Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.

Slides:



Advertisements
Similar presentations
Autodesk Integrations Overview SmartDesk A seamlessly integrated, affordable, out-of-the-box, Windows based drawing and document management tool for.
Advertisements

MICHAEL MARINO CSC 101 Whats New in Office Office Live Workspace 3 new things about Office Live Workspace are: Anywhere Access Store Microsoft.
Presentation by Priyanka Sawarkar
Product Configurator for Marketing to Manufacturing design automation.
© 2012 Autodesk BIM Collaboration Siva Koppula Technical Consultant.
AUTODESK VAULT DATA MANAGEMENT SOFTWARE Hari kumar Gurudu (206735) M.Sc Digital Engineering Data Management for Engineering Applications
Supplement 02CASE Tools1 Supplement 02 - Case Tools And Franchise Colleges By MANSHA NAWAZ.
An overview of the CERN CMMS
Examine Quality Assurance/Quality Control Documentation
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Revising assemblies.
Product Lifecycle Management: Meeting the Needs of Collaboration
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Andrea Sartori Solution Architect EMEA
Presentation By: Brian Mais. What Is It? Content Management Systems(CMS) describes software that manage content, workflow, and collaboration online and.
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
CMPS 435 F08 These slides are designed to accompany Web Engineering: A Practitioner’s Approach (McGraw-Hill 2008) by Roger Pressman and David Lowe, copyright.
New Product Development Management NPDM 11 Mohsen SADEGHI
Geo-reference Your Documents with Laserfiche and ESRI.
MSS Technologies and the AIIM Grand Canyon Chapter present: Electronic Document Management System Needs Analysis.
Workflow and SharePoint Presented by Ben Geers. Overview What is workflow? Windows Workflow Foundation How does workflow apply to SharePoint? WSS v3 vs.
New test structures: Status report and technical documentation review
Office Live Workspace Visio 2007 Outlook 2007 Groove 2007 Access 2007 Excel 2007 Word 2007.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
 Chapter 6 Architecture 1. What is Architecture?  Overall Structure of system  First Stage in Design process 2.
Ravi Block Application Software Module 1.8.
European Plant-to-Enterprise Conference October 27-28, 2009, Utrecht, The Netherlands Mdf MES Development Framework Massimiliano Papaleo.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Project management tools Tiia Uusimäki. Agenda Activity Planning Tool and Earned Value Management – Why are the tools needed? – Activity Planning tool.
Moving into Implementation SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED.Roberta M. Roth.
1 Warranty and Repair Management For Infor XA Release 7 WARM Denise Luther – Sr. XA Consultant WARMS Technical Manager CISTECH, Inc. Rod Fortson – Sr.
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
Work Flow Control and Documentation Name: J. Douglas Wells Sponsor: Molded Plastic Ventures (MPV)
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
E-Document Part II: ILC EDMS ILC / LCWS Workshop, Hamburg 2007 Lars Hagge Deutsches Elektronen-Synchrotron (DESY)
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
Review of the processes released in the framework of the MMP Goran Perinić.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
Can you do this in SmarTeam?
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
The New Generation of CAD Tools
Vacuum Controls Quality Management
Using E-Business Suite Attachments
Configuration Management and Layout Database ELENA Project
The MTF adjusted system to meet Vacuum Group needs
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
EIN 6133 Enterprise Engineering
Release Presentation – January 2017
Replace with Application Image
E. Manola-Poggioli 05 December 2001 EDMS doc
Case management as logbook for the cryogenic installations at CERN
Working Drawings Chapter 12.
Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019.
What is a System? A system is a collection of interrelated components that work together to perform a specific task.
Presentation transcript:

Margarita Saifoulina BE/RF/SR

Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution

Data Management Agile (AXALANT) Design data Drawings & Documents Agile (AXALANT) Design data Drawings & Documents Infor EAM (D7i) Asset tracking Work management Infor EAM (D7i) Asset tracking Work management Other DBs Parameters Production data EDMS Common Layer EDMS Web MTF-Travellers

Data Organization AX1.8- application Axalant EDMSMTF Excel worksheet

EDMS/MTF for RF structures Design side(EDMS)= Items – Structure – Drawings – 3D models – Parameters – Links to documents Physical manufacturing side(MTF) = Equipment – Structure of assembly – Main – Made of – Equipment data – Manufacturing Workflow steps – Quality control – Installation – Documents(links) Design side(EDMS)= Items – Structure – Drawings – 3D models – Parameters – Links to documents Physical manufacturing side(MTF) = Equipment – Structure of assembly – Main – Made of – Equipment data – Manufacturing Workflow steps – Quality control – Installation – Documents(links)

Project structures in EDMS Project breakdown The project consists of its related sub-projects Outline attached documentation – What to build or buy for a certain project Can simplify group information that belongs together Project breakdown The project consists of its related sub-projects Outline attached documentation – What to build or buy for a certain project Can simplify group information that belongs together Document : Planning of Project 3 Document : Specification of Project 3

Bill of Materials - BOMs in EDMS Document : Assembly drawing Document : Assembly 3D CAD model Assembly breakdown Can be seen as the outcome of a project -Describes how to build something Attached documentation contains all necessary information about product manufacturing Assembly breakdown Can be seen as the outcome of a project -Describes how to build something Attached documentation contains all necessary information about product manufacturing

Item structure - BOMs Each item represents design of a component or an assembly Item structure illustrates what components and how many of each are needed for an assembly The parts list(Bill Of Material) can be found on an assembly drawing Each item represents design of a component or an assembly Item structure illustrates what components and how many of each are needed for an assembly The parts list(Bill Of Material) can be found on an assembly drawing

Different breakdown structures

Different structures during project lifecycle

Product Lifecycle Management (PLM) PLM = EDMS at CERN

PLM in RF structure development Documentation already available in EDMS/other systems Needed an integrated interface for simplifying data management  Collecting data from several databases and systems not efficient Demand for easier access to information about RF-structures’ PLM  Documentation already available in EDMS/other systems Needed an integrated interface for simplifying data management  Collecting data from several databases and systems not efficient Demand for easier access to information about RF-structures’ PLM 

Equipment Management Folder (MTF) The computerized version of the paper folder accompanying any equipment being built Provides traceability of large quantities of parts manufactured in a geographically distributed environment A wide range of data such as manufacturing procedures have to be stored and retrieved – General data but also very specific properties of the individual equipment The computerized version of the paper folder accompanying any equipment being built Provides traceability of large quantities of parts manufactured in a geographically distributed environment A wide range of data such as manufacturing procedures have to be stored and retrieved – General data but also very specific properties of the individual equipment

Workflow capabilities Handling data Document lifecycle features Information about sheluding Applicable standards Test results and possible non-confirmities Reports Handling data Document lifecycle features Information about sheluding Applicable standards Test results and possible non-confirmities Reports

Workflow steps for RF structures

Workflow steps in AX Workflow steps

Definition of Equipment Profiles The equipment itself and its manufacturing process have to be “declared” to the system  Equipment’s profile A helper application “AX” implemented in Microsoft Access Import process AXALANT  EDMS  AX1.8 –application  MTF The equipment itself and its manufacturing process have to be “declared” to the system  Equipment’s profile A helper application “AX” implemented in Microsoft Access Import process AXALANT  EDMS  AX1.8 –application  MTF

EDMS Update Via the Import Mechanism Based on Excel template Import mechanism - allows rapid update of large quantities of data in a single operation Based on Excel template Import mechanism - allows rapid update of large quantities of data in a single operation

An item in Axalant

An equipment in AX1.8-application

Identification of equipment Prefix controlled by the EDMS Team. Identifier managed by each project/machine/experiment. Examples of prefixes: HC- Large Hadron Collider 10- Alice 20- Atlas 3%- CMS ZZ- Off-the-shelf components not specific to a single project/experiment. CR- Manufactured components not specific to a specific project/experiment. Examples of prefixes: HC- Large Hadron Collider 10- Alice 20- Atlas 3%- CMS ZZ- Off-the-shelf components not specific to a single project/experiment. CR- Manufactured components not specific to a specific project/experiment.

Part identifiers Composition of the Part Identifier: Example C L A A S – C R Composition of the Part Identifier: Example C L A A S – C R

Component Assembly Subassembly

Future prospects Different BOM Manual re-writing of large amount of data is a source of errors Tree structure becomes complicated for complex equipments Guideline on how to search information through EDMS/MTF Data security Change of data belonging to other users is possible in some cases

Future prospects Slow response time of EDMS Use of off-online tools Training for MTF users is necessary Quality of data before is made available to users Better coordination is needed Project engineer has to ensure that all the needs in data of the user of his equipment are taken care of

QUESTIONS? THANK YOU!