Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range.

Slides:



Advertisements
Similar presentations
Trigger & DAQ Ole Hansen SBS Collaboration Meeting 19 March 2010.
Advertisements

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
General Considerations Jian-ping Chen SoLID-SIDIS Collaboration Meeting.
Update on GEM Activities for the 12 GeV Program in Hall A at JLab
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
SBS Budget A Staged Approach John J. LeRose Hall A Collaboration Meeting December 10, 2010.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
Who am I? ● Daniel John Kirby ● Carnegie Mellon Physics Class of 2013 ● In Hall A June-July 2012.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
Wang Yi, Tsinghua University Joint meeting of HALL A and HALL C, SoLID status and Chinese contribution 1 Wang Yi Department of Engineering.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
SoLID: large acceptance, capable of handling high luminosity (up to~10 39 with baffle, up to ~10 37 without baffle)  Ideal for precision Inclusive-DIS.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Possibility for Double DVCS measurement in Hall A Alexandre Camsonne SBS Meeting June 4 th 2013.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Large acceptance magnetic spectrometer for the 12 GeV 2 GEp experiment (at Jefferson Lab) E. Cisbani INFN Rome – Sanità Group and Italian National Institute.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
SuperBigbite DAQ and Trigger electronics Alexandre Camsonne Hall A Jefferson Laboratory SBS Review.
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
10/09/10FV 1 News and observations from Brussels' meeting.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
A Staged approach to the Super Bigbite Project The Super Bigbite Project is designed to provide precision measurements of the nucleon form factors G E.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Update on SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting November 8-9, 2013.
18 Oct 2010 / PSHP / Frascati E. Cisbani: JLab/Hall A April Frascati Probing Strangeness in Hard Processes Kaon SIDIS experiments.
Electronics for GEM R&D at the University of Virginia
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Preparation for CERN test beam
CMS Goal of the experiment
Example of DAQ Trigger issues for the SoLID experiment
CLAS12 Timing Calibration
The HERMES RICH as SBS hadron identification detector
GEANT Simulations and Track Reconstruction
Gep/SANE this week – quick overview
Physics program in Hall A for the CEBAF 12 GeV era
What is μ-e Conversion ? μ μ-+(A,Z)→e-+(A,Z) muon decay in orbit
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range nucleon structure ( C. Weiss ) 30’ + 5’ 9:45-10:20 SIDIS (Andrew) 30’ + 5’ 10:20-10:35 Coffee Break 10:30-11:30 All hands meeting 60’ 11:30-11:55 A1n ( Nilanga ) 20’ + 5’ 11:55-12:20 RCS ALL ( David ) 20’ + 5’ 12:20-13:30 Lunch 13:30-13:55 Hall A status ( Cynthia ) 20’ + 5’ 13:55-14:40 SBS design ( Robin ) 30’ + 15’ 14:40-15:25 He3 target ( Gordon ) 30’ + 15’ 15:25-15:25 Coffee break 15:45-16:10 Muon detection ideas with SBS and GEMs ( Alexandre ) 20’ + 5’ 15:10-16:35 HCAL Design ( Vahe ) 20’ + 5’ 16:35-16:50 HCAL Construction ( Greg ) 20’ +5’ 16:50-17:30 Discussion June 3, 2013, SBS collaborationB. Wojtsekhowski June 5 th 9:00-9:25 Fastbus ( Sergey ) 20’ + 5’ 9:25-9:50 NINO Front End ( John ) 20’ + 5’ 9:50-10:15 VME DAQ ( Alexandre ) 20’ + 5’ 10:15-10:30 Coffee Break 10:30-10:55 Electronics ( Chris ) 20’ + 5’ 10:55-11:20 Coordinate detector ( Adam ) 20’+5’ 11:20-11:45 ECAL status ( Mark ) 20’ + 5’ 11:45-12:10 Silicon tracker ( Guido ) 20’ + 5’ 12:10-13:30 Group picture and Lunch 13:30-14:00 A1n Cherenkov ( Sam ) 25’ + 5’ 14:00-14:30 Collaboration business 14:30-15:00 Manpower/students/Tasks 15:00-15:15 Coffee break 15:15-15:55 GEM INFN ( Paolo/Evaristo) 35’ +5’ 15:55-16:35 GEM UVA ( Nilanga/Kondo ) 35’ +5’ 16:35-17:00 Discussion and adjournment

SBS components (in G E p /G M p ) INFNBN L DOE BigCal 48D48 +/- 25 mrad Gauss June 3, 2013, SBS collaboration2B. Wojtsekhowski

SBS components 3 There are a number of hot topics in each component: 48D48 – many aspects of the design need key input from MC before production drawings can be produced GEM chambers – prototyping, module quality, production yield GEM electronics – performance: level of the noise, readout speed HCAL – from the ideas, components, to a prototype and construction ECAL – not the BigCal, active searching stage DAQ - development, construction, 18 FastBus crate farm He-3 – target conceptual design, Au is too soft for hot Rb atom June 3, 2013, SBS collaborationB. Wojtsekhowski

SBS collaboration 4 The weekly meetings are productive 5/22/2013SBS_min_ pdfMagnet shipping status/FASTBUS and VME DAQ/Collaboration meeting/DNP meetingSBS_min_ pdfMagnet shipping status/FASTBUS and VME DAQ/Collaboration meeting/DNP meeting 5/15/2013SBS_min_ pdfFront Tracker/Back Tracker/Collaboration Charter/Collaboration meeting/ 3 He targetSBS_min_ pdfFront Tracker/Back Tracker/Collaboration Charter/Collaboration meeting/ 3 He target 5/8/2013SBS_min_ pdfGeneral news/Collaboration meeting agenda SBS_min_ pdfGeneral news/Collaboration meeting agenda 5/1/2013SBS_min_ pdfEcal/Dubna tests/HV maintenance/Collaboration meeting SBS_min_ pdfEcal/Dubna tests/HV maintenance/Collaboration meeting 4/24/2013SBS_min_ pdfPolarized 3 He target/Collaboration meeting SBS_min_ pdfPolarized 3 He target/Collaboration meeting 4/17/2013SBS_min_ pdfDesign Status/ Back Tracker GEM at UVa SBS_min_ pdfDesign Status/ Back Tracker GEM at UVa 4/10/2013SBS_min_ pdfFront Tracker GEM & Electronics/Collaboration Meeting/UVa GEM newsSBS_min_ pdfFront Tracker GEM & Electronics/Collaboration Meeting/UVa GEM news 4/3/2013SBS_min_ pdfPara Hydrogen target/Collaboration Meeting/GMn preparations SBS_min_ pdfPara Hydrogen target/Collaboration Meeting/GMn preparations 3/27/2013SBS_min_ pdfGRINCH/GEMS SBS_min_ pdfGRINCH/GEMS 3/20/2013SBS_min_ pdfScintillators for HCAL SBS_min_ pdfScintillators for HCAL 3/13/2013SBS_min_ pdfPion Form Factor/Design Status SBS_min_ pdfPion Form Factor/Design Status 3/6/2013SBS_min_ pdfGEM status at UVa SBS_min_ pdfGEM status at UVa 2/27/2013SBS_min_ pdfDAQ status/Deadtime reduction effort status SBS_min_ pdfDAQ status/Deadtime reduction effort status 2/20/2013SBS_min_ pdfFront Tracker/MPD readout/Magnet and supports status SBS_min_ pdfFront Tracker/MPD readout/Magnet and supports status 2/13/2013SBS_min_ pdfSBS/A1n Polarized 3He Target Update/Monthly Report SBS_min_ pdfSBS/A1n Polarized 3He Target Update/Monthly Report 2/6/2013SBS_min_ pdfHERA B modules/Design Status SBS_min_ pdfHERA B modules/Design Status 1/30/2013SBS_min_ pdfPhoto-multiplier testing/Coordinate detector prototype/Design Status SBS_min_ pdfPhoto-multiplier testing/Coordinate detector prototype/Design Status 1/23/2013SBS_min_ pdfGEM Conditioning/HCAL Developments/GEM status SBS_min_ pdfGEM Conditioning/HCAL Developments/GEM status 1/16/2013SBS_min_ pdfGRINCH/Magnet Modifications and Stand/Research Management Plan SBS_min_ pdfGRINCH/Magnet Modifications and Stand/Research Management Plan 12/12/2012SBS_min_ pdfGEM's at INFN/BNL visit/Coordinate Detector SBS_min_ pdfGEM's at INFN/BNL visit/Coordinate Detector 12/5/2012SBS_min_ pdfGEM's and GEM electronics.SBS_min_ pdfGEM's and GEM electronics. 11/28/2012SBS_min_ pdfDAQ/APS meeting in April (Denver) SBS_min_ pdfDAQ/APS meeting in April (Denver) 11/14/2012SBS_min_ pdfSBS Design Plan/Ecal for GEp5 SBS_min_ pdfSBS Design Plan/Ecal for GEp5 11/7/2012SBS_min_ pdfGEM electromics studies at UVaSBS_min_ pdfGEM electromics studies at UVa June 3, 2013, SBS collaborationB. Wojtsekhowski

SBS in 2009 (2 years old) 5 today 11 GeV beam June 3, 2013, SBS collaborationB. Wojtsekhowski

SBS in 2013 (6 years old) 6 FY13FY14FY15FY16 June 3, 2013, SBS collaborationB. Wojtsekhowski

SBS in 2013 (6 years old) 7 FY13FY14FY15FY16 June 3, 2013, SBS collaborationB. Wojtsekhowski

SBS in 2013 (6 years old) 8 FY14FY15FY16FY17 June 3, 2013, SBS collaborationB. Wojtsekhowski

SBS projects time line 9 today June 3, 2013, SBS collaborationB. Wojtsekhowski

SBS collaboration 10 There is a need for an Experiment Coordination Committee 1) Each experiment accepted to be the SBS collaboration experiment will be presented at the ECC meetings and share the load of work 2) ECC should include a Hall A leader and one representative from each experiment selected by the experiment spokespeople 3) The goal of ECG is to expedite the SBS program and coordinate all efforts in development, running and publication plans/results of SBS. June 3, 2013, SBS collaborationB. Wojtsekhowski

SBS second group of experiments 11 There are several exciting suggestions post FFs: SIDIS – talk by A. Puckett (experiment was approved in 2010) PionSF(s) – see talk by T. Keppel at SBS meeting, 3/13/13 DDVCS (muons) – talk by A. Camsonne June 3, 2013, SBS collaborationB. Wojtsekhowski