Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway.

Slides:



Advertisements
Similar presentations
1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
Advertisements

Journey Management Nigel DAth Journey Manager Bay of Plenty RTIM Seminar 18 March 2014.
Bringing the Voice of the Consumer Into Your Supply Chain Jake Barr Director, Consumer Driven Supply Network Global Mfg, Planning & Logistics The Procter.
© Copyright Custell Pty Ltd The Relationship Lifeblood: Leverage the Relationship Improve Intimacy Create Value Reduce cost Partnering for.
Stakeholder meeting on the SHIFT²RAIL Strategic Master Plan Manuel Pereira, IST Lisbon ERRAC Vice Chairman 20 th June 2014, Brussels 1.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 7 Engineering Overview.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
1 Strategy for risk based health and safety regulation Richard Price IRSC Conference.
Driving superior return on marketing investment. CMOs have been under the gun to prove the value of their marketing programs Top CMO Challenges Advertising.
Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
RSA – Accenture Insurance Solution
The changing world of Network Rail Simon Kirby, Managing Director Infrastructure Projects.
Railway Industry Association 25 March 2010 The Railway Supply Industry: Where Next? Jeremy Candfield Director General.
Gavin W. Roser Secretary General European Freight & Logistics Leaders Forum Brussels 6 th December /08/20151www.freightandlogistics.eu.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
An Overview of Our Regulatory Proposal
The Clapham Omnibus is Full………….. Challenges to our Transport System Neil Ridley Chief Business Development Officer.
The Great Transport Debate The Rail Network Michael Roberts Chief Executive, ATOC.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
Value for money 0 Rail Value for Money Study Railway Study Association 7 March 2012 Sir Roy McNulty Chair, RVfM Study.
Carstairs S&C Sustainability Renewals & Enhancement Sean Malone Network Rail.
Australian Water Summit Sydney March 2006 Is privatisation of water infrastructure and services the answer? Phillip Mills Director of Water Services, Water.
BT Transformation Working with the CWU. Defend Traditional Calls decline - 5 main factors Dial IP - Market declines, driven by Broadband Price - Market.
1 Delivering a 21 st century railway Anna Walker, Chair, ORR National Rail Conference: Cracking the Capacity Problem, 5 July 2012.
GB Electricity Market Reform: The implementation challenges ahead IAEE International Conference Stockholm, June 20 – Dorcas Batstone
State Highways M&O Journey March 2014 Update Mark Kinvig - NZ Transport Agency.
Estate Performance Measurement System (The Value For Money Model)
Vp plc Preliminary Results Year Ended 31 March 2005.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
IT Governance: COBIT, ISO17799 & ITIL. Introduction COBIT ITIL ISO17799Others.
EFRTC General Meeting INNOTRACK – Optimising the Supply Chain Summary of Success-Critical Areas Munich, 6 th June, 2008.
© 2010 IBM Corporation Business Analytics software Business Analytics Editable Text Editable Text Editable Text.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
An introduction to smart investment solutions: the case of PPP Twinning project Public Agency for Rail Transport of Republic Slovenia Daniel Loschacoff.
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
© OECD/IEA 2011 Energy Efficiency in Central Asia: Challenges and Opportunities VII KAZENERGY EURASIAN FORUM World in Transition Shaping Sustainable Energy.
High Output Track Renewals A Lean Yellow Railway Journey Ben Brooks, Project Director October 2015.
“South East Europe Alliance for Railway Innovation” (SEESARI)
European Structural and Investment Funds Breakfast Briefing 4 th February 2015 Simon Nokes – Deputy Chief Executive, New Economy.
Cisco Confidential 1 © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Small Business Advantage The Easy Path to Greater Profitability Selling.
Powering Network Rail with the Oracle Business Intelligence Platform
RAILROAD Association at 7 th Zimbabwe Mining and Infrastructure Indaba 2015 RRA CEO: GG Zimba.
An Overview of the Smart Metering Programme in GB.
Enterprise & Environment Directorate TRANSPORT FOR REGIONAL GROWTH 5 NOVEMBER 2015 Keith Winter, Executive Director, Enterprise and Environment, Fife Council.
Introduction to Factory Thinking Andy Fielding, Costain.
WELCOME AND INTRODUCTION BIM and BEYOND – THE DIGITISED RAILWAY David Philp Global Director BIM and MIC Consultancy and Chair, SFT BIM Delivery Group Aecom.
Leading health & safety on Britain’s railway A strategy for working together Presented by.
Connect and Share: to help us all to meet the future funding and efficiency challenge John Hobbs Director of Business, Environment and Community.
What Intelligent Mobility means for the rail industry Richard Jones, Rail Business Director Transport Systems Catapult UK.
Innovation and Supplier Engagement Steve Yianni. 2 £5.2bn Transformation must deliver £4.1bn CP4 OUTPUTS what we need to deliver Saving money.
Provisional view of the Procurement Strategy Phil Bennett Commercial Director.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Analysing the Case for Change Joe Lennard | Digital Railway Funding Lead Suppliers’ Summer Conference 15/07/2015.
Programme Update since April 2015 Martin Arter | Digital Railway Development Director Suppliers’ Summer Conference 15/07/2015.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
R EHABILITATION OF R AILWAY T RANSPORT IN C ENTRAL AND E ASTERN E UROPE I NTRODUCTION
The National Skills Academy for Rail (NSAR) Neil Robertson - CEO.
Delivering through an Integrated Alliance Dale Evans Alliance Director.
March 2016 Helen Smith Freight in the City Greater Manchester Logistics & Environment.
INSERT TITLE HERE.
Future Rail and Road developments
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
Network Rail Infrastructure Limited Interim Results 2006/07 1 April – 30 September November 2006.
Delivering Capital Investment to meet Priority Objectives
KEYNOTE STAGE SPONSOR.
Rail Safety Summit Work Staging and Planning
Operational Excellence - Transforming our operations
Presentation transcript:

Simon Kirby Director, Infrastructure Investment

Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway infrastructure in 2002 A maintenance contract structure with little incentive for efficiencyA maintenance contract structure with little incentive for efficiency 4,000 mile backlog in renewals4,000 mile backlog in renewals Regional structure, no central controlRegional structure, no central control An explosion in costs from £3.3bn per year in 1999 to £6bn a year in 2002An explosion in costs from £3.3bn per year in 1999 to £6bn a year in 2002

Track replacement volumes (miles)

Key challenges SafetySafety –Reduce incidents of broken rails, SPADs, Accidents, etc… PerformancePerformance –Reduce delays by around 33% over next 5 years CostCost –Improve efficiency by around 31% over next 5 years Work volumesWork volumes –Massively increase volume of work being delivered

And on a growing railway… 2000/ / / / / /06 Passenger Journeys (m) Passenger Journeys

Growth in Renewals – 07/08 £m ,000 1,500 2,000 2,500 04/05 actual05/06 actual06/07 actual +23% +22%

TrackCivilsSignallingEstatesE&PTelecoms £m 05/06 actual 06/07 actual +5% +17% +54% +30% +59% +55% Increased spend by asset in 06/07

Growth in Renewals – 07/08 £m ,000 1,500 2,000 2,500 04/05 actual05/06 actual06/07 actual +23% +22% 07/08 budget +10%

Enhancement spend Millions (£) past spend future spend

Track renewals

Improvement in efficiencies 26% 24% 10% 20% 0% 5% 10% 15% 20% 25% 30% Controllable Opex MaintenancePlain LineS&C 22% Projects

Our response National functional structureNational functional structure Maintenance in-houseMaintenance in-house GRIPGRIP Reorganising Track Renewals internallyReorganising Track Renewals internally Focus on costs, quality and timelinessFocus on costs, quality and timeliness Improving programme managementImproving programme management

Track renewals: current position Consistent improvement Track QualityConsistent improvement Track Quality Delay minutes reduced year on yearDelay minutes reduced year on year Good S&C performanceGood S&C performance Improving Plain Line DeliveryImproving Plain Line Delivery Plain Line costs improving but still not fast enoughPlain Line costs improving but still not fast enough

Track renewals: 2007 activities Fundamentally overhaul the whole renewals end to end processFundamentally overhaul the whole renewals end to end process Reward best 4 of 6 performing contractors through competitionReward best 4 of 6 performing contractors through competition Create efficient delivery methods for short duration possessionsCreate efficient delivery methods for short duration possessions

Supplier rationalisation By the autumn we plan to down select the best 4 contractors (from 6) 4 Territory based renewals Contractors and 1 National high output contractor We will review the allocation of work to optimise delivery method and agent We will manage against key indicators and drive for collaborative and integrated working

End-to-end process improvement Accelerating engineering specifications Plan is to create a 3 year rolling renewal programme Whole process from maintenance through track engineering, planning and track renewals is being mapped & optimised Behavioural change and training programme being developed

Target Improvement Circa 22% to 25% 31% Target Current position Post-changes

Conventional Renewals

Conventional renewals Structured reviews of: – –engineering specifications to deliver optimised worksite packaging – –resource planning to increase efficiency – –mapping resource availability to demand Greater involvement in contractor management using performance indicators Higher-level cross industry cooperation

High Output Machinery

Continued development of High Output systems (e.g. SLW) Potential acquisitions of additional plant Deployment of medium output solutions being progressed (e.g. MOBCs and Slinger)

Modular turnouts

Developing a systems solution to delivering S&C Standard products, factory built and modular delivered on bespoke wagons Lean manufacturing techniques in manufacturing and installation Through life benefits – quality, reduced maintenance, installed monitoring Will progressively replace conventional techniques – up to 75%

Modular turnouts Controlled build Delivered in-gauge Modular installation (on flat bed)

Conventional Renewals 54 hours Today! 37 hours Basic process changes & disciplines: incentivised, templated, site presence 27 hours Bearer Splice – road delivery / out of gauge 21 hours, or 2 x 12 hours Modular assembly, tilting wagon delivery, improved excavation, ballast laying 8 hours Consistent mid-week possessions 7 Day Railway 6 Day Railway

Conventional Renewals Money / time 27 hrs 54hrs 12 hrs 8 hrs 37 hrs Core possession time Process Splice Wagons & Assembly Manufacture +? £477k/ point end £443k £406k Sub £350k Best ‘UK’ Class Equivalent Best European Class (today) World Leader GB (today)

8 hour plain line

Concept study completed to explore principles and prove and clarify the remit Key objectives include: – –Standard unit of delivery – –Installation less than 8 hrs – –Single line working – –High line speed opening (85mph+) Full programme by mid-2007 Progressive introduction from 2009 anticipated Will moderate, or reverse, efficiency aspirations

Simon Kirby Director, Infrastructure Investment