Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Stave # 1 Metrology Eric VIGEOLAS, WG2 July the 12th 2011.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
Production of precise large PCB’s Introduction to the problem Achievement in collaborating with industry (Print Electronics in IL and MDT in Italy). Conclusions.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Summary of Energy Star Site Inspection July 11, 2007
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
1st Nov 2001 Nigel Hessey SCT Endcap Structures FDR1 Endcap Requirements Brief overview of SCT Endcap Requirements layout, X0, thermal, positioning, stability.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Tilt angles reloaded, and status of some other things.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Stave production.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Stave Tooling & Plans for Future Stave-building (Tim)
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Stave Assembly (module mounting and stave 250) Ian Wilmut (RAL)
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
1 IST development status  Seattle  Composite Design.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Berkeley status Aug 10th, 2012.
European DHCAL Meeting 13/06/08
UK Knowledge of Pipe Bending and Pressure Testing Martin Gibson (RAL) Pipe bending by Ian Lancaster University Connector welding by.
What is Stave Carrier Frame Required to Do?
T. Bowcock University of Liverpool
SBN Far Detector Installation & Integration
Planar distortions for SCT Barrel Modules
Update on Module Mounting on Staves and Stavelets and a description of how the new system will work 11/7/11.
Are there better ways to build a stave?
Nikhef/Bonn LepCol meeting
Open Issues Modification of Cactus Arm bending tool required
Equipment for Assembly – UK Experiences
Studies of Quad Pixel Module assembly using paper laminate
WG4 – Progress report R. Santoro and A. Tauro.
Presentation transcript:

Module mounting

Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported to QMUL At QMUL it will be thermally imaged, cycled and imaged again Assuming it checks out Ok it will return to RAL and have modules attached

In the mean time… Martin has been taken ill – we don’t know when he will be back (presently in the JR) At RAL we have been working out a plan of how to mount modules in his absence So far – We have repaired the stave – Started to prepare the in frame link pipes – Have a plan to realign the support blocks in the frame – Have found everything we need to mount modules except SE4445 – Have a plan to fabricate some bent modules to allow trial module mounting Presently – Ivan is aligning walls of module mounting tooling for a full stave – Peter and Tom (summer student) are making final DAQ etc preparations

Whilst the stave is at QM We hope to mount several glass plates Mount several bowed glass dummy modules Mount at least one mechanical sensor (if we can find one) Ideally mount one substandard electrical or a final module on a stavelet (needs finalising)

Conclusion Stave 250 looks quite good post repair QMUL need to verify it is as good as it looks We have a programme in place to prepare to mount modules without Martin We will be slower that Martin, but we are fairly confident we collectively have the necessary knowledge

Extras

Stave 250

Issue 1: Damage at Z=0 Closeout Delamination that extends almost to the screen Hole Consistent with a hard knock during transit?

The stave will be repaired at RAL - IW will doodle of end of stave close out and circulate The stave will then travel to QMUL in the back of a car where it will be – Thermally imaged at room temperature with water at +35C circulation – The stave will be thermally cycled 10 times between -25 to +35 If tests at BNL were less aggressive we will use their temperature limits – The stave will be thermally imaged at room temperature with water at +35C circulation a second time 9 Locations & Subsequent QA

Issue 2: HV pads are offset HV tracks on Stave 250 DC-DC tape are offset from pads on EoS by ~7mm

Design Considerations In principle - 10mm space available to fix this In practice -EoS thickness (2.3mm + glue) and the 45 degree rule for wirebonding mean maximum width of translation PCB, allowing for reasonable tolerances, is 7mm. The pads would ideally be ~200 microns in from the edge, >=500 microns long, and as wide as they are now. EoS 2.33 Translation Oxford (Roy W & Peter H) have started work on this “Translation PCB”

12 Large glue gap. Mounting tube NOT visible Small glue gap. mounting tube visible Issue 3: Placement of Power Tape with respect to Edge Closeouts “BAD” SIDE “GOOD” SIDE => We shall live with this feature

Background so we all understand the problem 13 On Stave 250 the shield plane edge lifts up at the joint between adjacent module positions The current adhesive application technique fills the hollows in the Kapton in one dimension only (room to spread in 1D) Peak to trough of 100 microns Y X Issue 4: 2D surface variations

FZ1 modules (as seen from above) typically concave. The two at RAL (from Cambridge) have 4 corners flicked up where the peak to trough is 250 microns I have positions on the stave where the Kapton is rises at the module to module joint. ( but not at every joint!) by about 100 microns. (this seems to be a new feature of the Kapton) There is a background feature that runs along the length of the stave that gives about a 100 micron peak to trough variation. (seen many times and the glue pattern was changed to cope with this) The glue can fill in undulations in one dimension only with the current application technique.(ie those features that runs along the length of the stave. It can not fill in both X and Y sets of variations. IF I increase the thickness of the initial glue layer to give better coverage of the worst areas (by asking the glue to spread more) then it will simply ooze out in those positions where the surface do not have this flicked up feature, nor will I be able to control it at the 4 corners. Remember that my jig has soft vacuum cups in the middle and edges along 2 of the 4 detector sides that run in the y direction. It remains to be seen if they will flatten out a module, of if I need to do some more work. It is also spring loaded to allow for variation in stave thickness of general overall flatness, so the glue gap is set by the feet of the jig or by the viscosity of the glue. 14 => Trials needed.

Stave Repair Ian, Peter, Cyril, Simon STFC RAL

Holes Drilled

FOAM

The Big Hole seen close-up

8 th July :30AM – – Injected ~4cc of West Epoxy G-flex into core through holes, – Closed holes with flash breaker tape – Stood on end (damage down) to allow glue to join skins.

9 th July :00am – Removed tape and inspected stave repair – All holes well filled with glue – Glue has also filled voids beneath damaged area – Small amount of surface glue on

Filling of extra holes Small amount of surface flue where the masking allowed a little build up Smaller crack on rear completely filled

Side without holes post repair

Side with holes post repair

Conclusion The repair worked better than expected All holes seem to have been closed It is no longer possible to lift laminates from the end/corners There is a very small amount of surplus glue on the surface – this will not be removed.