundamentals
Presentation transcript:

Advaned Planning and Scheduling J.Skorkovský, KPH

Critical manufacturing problems Machine breakdown –lack of capacity Components (from BOM) are not available in time Sudden changes in orders and priorities Late deliveries due to manufacturing delays Missed sales due to exceeding capacities Lost orders due to excessive WIP (Work in Progress) High cost of delays due to long setup times Difficult planning based on forecast (fluctuation of demand) Overtime due to bad utilization of resources Changeover operations are to often and too laborious

Planning scenario Demand Forecast Maintained System System Objectives Constraints Space Budget Resources Plan

Very simple production 4 machines : C1, C2 and W1,W2 ( C=Cutting, W=Welding ) C1 can be used for cutting P1 or P2 and not vice versa ( C2 can cut only P2) W1 and W2 can be used for both lines (fully alternate resources) Raw material (items P1..P10) 1 product P11(P1..P10) using 2 lines (routings) Workers 6 operations : –Cutting –Welding –Lacquering (2 colours - one colours for P7-> P9 and P8->P10) –Labels –Final assembly –Packaging

Bill of material P3 P2P1 P4 P5 P6 P7 P8 P9 P10 P11

Shop floor situation Cutting 1 Cutting 2 Welding 1 Welding 2 Lacquering Labeling P9 Labeling P10 Final assemblyPackaging P1 P2 P5 P6 P3 P4 P7 P8 P9 P10 P10 and P9 P11

Shop floor situation after (3 orders) Cutting 1 Cutting 2 Welding 1 Welding 2 Lacquering Labeling P9 Labeling P10 Final assemblyPackaging P1 P2 P5 P6 P3 P4 P7 P8 P9 P10 P9 and P10 P11

Shop floor situation- problems Cutting 1 Cutting 2 Welding 1 Welding 2 Lacquering Labeling P9 Labeling P10 Final assemblyPackaging P1 P2 P5 P6 P3 P4 P7 P8 P9 P10 P9 and P10 P11 Label worker : absence from work Machine breakdown Welding bottleneck Setup time problem machine was setup for coloring P7 Material shortage- awaiting labeled P10

Shop floor situation APS rescheduling Cutting 1 Cutting 2 Welding 1 Welding 2 Lacquering Labeling P9 Labeling P10 Final assemblyPackaging P1 P2 P5 P6 P3 P4 P7 P8 P9 P10 P9 and P10 P11 Work order (P2->P4) moved to C1, some of 3 orders moved from W1 to free W2 (see green remark) Lacquering setup changed to color P8 firstly due to bottleneck, one WO (P3,P5->P7) moved to W2 to decrease impact of bottleneck, re-schedule workers for Labeling in order to cover lack of capacity of labeling P10.

Scheduling criteira (PlannerOne)

Bottlenecks analysis (PlannerOne)

Working Orders/Product-Gantt and delays