Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion.

Slides:



Advertisements
Similar presentations
BMC Medical Co., Ltd. Nov Training Course. 1 Table of Contents 1. CATALOGUE 2. INSTALL& DISASSEMBLE 3. SET UP.
Advertisements

Operation of the FW-720 Unit 1. Side 1 2 Inlet Hand Crank.
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Safe Use and Operation of Vacuum Lines
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Engineer Training Maintenance TJ8300 / TJ8500 Maintenance.
Experiment 8 : Minor Losses
Open valve 1 so that the flow is from the reservoir to the pump head. Close Valve 4 so flow is stopped. Make sure Valve 2 is open to vent.
Zero-Referencing of Water Level Sensors and Gages #1 source of systematic errors in flume measurements Important at small flows because even small errors.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
Engineer Training Machine Calibration TJ8300 / TJ8500 Machine Calibration.
Engineer Training TN 59 Ink Management Solution TJ8300 / TJ8500 TN 59 Ink Management Solution Machine 75 and Above.
Engineer Training Troubleshooting Theory TJ8300 / TJ8500 Troubleshooting Theory.
LSRII Troubleshooting Tips
Experiment (4) Flow Measurement
AccuMax Single Point Injection Operation (See Installation and Operation Manual for detailed instructions)
Engineer Training Drum and Grippers TJ8300 / TJ8500 Drum and Grippers.
Engineer Training Troubleshooting TJ8300 / TJ8500 Troubleshooting.
AUTOMATIC SPRINKLERS.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
AccuMax Multi-Point Injection Mechanics
TP4-ENERSOL-TD/PV double function
AIR COMPRESSORS & STEAM CLEANERS. Pressurized air is produced by an air compressor. Air compressors are used daily in automotive shops. They are used.
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Engineer Training Bridge System TJ8300 / TJ8500 Bridge System.
Engineer Training Startup/Shutdown Procedures TJ8300 / TJ8500 Startup/Shutdown Procedures.
Engineer Training Machine New Features TJ8300 / TJ8500 Machine New Features.
Water Supply Skill Drills.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
TrueSTEAM™ Humidification Systems Module 7: Maintenance and Service.
Engineer Training RTRun – Real Time Software TJ8300 / TJ8500 RTRun – Real Time Software.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
ComColor Ink passage Mechanism (Revised version)
Engineer Training Checking the Motor’s Rotation Direction TJ8300 / TJ8500 Checking the Motor’s Rotation Direction.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
ABL-14d Able Elective Engines Instructors: George Crowl.
Automotive Fuel and Emissions Control Systems 3/e By James D. Halderman Copyright © 2012, 2009, 2006 Pearson Education, Inc., Upper Saddle River, NJ
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
2K AIRMIX® PU2160 FLOWMAX® PU2160 Flowmax ® Technology for Total Reliability.
Ships Service Air System
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
AfterSalesTraining Welcome to AfterSalesTraining.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
Epson printers have permanent built-in print head which allows to use a very high quality print head. It seems like its modern printers are far better.
Safe Use of Schlenk and Vacuum Lines
14 Refrigerant Recovery, Recycling, and Recharging.
AUTOMATIC SPRINKLERS.
Module 3 Domestic Heating/MMA Welding
Figure 18.1 Typical port fuel-injection system, indicating the location of various components. Notice that the fuel pressure regulator is located on.
SB Packing Automatic Downpuller Power Unit
Troubleshooting 11/14/2018 Water King Service Seminar.
“Lesson – Installing Material Cartridge and Printing a File”
Addition of MCRS low pressure fuel pump pressure relief valve for QSK38/50/60 Kelle Ravn May 20th 2015 (Changed “check valve” in May 18th version to “pressure.
Presentation transcript:

Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 2 General  Ink is first inserted after the TJ8300 has been fully assembled and all the electrical and mechanical components have been tested (for example: motor movement checking, bridge heating, etc).  The insertion is performed at the customer site, after flushing the solvent (highly recommended).  By default, the TJ8300 is flushed with solvent.

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 3 Gentle Flushing of the Ink System 1.Fill all of the six 5-liter containers with solvent. 2.From the RtRun application, select Tools > Color box > Prime > I/O; the Color Box I/O dialog box appears. 3.Select sensors of all colors.

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 4 Gentle Flushing of the Ink System (Cont.) 4.Open the ink bar valves to allow the solvent to flow into the waste bath. 5.Wait until you see a clear solvent flow and the hose becomes more transparent. 6.Close the ink bar valves. 7.From the RtRun application, select Tools > Color box > Prime > I/O; the Color Box I/O dialog box appears. 8.Select B valves of all colors.

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 5 Gentle Flushing of the Ink System (Cont.) 9.Press PA of all colors for 1-2 minutes until all manifolds are flushed and verify that the solvent is coming out of the heads. 10.Repeat the above step a few times.  From the main tank drain the Air equalizer tube (from ink bars) from solvent. Air equalizer tube

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 6 Inserting the Ink 1.Open all ink bars to drain all solvent leftovers. 2.Fill all of the six 5-liter containers with ink. 3.From the RtRun application, select Tools > Color box > Prime > I/O; the Color Box I/O dialog box appears. 4.Select sensors of all colors. 5.Wait until the A-tank is filled with ink and verify by checking the ink level.

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 7 Inserting the Ink (Cont.) 6.Open the ink bar valves to allow the solvent and ink to flow into the waste bath. 7.Wait until you see pure ink flowing out. 8.Close the ink bar valves. 9.From the RtRun application, select Tools > Color box > Prime > I/O; the Color Box I/O dialog box appears. 10.Select B valves of all colors.

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 8 Inserting the Ink (Cont.) 11.Open the lower draining pipes of the manifolds to allow the ink to flow in and fill them. 12.Drain ink from the lower drainage tube until ink flows without any air bubbles. 13.Perform the LPAP procedure, several times, until there is a clean flow of ink without any air bubbles. Lower Drainage Tubes

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 9 Preparing a New Inkjet Head Before mounting a new inkjet head on the system:  Check the IJ head on the cleaning station, electrically and mechanically.  Verify that all nozzles are open.  Verify that all nozzles are shooting straight (at least 1" from the orifice plate).

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 10 Preparing a New Inkjet Head (Cont.) Inkjet head in the cleaning unit bracket When inkjet head is clogged, it is cleaned using the cleaning unit.

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 11 Mounting an Inkjet Head Mounting an inkjet head is performed when replacing an existing inkjet head with a new one or when the inkjet head needs to be cleaned. Head’s O-ring I.J Heads

Engineer Training Ink Insertion TJ8300 / TJ8500 Confidential 12 Removing an Inkjet Head Removing an inkjet head is performed when replacing an existing inkjet head with a new one, or when the inkjet head needs to be cleaned.