BRIDGET EGGERS, RICHARD LATHAM TYLER BRENT, VALERIA GONZALEZ Frozen Cookies Capacity Increase.

Slides:



Advertisements
Similar presentations
QUAN 6610 Flow Time Analysis (T)
Advertisements

COSTS OF PRODUCTION Chapters 11. Short-Run vs. Long Run Firms typically have several types of inputs that they can adjust to adjust production. Long-run.
Flow Rate and Capacity Analysis
Chapter 12 Aggregate Planning.
Aggregate Planning.
IMPROVEMENT PLAN UPDATESPO Richard Latham Bridget Eggers Tyler Brent Valeria Gonzalez.
Operations Management
III. Operational Measures
Process Analysis and Applications Module
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Economic vs. Accounting Cost Short-Run vs. Long-Run Decisions Opportunity Cost 8 Behind the Supply Curve: Inputs and Costs.
MANAGING INVENTORY, MRP AND JIT.  Inventory management is a system used to oversee the flow of products and services in and out of an organization. A.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
OPERATIONS MANAGEMENT OPRE 6260 Raymond Lutz. Products, Processes, and Performance - Chapter 1 Learning Objectives An operation as a transformation process.
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Maximizing Business Value Through Projects: Doing less and achieving more! Thomas G. Lechler Stevens Institute of Technology Hoboken NJ.
DEFINING STEPS TO MSD II TYLER BRENT BRIDGET EGGERS VALERIA GONZALEZ RICHARD LATHAM.
Costs of Production KW Chapter 8. Costs: Explicit vs. Implicit Explicit Costs of Production: Direct payments for resources not owned by a firm (raw materials,
1 Project Charter DEFINE. 2 Project Charter DEFINE.
F-1 Applying Lean to Factory Homebuilding Dr. Mike Mullens, PE.
Your Company Logo Dr. Gordon Yen Enhancing Supply Chain Visibility in Fountain Set with SCOR Model.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Operations Management
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Managing Processes and Capabilities CHAPTER THREE.
P10712 CHEESECAKE PROCESS IMPROVEMENT Andreana Crance, Kevin Rodas, Rob Santora, Jeremy Smith, Matt Syska.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
© Wallace J. Hopp, Mark L. Spearman, 1996, EOQ Assumptions 1. Instantaneous production. 2. Immediate delivery. 3.
Flow Rate and Capacity Analysis
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph Fitzery Cinthia Sanchez.
Advaned Planning and Scheduling J.Skorkovský, KPH.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
Bakery By Citlali Alfonso. What Is It? A bakery is an establishment which produces or sells bread, pies, pastries, cakes, biscuits, cupcakes, cookies,
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph FitzeryCinthia Sanchez.
Lean Healthcare - The Use of Value Stream Maps in Healthcare ISE 468 ETM 568 Spring 2015 Dr. Joan Burtner.
Activity Scheduling and Control
GRAPHING BASICS Data Management & Graphing. Types of Graphs After collecting your data, you will need to organize it into a graph. After collecting your.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
WHITE DELI SUB PRODUCTION PROCESS IMPROVEMENT SOLUTION APPROACH May 21 st 2012.
Why Measure?. What Would You Do First? What Would You Do First?
Scientific Process Skills Unit 1: Building a Community of Scientists and Engineers.
SCIENCE SKILLS. Magic Grow® Capsule Observations To make a Data Table: Observations of Sponge Animal Capsules Label the type of observation Give your.
Value Stream Maps Identify Constraints. Constraint Anything that restricts or limits the flow of a process Also called a bottleneck 2.
Chapter 5 Lecture 8 Capacity Planning FOR Products and Services.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Operations & Logistics Management Lesson 7- Process Design & Lesson 8- Capacity & Buffering Operations.
BPP LEARNING MEDIA CIMA P2 Advanced Management Accounting 熊家财
PRODUCT DEVELOPMENT Student Notes. PRODUCT DEVELOPMENT  Is the process of creating new or improved products  Involves brainstorming, designing, building,
Rob Connatser NSS Instrument Work Packages and XLPM.
Value Stream Mapping Plus Learning to See Better Know the Laws. Use the Tools. Profit. © Factory Physics, Inc.
EXPERIMENTAL DESIGN Science answers questions with experiments.
Observation vs. Inference
Agile Scrum Management
Analytical Tools for Process Analysis and Improvement
Operations Management
13 Aggregate Planning.
Dr Sh Salleh bin Sh Ahmad
Example 1A: Solving Inequalities with Variables on Both Sides
Objective Solve inequalities that contain variable terms on both sides.
Part 1: Designing the Experiment My Question:
Production and Operations Management
Production Skills & Costs
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Capacity Planning For Products and Services
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
WHITE DELI SUB PRODUCTION PROCESS IMPROVEMENT
Limited Resources Concept
Presentation transcript:

BRIDGET EGGERS, RICHARD LATHAM TYLER BRENT, VALERIA GONZALEZ Frozen Cookies Capacity Increase

Presentation Goals Is the current state of our project well defined? Is the information presented relevant to the project goal? Is there any missing information that you believe would be helpful? Feedback and questions are encouraged

Project Scope Establish synchronized flow between scaling, mixing, dividing and packaging steps in frozen cookie production for optimal productivity. Scaling Mixing Stage Dividing

Defining Current State  Undefined variability in and around the production line  There is a bottleneck between the mixing and dividing steps  Underutilization of resources  Scheduling issues  Use of overtime  Lack of standardization  Production delays

Frozen Cookie Demand 2013

Data Collection

Data Sources Frozen Bakery Tracking Form-  Actual Packaging Times (Cakes, Muffins, Doughnuts, Frozen Cookies) APV Commercial Oven Tracking Form  Actual Commercial Oven Times (Commercial Cookies) Frozen Bakery Tracking Form  Actual Dividing Times (Frozen Cookies) Weekly production schedules for commercial cookies  Scheduled Commercial Oven Times (Commercial Cookies) Weekly production schedules for frozen cookies  Scheduled Packaging Times (Cakes, Muffins, Doughnuts, Frozen Cookies) Frozen Cookie Cycle Times and Recipes Cookie Capacity & Capability

Seasonal Demand Data Cases

Number of Observations

Analysis

Actual vs. Scheduled Commercial Oven Production Time

Mixing

Mixing Station Time Cumulative TimeTask TimeTask 14:150:00:00 14:200:05:02 Setting up stationNVA 14:250:05:200:00:18Add ingredientVA 14:250:05:280:00:08Walk/Open/FoldNVA 14:250:05:380:00:10Add ingredientVA 14:250:05:420:00:04Walk/Open/FoldNVA 14:250:05:550:00:13Add ingredientVA 14:260:06:050:00:10Walk/Open/FoldNVA 14:260:06:400:00:35Add ingredientVA 14:270:07:510:01:11MixVA 14:310:11:520:05:12Grab more ingredientsNVA 14:330:13:140:01:22Add ingredientVA 14:340:14:050:00:51Walk/Open/FoldNVA 14:340:14:120:00:07Add ingredientVA 14:340:14:220:00:10Walk/Open/FoldNVA 14:340:14:290:00:07Add ingredientVA 14:340:14:540:00:25Walk/Open/FoldNVA 14:350:15:010:00:07Add ingredientVA 14:350:15:090:00:08Walk/Open/FoldNVA 14:350:15:210:00:12Add ingredientVA 14:390:19:200:04:11MixVA 14:390:19:450:04:24Grab more ingredientsNVA 14:400:19:580:00:13Add ingredientVA 14:400:20:040:00:06Walk/Open/FoldNVA 14:400:20:220:00:18Add ingredientVA 14:400:20:290:00:07Walk/Open/FoldNVA 14:400:20:470:00:18Add ingredientVA 14:400:20:520:00:05Walk/Open/FoldNVA 14:410:21:000:00:08Add ingredientVA 14:410:21:070:00:07Walk/Open/FoldNVA 14:410:21:190:00:12Add ingredientVA 14:420:22:400:01:21MixVA 14:440:24:530:02:13Dump doughNVA 14:470:27:070:02:14Move troughs, cover and label themNVA Percentage of VA vs. NVA per observation 12345Average VA NVA

Planned vs. Actual Mixing Time

Dividing

Dividing Station The following timeline shows value-added (colored sections) vs. non-value added (white sections) activities. Each color represents one trough There is not continuous flow within the station

Planned vs. Actual Dividing Time The following graph shows the scheduled vs. the actual time for frozen cookies on the divider

Actual vs. Scheduled Packaging Times

Conclusions Variability derives from other production lines that are sharing resources  Mixer with Commercial cookies  Blast Freezer with Cakes, Muffins & Doughnuts Changeover time is not accounted for in scheduling Planned vs Actual cycle times are not consistent Labor intensive tasks on Mixer yields high variability in cycle times Unplanned production adjustments affect scheduled availability of shared resources

Open items & future work Observation on the pre-scaling station Further analysis on commercial line change over times Further analysis on variability in the cake, muffin and doughnut lines Identify most effective and feasible solutions concepts

Q& A