KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for building field WP3: PRODUCT DESIGN AND VALIDATION ACA.

Slides:



Advertisements
Similar presentations
Pilot and market replication projects
Advertisements

Building Methods 2 Research & Evaluate. Assessment 2 Part A (p.15) RESEARCH MATERIALS AND METHODS FOR STRUCTURAL ELEMENTS AND RECORD FINDINGS FOR A WIDE.
Objective: Develop plans for kitchen cabinets.
Process Intensification Methodologies Applied to Liquid-Liquid Systems in Structured Equipment An EU Framework 7 NMP project The research leading to these.
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Rhode Island DEM’s Workplan Reporting Project EPA Innovations Conference Denver, Colorado January 2006 Thomas D. Getz -Presenter Kien Harris – IT Project.
24 Month MEETING - Tirana, 01 October 2013 EcoPlasBrick – Innovative recycled plastic based panels for building field ACA ALBANIAN CONSTRUCTION ASSOCATION.
30 Month MEETING - Madrid, 06 February 2014 EcoPlasBrick – Innovative recycled plastic based panels for building field ACA ALBANIAN CONSTRUCTION ASSOCATION.
Task 3.4. Validation of horizontal solutions Fire and mechanical characterization.
KC-002 Describe sustainability issues related to natural resource extraction and consumption. VP-009 Be willing to consider the implications of personal.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
ΑΝΝΕΧ 11-A by SCIRO. WP7 Dissemination and Implementation The objectives are the following: to build consensus around F-MAN To set-up the basis for further.
EcoPlasBrick Innovative recycled plastic based panels for building field AGREEMENT NUMBER: ECO/10/277233/SI KICK-OFF MEETING Brindisi, 21 July.
KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP2 Industrialization activities Development of an automated production system Start-up of a new.
30 Months Meeting – Madrid, February 6th, Months Meeting - Madrid, February 6 th, 2014 AGREEMENT NUMBER: ECO/10/ EcoPlasBrick Innovative.
Jamil Ibrahim Establishment Building Integration Thermal Collector BITC By Engineer Khaled Jazzar WEBCO sarl June 2014.
24 Months Meeting – Tirane, October 1 st, Months Meeting - Tirane, October 1 st, 2013 AGREEMENT NUMBER: ECO/10/ EcoPlasBrick Innovative recycled.
Objectives of NatVent This seven nation pan European project aims to reduce primary energy consumption (and consequently CO2 emissions) in office type.
EcoPlasBrick 36M MEETING - Venezia 19th June 2014 EcoPlasBrick Innovative recycled plastic based panels for building field Final MEETING Venezia, 19 June.
World Congress and Expo on Recycling
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
20th-21th October CRUE 2nd Common Call Kick Off Meeting Decentralised Integrated Analysis and Enhancement of Awareness through Collaborative Modelling.
Task 4.1 – Requirements analysis for Eco-Label and Environmental Product Declaration Duration: month 1 to month 36 Partners involved: CONSORZIO TRE (WP.
1 Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Task Order Competition (TOC) Process.
Institute for Economic Forecasting Lucian-Liviu Albu Raluca Polimeni Radu Lupu.
1 National Research Council - Pisa - Italy Marco Conti Italian National Research Council (CNR) IIT Institute Executive board meeting 2nd MobileMAN Workshop.
“Development of an advanced, innovative energy autonomous system for the treatment of brine produced from desalination plants” LIFE09 ENV/GR/ “ Water.
1 José A. Turégano UofZ/ Head of GEE RENAISSANCE ZARAGOZA.
WP3: BAL hardware-objectives 3.1. Production bioreactors (laboratory & full scale) 3.2. Validation safety upscaled bioreactors 3.3. Evaluation sterilization.
KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based.
2009/ 2010 Linus Wang MBA, MSc (Int’l Constr Mgmt), B Eng (Civil) Diploma in Construction Management Diploma in Quantity.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
6 Months Meeting – Napoli, 31 January Months Meeting Napoli, 31 January 2012 AGREEMENT NUMBER: ECO/10/ EcoPlasBrick Innovative recycled plastic.
Eurocode 1: Actions on structures – Part 1–2: General actions – Actions on structures exposed to fire Part of the One Stop Shop program Annex F (informative)
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
National Research Council - Pisa - Italy Marco Conti Italian National Research Council (CNR) IIT Institute MobileMAN MobileMAN: II year expected results.
Work Package 6 L2C Kick-off meeting Fontainebleau, March 7th 2006.
Task 2.2 – Identification of most suitable face-sheets and optimization of panel properties Duration: month 1 to month 12 Partners involved: MOTULAB (WP.
KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick T5.1 – Market Analysis and roadmapping Assess the European construction market for the introduction.
Title of your Study Your Name Date of your defense.
Leonardo da Vinci BLENDED LEARNING TRANSFER Rationalising, Learning and Transferring the use of technological platforms to enterprise-based learning strategies.
GRAPHIC STANDARDS. LETTERING CAPITAL letters only Consistency (Neat) Three sizes 3/8” FOR TITLE BLOCK 1/4” FOR TITLES WITHIN DRAWING 1/8” FOR CABINET.
Guidelines of the teamwork (Seminar) BK50A2700 Selection Criteria of Structural Materials.
Ing. Šimon Kovář, Ph.D. Ing. Jan Valtera, Ph.D. Ing. Petr Žabka, Ph.D. Ing. Josef Skřivánek Term project.
Mobile and Flexible Industrial Processing of Biomass, MOBILE FLIP
What ill be talking about!  CIP  USB 3.0  Google Voice.
Project Proposal Doucument Project Title 2015 APEC e-Learning Training Program Name of Presenter Date, 2015.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
PHOTOVOLTAIC VENTILATED FAÇADES
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
PRESENTATION attached to the application for participation in the Competitive Selection dated_____________________ Innovation Project: […] Entity: […]
DISSEMINATION MEETING HEAT4U PROJECT Gas Absorption Heat Pump solution for existing residential buildings Luigi Tischer, Project Coordinator HEAT4U PROJECT.
HISER-project WP4 – case studies Task 4.3 Subtask Eric van Roekel (STRUK) General Assembly Orleans 18 and 19 February 2016.
Session 1: Identifying Construction Drawings and Drawing Components.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
FISSAC Project Françoise Bonnet Secretary General, ACR+
The research on usage parameters of wooden buildings
EuCARD2 WP11 Topical Meeting
BESTFACADE, Åke Blomsterberg,
EuCARD2 WP11 Topical Meeting
Title Subtitle Name / institution Date / Location Logo
A New Circular Economy Concept
ENabling SafE Multi-Brand Platooning for Europe
Title Subtitle Name / institution Date / Location Logo
Acronym of the project: BUILD UP Skills ENERGOTRAIN
KICK-OFF Overview and thematic approach 19th of June 2017
Objective: Develop plans for kitchen cabinets.
Technical Communication
Presentation transcript:

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for building field WP3: PRODUCT DESIGN AND VALIDATION ACA

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP3: Product design and validation Work Package Description 1.Vertical solutions (ventilated façades, self-standing walls) The main objective of the WP3 is the design of different solutions and applications of the panels as environmentally friendly construction components. ACTIVITIES 2. Horizontal solutions (raised floors)

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick TASKS 3.1. Design of vertical solutions 3.2. Validation of vertical solutions WP3: Product design and validation Work package no:3Start date:MONTH 12End date:MONTH 36 Work package title PRODUCT DESIGN AND VALIDATION Partner Number Partner Shortname CETMATREPANDORAMOTULABACCIONAACA Task Participation Technical support Work Package Description TRE ACCIONA 3.3. Design of horizontal solutions 3.4. Validation of horizontal solutions 3.5. Technical-commercial schedules

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP3: Product design and validation Task 3.1 “Design of vertical solutions” Task 3.3 “Design of horizontal solutions” Tasks Description Defining the optimal size of the panels for different applications Optimization of panel properties T 2.2 Product Design T 3.1, T 3.3 Production of panels T 3.2, T 3.4 Validation T 3.2, T 3.4 TRE ACCIONA WP2WP3 (TRE) TRE ACCIONA MOTULAB

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Tasks Description WP3: Product design and validation Task 3.2 “Validation of vertical solutions” Task 3.4 “Validation of horizontal solutions” Testing the mechanical and thermal/fire properties of full scale elements Mechanical Properties Thermal and Fire properties Validation T 3.2, T 3.4 Manufacture and Test of full scale Elements for different solutions TRE ACCIONA WP3 WP6 Dissemination Activities (ACA)

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP3: Product design and validation Tasks Description Task 3.5 “Technical-commercial schedules” Description of applications, technical data, environmental and economic aspects, etc. Test results T 3.2, T 3.4 Technical-commercial Schedules T 3.5 ACCIONA WP3 (TRE, ACCIONA) Environmental Compatibility analysis WP4 (CETMA, TRE, MOTULAB)

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Steps: Design 1.Design of the panels: optimal dimensions for different applications. Production 2.Production of the panels. Manufacture 3.Manufacture of full scale elements. Validation 4.Validation: testing the mechanical and thermal/fire properties, depending on the application. Evaluation 5.Evaluation of the results. Analysis of the advantages and disadvantages of the different designs to select the best option for each application. Description 6.Description of technical-commercial schedules for each product. WP3: Product design and validation Methodology

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP3 Product design and validation TASK IIIIVIIIIIIIVIIIIIIIVIII TASK 3.1 D 3.1 TASK 3.2 D D TASK 3.3 D 3.3 TASK 3.4 D D TASK 3.5D 3.5 Planning DELIVERABLEDELIVERABLE NAME DELIVERY DATE PARTNERS INVOLVED D 3.1Design of vertical solutionsMonth 18TRE D D Validation of vertical solutions Full scale example of vertical solution for demonstration purposes Month 30 Month 36TRE D 3.3Design of horizontal solutionsMonth 18ACCIONA D D Validation of horizontal solutions Full scale example of horizontal solution for demonstration purposes Month 30 Month 36ACCIONA D 3.5Technical-commercial schedulesMonth 36ACCIONA

KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for building field WP3: PRODUCT DESIGN AND VALIDATION ACA