© 2009 The McGraw-Hill Companies, Inc., All Rights Reserved F LEXIBLE B UDGETS AND S TANDARD C OSTS Chapter 24.

Slides:



Advertisements
Similar presentations
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
Advertisements

Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Standard Costs and the Balanced Scorecard.
Standard Costing and Variances
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Cost Analysis for Control
Flexible Budgets and Overhead Analysis Chapter 11.
Standard Costs Pertemuan 7. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for planning.
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and Variance Analysis Chapter Ten & Eleven.
Flexible Budgets and Overhead Analysis 11/30/04 Chapter 11.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Standard Costing and Variance Analysis
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
VARIANCE ANALYSIS 1 LECTURE 8.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Fundamentals of Accounting II
Financial and Managerial Accounting
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 14 Professor Jeff Yu.
Flexible Budgets and Standard Costs
Chapter 21 Flexible Budgets and Standard Costing.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Standard Costs and Operating Performance Measures
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 The Flexible Budget and Standard Costing Chapter 13 Objectives: Develop and.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Budgeting as a control mechanism 1. Budgeted levels are the standards to follow in operation 2. Variance evaluation for performance measurement A variance.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Flexible Budgets and Overhead Analysis Chapter 7.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 22. Prepare a flexible budget for the income statement.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Flexible Budgeting and Analysis of Overhead Costs CHAPTER 11 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Flexible Budgets Static Budget Based on estimate of sales and production levels Compare costs associated with actual production to costs for budgeted production.
Chapter 17 Overhead Cost Management Flexible Budgets.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
Welcome Back Atef Abuelaish.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Performance Evaluation
Flexible Budgets and Overhead Analysis
Managerial Accounting
Operational Budgeting
© 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Pertemuan 7 Standard Costs.
Flexible Budgets and Overhead Analysis
Paper F2 Management Accounting
Flexible Budgets and Overhead Analysis
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
Presentation transcript:

© 2009 The McGraw-Hill Companies, Inc., All Rights Reserved F LEXIBLE B UDGETS AND S TANDARD C OSTS Chapter 24

McGraw-Hill/Irwin Slide 2 McGraw-Hill/Irwin Slide 2 Management uses budgets to monitor and control operations.  Develop the budget from planned objectives.  Compare actual with budget and analyze any differences.  Take corrective and strategic actions.  Revise objectives and prepare a new budget. B UDGETARY C ONTROL AND R EPORTING

McGraw-Hill/Irwin Slide 3 McGraw-Hill/Irwin Slide 3 Improve performance evaluation. May be prepared for any activity level in the relevant range. Show revenues and expenses that should have occurred at the actual level of activity. Reveal variances due to good cost control or lack of cost control. P URPOSE OF F LEXIBLE B UDGETS A 1

McGraw-Hill/Irwin Slide 4 McGraw-Hill/Irwin Slide 4 P REPARATION OF F LEXIBLE B UDGETS To a budget for different activity levels, we must know how costs behave with changes in activity levels.  Total variable costs change in direct proportion to changes in activity.  Total fixed costs remain unchanged within the relevant range. Fixed Variable P 1 Let’s prepare budgets for Optel.

McGraw-Hill/Irwin Slide 5 McGraw-Hill/Irwin Slide 5 Exh P 1 Variable costs are a constant amount per unit. Total variable cost = $4.80 per unit × budget level in units Total Fixed costs do not change within the relevant range. P REPARATION OF F LEXIBLE B UDGETS

McGraw-Hill/Irwin Slide 6 McGraw-Hill/Irwin Slide 6 Benchmarks for measuring performance. The expected level of performance. Based on carefully predetermined amounts. Used for planning labor, material and overhead requirements. Standard Costs are S TANDARD C OSTS C 1

McGraw-Hill/Irwin Slide 7 McGraw-Hill/Irwin Slide 7 S ETTING S TANDARD C OSTS C 1 Quantity Standards Price Standards Direct Material Time Standards Rate Standards Direct Labor Activity Standards Rate Standards Variable Overhead

McGraw-Hill/Irwin Slide 8 McGraw-Hill/Irwin Slide 8 Prepare standard cost performance report Conduct next period’s operations Analyze variances Identify questions Receive explanations Take corrective actions Begin C OST V ARIANCE A NALYSIS C 2

McGraw-Hill/Irwin Slide 9 McGraw-Hill/Irwin Slide 9 Standard Cost Variances C OST V ARIANCE C OMPUTATIONS Quantity VariancePrice Variance The difference between the actual price and the standard price The difference between the actual quantity and the standard quantity C 2

McGraw-Hill/Irwin Slide 10 McGraw-Hill/Irwin Slide 10 Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price Price VarianceQuantity Variance C OST V ARIANCE C OMPUTATIONS C 2 Standard quantity is the quantity that should have been used for the actual good output. Standard price is the amount that should have been paid for the resources acquired.

McGraw-Hill/Irwin Slide 11 McGraw-Hill/Irwin Slide 11 AQ(AP - SP) SP(AQ - SQ) AQ = Actual Quantity SP = Standard Price AP = Actual Price SQ = Standard Quantity Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price Price VarianceQuantity Variance C OST V ARIANCE C OMPUTATIONS C 2

McGraw-Hill/Irwin Slide 12 McGraw-Hill/Irwin Slide 12 Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate Rate VarianceEfficiency Variance Materials price variance Materials quantity variance Labor rate variance Labor efficiency variance Variable overhead Variable overhead spending variance efficiency variance AH(AR - SR) SR(AH - SH) AH = Actual Hours SR = Standard Rate AR = Actual Rate SH = Standard Hours L ABOR C OST V ARIANCES P 2

McGraw-Hill/Irwin Slide 13 McGraw-Hill/Irwin Slide 13 Recall that overhead costs are assigned to products and services using a predetermined overhead rate (POHR): Estimated total overhead costs Estimated activity POHR = Assigned Overhead = POHR × Standard Activity O VERHEAD S TANDARDS AND V ARIANCES P 3

McGraw-Hill/Irwin Slide 14 McGraw-Hill/Irwin Slide 14 Spending Variance Efficiency Variance AH × SVRAH × AVR AH= Actual Hours of Activity AVR= Actual Variable Overhead Rate SVR= Standard Variable Overhead Rate SH= Standard Hours Allowed SH × SVR Actual Flexible Budget Applied Variable for Variable Variable Overhead Overhead at Overhead at Incurred Actual Hours Standard Hours C OMPUTING V ARIABLE O VERHEAD C OST V ARIANCES P 3

McGraw-Hill/Irwin Slide 15 McGraw-Hill/Irwin Slide 15 Spending Variance Volume Variance SFR= Standard Fixed Overhead Rate SH= Standard Hours Allowed SH × SFR Actual Fixed Fixed Fixed Overhead Overhead Overhead Incurred Budget Applied C OMPUTING F IXED O VERHEAD C OST V ARIANCES P 3

McGraw-Hill/Irwin Slide 16 McGraw-Hill/Irwin Slide 16 Total Overhead Variance Variable Overhead Fixed Overhead Efficiency Variance Spending Variance Volume Variance Spending Variance Controllable Variance P 3 C OMPUTING C ONTROLLABLE O VERHEAD V ARIANCES AND V OLUME VARIANCES

McGraw-Hill/Irwin Slide 17 McGraw-Hill/Irwin Slide 17 E ND OF C HAPTER 24