PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MOM Report Galina Vankova RAL, MICE Video Conference.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
1 MICE MPB/RLSR Integration of Step IV Readiness of the major subsystems Installation sequence and schedule considerations Logistics, staffing and local.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Update on PANDA solenoid design
MICE Partial Return Yoke Mechanical Design
Step IV PRY Preparation - Contents
MICE CM31 Schedule summary
Installation step 4. (3 days)
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Additional Upstream Coil Shielding
Experimental equipment Edgar L. Black February 17, 2019
Senad Kudumovic Design engineer
Bunker Wall Design Wall ESS
Presentation transcript:

PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine l Fit with Services in General l ToF1 Assembly l Fit with RF Waveguides l Absorber Change Jason Tarrant – Integration Engineering

Fit With Experimental Devices l Spectrometer Solenoid (TD )  General Clearances Vessel vacuum connection (requires extending) SS Tie- Down beam PRY SS

Fit With Experimental Devices l Spectrometer Solenoid (TD )  SS Tie-Downs  Access required to disconnect when PRY in place PRY SS

Fit With Experimental Devices l Absorber Focus Coil (TD )  General Clearances H2 transfer line Vessel vacuum connection (requires extending) H2 vacuum line Gate valve PRY AFC

Fit With Experimental Devices l Absorber Focus Coil (TD )  Gate Valve  Access required to operate the gate valve and clearance for the handle  H2 System Pipes  Non-flexible services to and from AFC

Fit With Floor & Trench l False Floor (TD )  General Clearances False floor Under floor supports for the PRY Supports where ramp to be cut back Fixed – levelled plate(s) for the PRY Current trench roof supports & services Cuts for South Mezzanine legs Base/Platform/Plate Design James Watson

Fit With Floor & Trench l False Floor (TD )  General Clearances Temporary moving platform guides AFC offline moving platform SS offline moving platform

Fit With South Mezzanine l South Mezz (TD )  General Clearances Raised platforms to avoid clash with PRY Cut in platform for absorber change & PRY installation Front edge platforms removed for Step IV (main handrail shown- off for this view)

Fit With Services l PRY & Services (TD )  General Clearances Services to be routed along PRY, esp. comp hoses & magnet cables Magnet Cable Path H2 System Pipes

Fit With ToF1 Assembly l ToF1 Cage & PRY l ToF1 assembly can only be performed without north-upstream PRY ToF1 Assembly Arm Tracker Cryo

Fit With Waveguides l Partial pre-step V / VI installation (TD )  General Clearances RF System Waveguides under false flooring Pillars and columns supporting Step IV PRY

Absorber Change l Procedure to extract AFC from PRY (TD ) l Note times do not include fill/purge of H from the hydrogen system! At operationRemove services obscuring AFC (excluding H purge) [5 days TBC] Remove part of handrail, mezzanine cut out & add bar to protect the AFC (when removing the middle plates) [0.5 day]

Remove outer-upper doublers south middle-upper plate Slide out south middle-lower plate at 11.5 degree angle Before sliding out of lower doublers completely rotate vertically Lift up and away [1 day]

Remove upper outer doublers & north middle-upper plate Remove middle legs Slide out north middle-lower plate [1 day] (for north side middle plates) Uncouple bellows between AFC & SSs [1 day] Remove AFC [0.5 day] Change Absorber [? day TBD]

Conclusion l Detailed review of fit of PRY with various ‘components’ of the MICE Hall have shaped the PRY design to significantly reduce / eliminate the chance of a clash. l The design of the PRY allows for AFC Absorber changes with the minimum of removal of the PRY, reducing time and risk.