Tariff in Incentive is calculated as per CERC order 26.09.2000 Methodology All elements are grouped into following catagories 1.AC Transmission lines =

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
NERC Footnote b / 12 – Load Loss
Sharing of ISTS Charges & Losses Regulation
Understanding Electrical TransmissionDemonstration D1 A Guide to the National Grid Transmission Model Demonstration D1 Power losses in transmission.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Goshen Area Bus Reconfiguration
ERPC, Kolkata.  Definition and Concepts  Standards and regulation for TTC calculation  Calculation of TTC  Challenges in calculation of TTC  Way.
2014 System Operator Conference 1 Protection System Misoperations: Why Should a System Operator Give a Hoot? April 17 & May 1, 2014 – Charlotte, NC September.
INTRODUCTION OF ULTRA-HIGH VOLTAGE (UHV) 1000 kV AC TRANSFORMER
Brief on HVDC 2015 Brief on HVDC 2015
High Voltage Engineering
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
LINKS SURVIVAL POWER AUX POWER VOLTAGE LIMITS LINE CHARGE MVAR LINE
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
Potential Economic Benefits of Configuring Superconducting Technologies in the Florida Grid EUCAS 2003 supported by the US Office of Naval Research Tim.
BRIEF ON THE REPORT OF CIGRE WG B4-45 –
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Transmission System in India
Module on Computation of PoC Transmission Charges
Pallatana-Bongaigaon Transmission System. 2 Generation Project Summary  Pallatana (726.6 MW): being implemented by OTPC –Unit - 1 : Dec-2011 –Unit -
ELG4125 Transmission and Distribution Systems
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
1 Grid standards PSTI Bangalore Short title and commencement and application These are CEA (Grid standards) Regulations, 2010 They come into.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Lecture 32Electro Mechanical System1 Synchronous Reactance  The value of X S can be determined by measurements of the open-circuit and short-circuit tests.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Sharing of Inter-State Transmission Losses 11/29/
بسم الله الرحمن الرحيم سبحانك لا علم لنا إلا ما علمتنا.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
POWER HOUSE.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Overall National Grid Development: Constraints & Options
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
Department of Electrical Engineering
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
Submitted To:- Submitted By:- Mr.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
FRCC System Restoration 2016 FRCC System Operator Seminar.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Southern Regional Power Committee Central Electricity Authority.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
BANGALORE TRANSMISSION PLANNING
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
HVDC TRANSMISSION Under Guidance Dr. Shahnaz Ayub Er.Kamini Prajapati Submitted By Mayank Kumar
Transmission Losses Physical System Operations. Transmission Losses NERC’s definition(s): Electric System Losses Total electric energy losses in the electric.
COMPARISION OF PJM AND INDIAN GRID. PJMINDIAN GRID.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Management Of Tulkarm Electrical Network
A presentation on Measurement of Winding Resistance and Insulation Resistance of 3 Phase 11 kV/ 433 V, 16KVA Oil cooled type Transformer PRESENTED BY:
ECEN 460 Power System Operation and Control
Strategic planning for Nablus power system
POWER SYSTEM PLANNING AND DESIGN. TITLE : DESIGN OF EHV TRANSMISSION LINES & BUNDELED CONDUCTORS IN EHV LINES. PREPARED BY : JOBIN ABRAHAM.
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Transformer Impedance
TONBRIDGE POWER GREEN LINE
Presentation transcript:

Tariff in Incentive is calculated as per CERC order Methodology All elements are grouped into following catagories 1.AC Transmission lines = AVo 2.ICTs= AVq 3.Switched Bus Reactors = AVs 4.HVDC lines =AVp 5.HVDC back to back =AVt 6.SVC=AVr

Availability of each category is calculated based on the Weightage Factor,Total hours under consideration and non available hours for each element of that category. ° ° Availability of o No of AC lines = Σ Wi(Ti-Tnai)/ Σ Wi = AVo i=1 i=1 Where Wi = Weightage factor for ith transmission line Ti = Total hours of ith AC line Tnai= Total non availability hours for ith AC line Wi = Surge Impedance loading * Circuit Kms For inter regional lines, 50% of the weighted factor is taken for each region. For HVDC pole – The Rated MW capacity * circuit km

For ICT - The rated MVA capacity For switched bus reactor – The rated MVAR capacity For HVDC back to Back connecting two regions – 50 % of the Rated MW capacity of each block to each region. Overall Availability of Region % System Availability : o*AVo + p*AVp+q*AVq+r*AVr+s*AVs+t*AVt * 100 o + p+q+r+s+t

FACTORS INFLUENCE THE SYSTEM AVAILABILITY 1.Planning of AMP works and opportunity Shut downs 2.Exceeding the given Shut down period 3.Thermovision scanning of Lines and other Eqpt 4.Effective patrolling and proper reporting 5.Cleaning of Insulators in polluted areas 6.Patrolling in critical locations 7.Proper communication during shut down period 8.Proper planning of Manpower and T& P 9.On line testing of Relays 10.Clearing of Tree and bushes in proper time 11.Replacing defective/puncture insulators by Hot Line techniques. 12. Signature analysis of Transmission Lines

Important : Outage of element causing Generation loss shall deemed to be twice the actual outage period for that element. Mis-declaration / submission of incorrect data shall be treated as twice the actual outage time. HVDC back to back and AC lines are considered as One element Outage of elements due to earth quake, cyclone, Grid disturbance,Act of god such as floods are considered as Natural calamities. Lines restored on ERS is considered as deemed available

The Availability of Transmission system is calculated in (%) Percentage as follows: ( of SRTS-I) Ta =Total available time in hours for all Lines = 17*24*365 = To=Total outage time in hours Attributable to POWERGRID for all Lines = Hours Availability in percentage (%) = ((Ta-To)/Ta*100 Availability in percentage (%) = ( )/148920*100 = %

Availability as per CERC order Methodology B = Annual Time =1*24*365 = 8760 C= Outage hours ATR to others = D= Outage hours ATR to Sys-Const = E = Total hours to be considered for Availability Ti =((B-(C+D)) = ((8760-( )) = F = Outage ATR to POWERGRID (TNA) = G = Deemed available ( 4.93) % Line Availability H = ( Ti –TNA)/Ti) % Line Availability = ( )/ = ATR = Attributable

Weightage Factor I = Line length in Ckt Kms = J = Surge Impedance Loading = 515 (400kV Moose ACSR) Wi = Weightage Factor = Line length * SIL = Avo = (Wi* % Line Availability)/Wi = ( *0.9984)/ =

Availability as per CERC order Methodology B = Annual Time =1*24*365 = 8760 C= Outage hours ATR to others = D= Outage hours ATR to Sys-Const = E = Total hours to be considered for Availability TK =((B-(C+D)) = ((8760-( )) = F = Outage ATR to POWERGRID (TNAK)= G = Deemed available (0.0) % ICT Availability H = ( TK –TNAK)/TK) % ICT Availability = ( )/ =

Weightage factor (Wk) = Rated MVA capacity Avq = (Weightage factor * % ICT Availability )/ Wk = 315*.9973/315 =

Availability as per CERC order Methodology B = Annual Time =1*24*365 = 8760 C= Outage hours ATR to others = 0.0 D= Outage hours ATR to Sys-Const = 0.0 E = Total hours to be considered for Availability Tm =((B-(C+D)) = ((8760-( ) = 8760 F = Outage ATR to POWERGRID (Tnam)= G = Deemed available ( ) % Bus Reactor Availability H = ( Tm –Tnam/Tm) % Bus Reactor Availability = ( )/8760 = 0.989

Weightage factor (Wm) = Rated MVAR capacity Avs = (Weightage factor * % Bus Reactor Availability )/ Wm = (50*0.989)/50 = 0.989

Availability as per CERC order Methodology B = Annual Time =1*24*365 = 8760 C= Outage hours ATR to others =5.28 D= Outage hours ATR to Sys-Const = 9.77 E = Total hours to be considered for Availability Tn =((B-(C+D)) = ((8760-( ) = F = Outage ATR to POWERGRID (Tnan)= G = Deemed available (0.0) % HVDC POLE Availability H = ( Tn –Tnan/Tn) % HVDC POLE Availability = ( )/ =

Weightage factor (Wn) = 50 % of Rated MW capacity Avt = (Weightage factor * % POLE Availability )/ Wn = (250*0.9898)/250 = = 50% of 500 MW = 250

Tariff in Incentive is calculated as per CERC order Methodology All elements are grouped into following catagories 1.AC Transmission lines = AVo 2.ICTs= AVq 3.Switched Bus Reactors = AVs 4.HVDC lines =AVp 5.HVDC back to back =AVt 6.SVC=AVr

Availability of each category is calculated based on the Weightage Factor,Total hours under consideration and non available hours for each element of that category. ° ° Availability of o No of AC lines = Σ Wi(Ti-Tnai)/ Σ Wi = AVo i=1 i=1 Where Wi = Weightage factor for ith transmission line Ti = Total hours of ith AC line Tnai= Total non availability hours for ith AC line Wi = Surge Impedance loading * Circuit Kms For inter regional lines, 50% of the weighted factor is taken for each region. For HVDC pole – The Rated MW capacity * circuit km

For ICT - The rated MVA capacity For switched bus reactor – The rated MVAR capacity For HVDC back to Back connecting two regions – 50 % of the Rated MW capacity of each block to each region. Overall Availability of Region % System Availability : o*AVo + p*AVp+q*AVq+r*AVr+s*AVs+t*AVt * 100 o + p+q+r+s+t

THANK YOU