NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.

Slides:



Advertisements
Similar presentations
TDC130: High performance Time to Digital Converter in 130 nm
Advertisements

A. Kluge January 25, Aug 27, 2012 Outline NA62 NA62 Specifications Specifications Architecture Architecture A. Kluge2.
Figure 5. Histogram of the decay constant. Black curves: raw histograms; Blue curve: Gaussian fit to the histogram from the 20GS/s waveform; Red curve:
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Timepix Studies: Medipix Collaboration Summary and More Timewalk Plots Alessandra Borgia Marina Artuso Syracuse University Group Meeting – Thursday 20.
MDT-ASD PRR C. Posch30-Aug-02 1 Specifications, Design and Performance   Specifications Functional Analog   Architecture Analog channel Programmable.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Status of Oxford Setup Matthew Chalk, Erik Devetak, Johan Fopma, Brian Hawes, Ben Jeffery, Nikhil Kundu, Andrei Nomerotski University of Oxford ( 18 August.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
June/5/20081 Electronics development for fast-timing PET detectors: The multi-threshold discriminator Time of Flight PET system Contents 1. Introduction.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
5ns Peaking Time Transimpedance Front End Amplifier for the Silicon Pixel Detector in the NA62 Gigatracker E. Martin a,b J. Kaplon b, A. Ceccucci b, P.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Performance of SPIROC chips in SKIROC mode
Report on SiPM Tests SiPM as a alternative photo detector to replace PMT. Qauntify basic characteristics Measure Energy, Timing resolution Develop simulation.
Readout electronics of the NA62 Gigatracker system G. Dellacasa 1, V.Carassiti 3, A. Ceccucci 2, S. Chiozzi 3, E. Cortina 4, A. Cotta Ramusino 3, M. Fiorini.
Timing Jitter and Cross Talk in the SRS + Xray scan of FIT zigzag board Michael Phipps, Bob Azmoun, and Craig Woody 1.
NINO RO chip qualification with the laser test system Sakari and Fadmar.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
A Study of Time over Threshold (TOT) Technique for Plastic Scintillator Counter 高能物理研究所 吴金杰.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
A. Rivetti Gigatracker meeting, dec 2009 Charge measurement with the TDC per pixel architecture A. Rivetti, G. Dellacasa S. Garbolino, F. Marchetto, G.
B.Satyanarayana. B.Satyanarayana INO Weekly meeting June 8, Rise time: 2 to 3ns Pulse height: mV.
Performance of a 128 Channel counting mode ASIC for direct X-ray imaging A 128 channel counting ASIC has been developed for direct X-ray imaging purposes.
Time Resolution of Thin LGADs Results from the Nov 2014 Beam Test at CERN Improvement in hand: Sensor Capacitance Measurements with  Front TCT 1 Hartmut.
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
1 New TOT design for the LAV F.E. electronics M. Raggi, P. Valente G. Corradi, D. Tagnani LNF electronic service TDAQ Working Group 29/05/2009.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
Time over Threshold Electronics for Neutrino Telescopes
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
May, 2006FEE 2006 / Perugia, Italy(1) Front End Electronics for the NOvA Neutrino Detector John Oliver, Nathan Felt Harvard University Long baseline.
NA62 Gigatracker Working Group 28 July 2009 Massimiliano Fiorini CERN.
Pixel Read-Out architectures for the NA62 GigaTracker G. Dellacasa (1), A. Cotta Ramusino(3), M. Fiorini(3), P. Jarron(2) J. Kaplon(2), A. Kluge(2), F.
65 nm CMOS analog front-end for pixel detectors at the HL-LHC
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
Trip-t testing progress report
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
FADC Time Study EJ, HD 10/09. Purpose: to test Hai Dong’s firmware implementation of Indiana U. timing algorithm NOT meant to be a definitive study of.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
-1-CERN (11/24/2010)P. Valerio Noise performances of MAPS and Hybrid Detector technology Pierpaolo Valerio.
1 MGPA Linearity Mark Raymond (Dec.2004) Non-linearity measurements in the lab hardware description method results.
A Multi-Threshold Method for TOF-PET Signal Processing Heejong Kim 1, Chien-Min Kao 1, Qingguo Xie 1, Chin-Tu Chen 1, Octavia Biris 2, Jialin Lin 2, Fukun.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Equalization of Medipix2 imaging detector energy thresholds using measurement of polychromatic X-ray beam attenuation Josef Uher a,b, Jan Jakubek c a CSIRO.
Technical status of the Gossipo-3 : starting point for the design of the Timepix-2 March 10, Vladimir Gromov NIKHEF, Amsterdam, the Netherlands.
NA62 Collaboration Meeting – Anacapri 1 September 2009 Massimiliano Fiorini CERN.
NA62 GigaTracKer Working Group meeting December 13, 2011 Matthew Noy & Michel Morel Status of test for GTK carrier and components.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Setup for automated measurements (parametrization) of ASD2 chip
Journées VLSI-FPGA-PCB Juin 2010 Xiaochao Fang
A General Purpose Charge Readout Chip for TPC Applications
L. Ratti, M. Manghisoni Università degli Studi di Pavia INFN Pavia
Michael Lupberger Dorothea Pfeiffer
FIT Front End Electronics & Readout
TDC at OMEGA I will talk about SPACIROC asic
New Discriminator Board Test
Hellenic Open University
Status of n-XYTER read-out chain at GSI
A Multi-Threshold Method for TOF-PET Signal Processing
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Stefan Ritt Paul Scherrer Institute, Switzerland
Pre-installation Tests of the LHCb Muon Chambers
Imperial laser system and analysis
Presentation transcript:

NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN

Measurement setup (1) M. Noy (19/11/2009) Discriminated pixel output

Measurement setup (2) single PC controlling everything via USB and Ethernet inject charge pulses with fixed rise time (2.5 ns) and variable amplitude Tektronics AFG3252 pulse generator driving charge injection circuit programmable 0 – 5 V, pulse min. 50 mV, steps of 1 mV 1/10 attenuation: 5 mV  0.5 V, steps of 100 µV charge injection ~20 fF (0.1 fC  10 fC) record injected signal and discriminated pixel output with oscilloscope LeCroy WavePro 7100A oscilloscope (20 GS/s for 2 channels, 1 GHz analogue bandwidth) CERN prototype chip: measurement of 1 of the 5 test pixels with discriminated output with CLOCK OFF with CLOCK ON (replaced USB card with ALTERA board) 250 MHz DLL operation (125 ps bin)

Measurement setup (3)

T in V (0.7 fC) threshold

Measurement setup (3) T1T1 T2T2 0 V threshold

Injected pulse signals nominal pulse amplitudes from 0.06 V to 0.5 V (correspond to 1.2 fC and 10.0 fC resp.) note: 1/10 attenuation threshold set to V (0.7 fC)

Discriminated output signals

Injection time measurement (1) least square method applied to: Method 1 3 samples above and below threshold Method 2 40 samples on the rising slopes at fixed position (~ ns)

Injection time measurement (2) least square method applied to: Method 1 3 samples above and below threshold Method 2 40 samples on the rising slopes at fixed position (~ ns) T in

Discr. times measurement least square method applied to: Method 1 3 samples above and below threshold (0 V) T1T1 T2T2

Correlation coefficient: T 1 and T 2

Correlation coefficient: T in

Ex. of low charge pulse shape (1)

Ex. of low charge pulse shape (2)

Method 1 Vs 2 for T in Measurement

T 1 jitter

Correction of Injection Baseline Variation

Injection baseline variation

T 1 jitter (w. baseline correction) variation of V (0.7 fC) threshold taking into account (trace by trace) baseline variation lower T 1 jitter

Results with CLOCK OFF

Leading edge time (T 1 )

Trailing edge time (T 2 )

Injection time (T in )

(T 1 – T in )

(T 2 – T in )

Time over Threshold (T 2 – T 1 )

T 1 jitter: (T 1 – T in ) rms

T 2 jitter: (T 2 – T in ) rms

Results with CLOCK ON

Leading edge time (T 1 )

Trailing edge time (T 2 )

Injection time (T in )

(T 1 – T in )

(T 2 – T in )

Time over Threshold (T 2 – T 1 )

T 1 jitter: (T 1 – T in ) rms

T 2 jitter: (T 2 – T in ) rms

Extraction of CLOCK contribution

T 1 jitter: CLOCK contribution mean jitter value of (36 ± 2) ps above 2 fC

Geant 4 Simulation

Energy release GTK per hit mean energy: 72.4 keV (~20.1 k e-h  ~3.2 fC) most probable energy: 53.7 keV (~14.9 k e-h  ~2.4 fC) FWHM: ~25 keV (~6.9 k e-h  ~1.1 fC) minimum energy: ~29 keV (~8.1 k e-h  ~1.3 fC)

Charge-weighted T 1 jitter value taking into account the energy distribution of particle hits in the Gigatracker, one can extract a weighted average value for the jitter on T 1 no charge sharing between pixels considered

Charge weighted average result: (65 ± 12) ps  CLOCK OFF Charge weighted average result: (76 ± 11) ps  CLOCK ON CAVEAT  measurements done with: 20 pF pixel input capacitance (no bump-bonded sensor) 2.5 ns pulse injection rise time 25 °C ambient temperature no charge sharing Comparison with simulation: simulations from J. Kaplon show ps rms (160 ps pk- pk) for a 3.0 fC signal Results of weighted jitter

Conclusions T 1 jitter was measured to be: lower than 100 ps for charge injection greater than 2.0 fC ~69 ps at 3.2 fC injection (mean charge released by mip) Charge weighted jitter is (76 ± 11) ps with CLOCK ON Measurement + analysis method limited by noise especially for low charge injections (less than ~2 fC) measured jitter values have to be considered upper limits

SPARES

Energy release GTK per hit (2) mean energy: 72.4 keV (~20.1 k e-h  ~3.2 fC) most probable energy: 53.7 keV (~14.9 k e-h  ~2.4 fC) FWHM: ~25 keV (~6.9 k e-h  ~1.1 fC) minimum energy: ~29 keV (~8.1 k e-h  ~1.3 fC)

Time Over Threshold Correction

ToT Correction (1) build Look-Up Table to correct T 1 as a function of the signal Time Over Threshold, i.e. (T 2 – T 1 )

ToT Correction (2) from ToT plot fit, extract input charge values using 50 ps wide time intervals (from 10 ns to 20 ns)

ToT Correction (3) from (T 1 – T in ) plot fit, compute the time correction to be applied to T 1 then build complete LUT to be used in reconstruction program

Results (1) T 1 – T in distribution becomes flat error bar = jitter small shift around ~6 fC due to change in measurement conditions

Results (2) T1 jitter consistent with value before correction problem with the same 2 points around 6 fC

Results (3) problem with 2 points around ~6 fC due to events “leak” from one bin to the next one around the “threshold” for anomalous T in behavior

Results (3) problem with 2 points around ~6 fC due to events “leak” from one bin to the next one around the “threshold” for anomalous T in behavior

problem with 2 points around 6 fC due to events “leak” from one bin to the next one around the “threshold” for anomalous T in behavior Results (3)

Correction of Injected Pulse Height Variation

Inject. pulse height variation (1)

Inject. pulse height variation (2)

Inject. pulse height variation (3)

T 1 jitter selection of injected pulse height within ±0.1 mV of local mean value (±0.002 fC) comparable T 1 jitter (lower jitter for first bin only) cuts a lot of statistics and has negligible effect: not used in the analysis