CCCC-FHDI Engineering Co., Ltd.

Slides:



Advertisements
Similar presentations
Container Ship Construction
Advertisements

The Duqm Port and Industrial Zone Presentation to the Chamber of Commerce in cooperation with Duqm Development Committee Muscat, 24 May 2011.
«SOUTHEAST EUROPEAN INTERMODALITY»
ICTT Vallarpadam First Trans-shipment terminal in India.
Port of Duqm Company profile
1 Damietta Container & Cargo Handling Co. DCHC General overview January, 2012.
Development of the port of Poti by strategic investor in the post-crisis world by Andrii Kuzmenko Poti Sea Port Corp. – an APM Terminals company.
DIALOG Jubail Supply Base
Ocean Lighretage Services Pvt. Ltd.
CONTAINER TERMINAL FSC Container Terminal FSC Company Presentation December 2010.
1 Date of Incident: 16 January 2007 Time: 1400 Location: Port Hueneme (Berth 3 & 4) Vessel: MV Madame Butterfly IMO: Flag: SINGAPORE – SG Call.
Limited Liability Company 2011 june. 1 Description of the location 2 Main characteristics 3 Capacity and technological process 4 Services 5 Prospects.
2.3. Ship loader layout Ship loader Bucket wheel Reclaimer
Restrictions LOA244 m Draught11 m Air Draught18 m.
Enhancing Port Operations Efficiency Maritime Knowledge Shipping Session 7 - Bulk Cargo Terminals, 24 September 2008 Stuti Nautiyal SimPlus Pte. Ltd.
A Study on Future Multipurpose Vessel for the Northern Baltic Sea Golam Mortuja LAIVA 2025 Espoo.
1. Dev. of Marine Liquid Terminal Facilities consisting of two berths 300m, each on North side of existing Jetty and a SPM in KPT waters at OOT Vadinar.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
BY: ASHLEY WILLIAMS Jeep Compass. Overview 2010 Jeep Compass  starts at $15, 365 Four wheel drive Seats five comfortably Built in GPS Plenty of storage.
PORT OF SANTOS Sao Paulo / Brazil. Location LATITUDE: 23º57’ 3’’ S LONGITUDE: 46º18’ 6’’ W Time Zone: (UTC -03:00) Brasilia.
Assets Ship in Service Training Material A-M CHAUVEL 2009.
PRESENTATION AT AFRICAN PORTS & MARITIME CONFERENCE PRESENTATION AT AFRICAN PORTS & MARITIME CONFERENCE SWAKOPMUND HOTEL AND ENTERTAINMENT CENTRE SWAKOPMUND,
1 REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT SEA PORTS CORPORATION 7th PAPC Conference 2008,PMAESA Council & IAPH Africa-Europe Group MEETING
Port of Montreal. General Informations Port of Montreal is a Seaport located in the St. Lawrence River, in the city of Montreal, Canada. It’s situated.
Maritime Security An Introduction Michael McNicholas.
2 Pearl River Delta & Nansha Guangzhou Huangpu Xintang Dongguan Lianhuashan Taiping Nansha Panyu Zhaoqing Gaoyao Foshan Lanshi RongqiBeijiao Chiwan Shekou.
PUBLIC WORKSHOP STATEWIDE DIESEL ENGINE IDLE REDUCTION STANDARD August 23, 2007 Department of Environmental Protection Division of Air Resource Management.
Study Abroad in Panama July 2013 THE UNIVERSITY OF SOUTHERN MISSISSIPPI Center for Logistics, Trade and Transportation And College of Business Study Abroad.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
NON SEA WATER BALLAST BUNKER TANKER INVENTED & DESIGNED BY XED
DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects.
 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.
Presentation of investment projects of Kherson Sea Port.
Investment Project Construction of corn transloading terminal in the port Yuzhny.
James Denton-Brown Industrial & Ports Practice Leader Bechtel Civil-San Francisco 1 Khalifa Port and Khalifa Industrial Zone-Abu Dhabi Middle East Case.
Sedimentary Rocks Chapter 3 Section 3. Sedimentary  sedimentum Latin for ‘settling’ Rock formed from compressed or cemented layers (DEPOSITS) of sediment.
«UKRAINIAN SEA PORTS AUTHORITY» SKADOVSK SEA PORT AUTHORITY
Worldwide Small Port Survey and Analysis. Why? Initially, to determine the optimum TSV characteristics  Limited area  Data collection confined to TSV.
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
Welcome To!.
Proposal for Upfront Tariff Fixation for Re- Development of Berth Nos. 8, 9 and Barge Berths.
Propeller Club, Port of Basel
Djibouti Ports – DP World Jérôme Martins Oliveira
Vicon subsoiler - Terra PL Product Information 2013.
Port Authority of Guam PB International PORT EXPANSION PLAN.
2  THE COUNTRY  ROAD TRANSPORT SYSTEM  AIR TRANSPORT SYSTEM  RAILWAYS SYSTEM  PORT LOCATION  PORT OF LUANDA  PORT OF LOBITO  PORT OF NAMIBE 
Add: Gieng Day – Halong city – Quang Ninh province * Tel: * Fax: * Tel: * Fax:
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
Infrastructure and Shipping in Taiwan
1 Web Search What are coral reefs? How are they formed? 2 Image Search Find a map that shows the areas of the world where coral reefs can be found.
Prof.V.M.Mohamed Ali.  Is a facility where cargo containers are transhipped.  The transshipment may be between container ships and land vehicles. 
Super Ultra Large Container Vessel Operations in the Port of NY/NJ
PORT AND HARBOR ENGINEERING
Marine Kit – 2 Ship Construction
Updated Design of Detector Hall
Ship Disaster Investigation
Presented by: Ing Michael N’dolenje
Marine Port and Service Market Report : Trends, Forecast and Competitive Analysis 1.
Port of Durban: Medium Term Layout
CARGO SHIPS Vito Šimat 2.c.
RORO?.
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Design stages and design spiral
Density = mass of rock/volume (kg/m 3 ) ρ= M t /V t Unit weight of solids =weight of dry rock/true volume (kN/ m 3 ) γs= W d /V s Relative density = density.
INDUSTRIAL COMPLEX & PECEM PORT. INDUSTRIAL COMPLEX & PECEM PORT.
Operational Container General Cargo Dry Bulk Ferry Cruise
Benchmark Review Day 5 4 March 16
Introduction: Aden Container Terminal is the largest container terminal in Yemen and currently operated by the Aden Ports Development company (APDC). The.
Presentation transcript:

CCCC-FHDI Engineering Co., Ltd. RENEW OF BERTH 1 TO 11, PORT SUDAN CCCC-FHDI Engineering Co., Ltd.

Content 1. Existing Berth 1 - 11 2. Problem 3. General Layout 4. Handling Technology 5. Marine Structures

1. Existing Berth 1 to 11

Berth 11(98m) Berth 8 to 9(375m) Berth 6 to 7(365m) Berth 1 to 5A(825m) Existing Berth 1 to 11

Section of present terminal

Problem of existing berths Water depth is not enough for berthing large vessel Water area is not enough for berthing large vessel Handling process need update In order to raise the port throughput ,the above problem shall be consider by renew project.

2. Problem

3. General Layout

Phase I : Berth 1 to 5A Phase II : Berth 6 to 7 The renewed old berths : Phase I : Berth 1 to 5A Phase II : Berth 6 to 7 Phase III: Berth 8 , 9 and 11 Two options of General Layout are consider for the renew project.

Option I of General Layout

(1) Phase I Item Description Quay line 824m Berth 1 30,000 DWT Grain Three 30,000 DWT General Cargo Berthing area 56m,-12.0 Turning basin 563m×362m, -12.60

(2) Phase II Item Description Quay line 386m Berth 5,6 20,000 DWT General Cargo Berthing area 50m,-11.2 Turning basin 563m×362m, -11.70

(3)Phase III Item Description Quay line 375m+202 Berth 7,8 15,000 DWT General Cargo Berth 9 10,000 DWT bulk cement Berthing area 46m(45m),-10.7(-9.8) Turning basin 563m×362m, -11.2 (-10.3)

(2)Option II of General Layout

Option II of General Layout the Option I Berth 8 to 11 Berth 8 to 11 the Option II

(3)Phase III Item Description Quay line 375m+202 Berth 7,8 15,000 DWT General Cargo Berth 9 10,000 DWT bulk cement Berthing area 46m(45m),-10.7(-9.8) Turning basin 563m×362m, -11.2 (-10.3)

4. Handling Technology

Option of special-purpose grain of Berth 1 14.00 Option of special-purpose grain of Berth 1

Handling Process of Bulk Cargo Bulk Cargo Vessel→ Rear storehouse: Bulk Cargo Vessel→16t unloading Gantry crane with Belt →Terminal Front、Trestle Belt→Rear Belt→Rear storehouse

Option of General Cargo terminal of Berth 2 to 8 14.00 Option of General Cargo terminal of Berth 2 to 8

Handling Process of General cargo General Cargo Vessel←→Storage Area General Cargo Vessel←→ 16t General crane ←→Traction Flatbed←→Handling Equipment in Rear Storage Area ←→Rear Storage Area

5.Marine Structures

Geological Condition Residual Soil of Coral Reef Limestone Moderately Weathered (MW) Coral Reef Limestone Completely Weathered (CW) Coral Reef Limestone Highly Weathered (HW) Coral Reef Limestone Residual Soil of Coral Reef Limestone Moderately Weathered (MW) Coral Reef Limestone

Transverse beam Cast-in-situ Crane Beam Φ1100mm Option 1 of multi-purpose terminal of Berth 1 - 8 (bent spacing 5.0m, gauge 14m )

Transverse beam Cast-in-situ Crane Beam Φ1300mm Option 2 of multi-purpose terminal of Berth 1 - 8 (bent spacing 7.0m, gauge 14m )

Thank You!