Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang Mittig MSU-NSCL NSCL 12 th July 2014 For the organizing committee
Click to edit Master title style Facts FRIB is under construction Low energy (~10MeV/n) re-accelerated beams are an important part of the program
Click to edit Master title style Reaccelerated Beams Program Do we need a spectrometer? why, for what physics? W. Nazarewicz, draft of whitepaper what physics cannot be done without a spectrometer? how we can improve the draft of the whitepaper? what type of spectrometer do we agree with the recommendation of the preparatory writing workshop?
Click to edit Master title style Recent work Questionnaire: Writing workshop June excel file of proposals draft of the whitepaper recommendation These documents were attached to the mail to the today’s workshop registered participants
Click to edit Master title style Context and Goal FRIB with re-acceleration will be completed in 2022 construct a spectrometer needs 5 years = = 3 years for the project approved/funded Texas A&M, Aug Long Range Plan (LRP) for nuclear physics Goal: present at the LECM a well documented scientific and technical project that can be endorsed by the community: white paper + recommendation