Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range nucleon structure ( C. Weiss ) 30’ + 5’ 9:45-10:20 SIDIS (Andrew) 30’ + 5’ 10:20-10:35 Coffee Break 10:30-11:30 All hands meeting 60’ 11:30-11:55 A1n ( Nilanga ) 20’ + 5’ 11:55-12:20 RCS ALL ( David ) 20’ + 5’ 12:20-13:30 Lunch 13:30-13:55 Hall A status ( Cynthia ) 20’ + 5’ 13:55-14:40 SBS design ( Robin ) 30’ + 15’ 14:40-15:25 He3 target ( Gordon ) 30’ + 15’ 15:25-15:25 Coffee break 15:45-16:10 Muon detection ideas with SBS and GEMs ( Alexandre ) 20’ + 5’ 15:10-16:35 HCAL Design ( Vahe ) 20’ + 5’ 16:35-16:50 HCAL Construction ( Greg ) 20’ +5’ 16:50-17:30 Discussion June 3, 2013, SBS collaborationB. Wojtsekhowski June 5 th 9:00-9:25 Fastbus ( Sergey ) 20’ + 5’ 9:25-9:50 NINO Front End ( John ) 20’ + 5’ 9:50-10:15 VME DAQ ( Alexandre ) 20’ + 5’ 10:15-10:30 Coffee Break 10:30-10:55 Electronics ( Chris ) 20’ + 5’ 10:55-11:20 Coordinate detector ( Adam ) 20’+5’ 11:20-11:45 ECAL status ( Mark ) 20’ + 5’ 11:45-12:10 Silicon tracker ( Guido ) 20’ + 5’ 12:10-13:30 Group picture and Lunch 13:30-14:00 A1n Cherenkov ( Sam ) 25’ + 5’ 14:00-14:30 Collaboration business 14:30-15:00 Manpower/students/Tasks 15:00-15:15 Coffee break 15:15-15:55 GEM INFN ( Paolo/Evaristo) 35’ +5’ 15:55-16:35 GEM UVA ( Nilanga/Kondo ) 35’ +5’ 16:35-17:00 Discussion and adjournment
SBS components (in G E p /G M p ) INFNBN L DOE BigCal 48D48 +/- 25 mrad Gauss June 3, 2013, SBS collaboration2B. Wojtsekhowski
SBS components 3 There are a number of hot topics in each component: 48D48 – many aspects of the design need key input from MC before production drawings can be produced GEM chambers – prototyping, module quality, production yield GEM electronics – performance: level of the noise, readout speed HCAL – from the ideas, components, to a prototype and construction ECAL – not the BigCal, active searching stage DAQ - development, construction, 18 FastBus crate farm He-3 – target conceptual design, Au is too soft for hot Rb atom June 3, 2013, SBS collaborationB. Wojtsekhowski
SBS collaboration 4 The weekly meetings are productive 5/22/2013SBS_min_ pdfMagnet shipping status/FASTBUS and VME DAQ/Collaboration meeting/DNP meetingSBS_min_ pdfMagnet shipping status/FASTBUS and VME DAQ/Collaboration meeting/DNP meeting 5/15/2013SBS_min_ pdfFront Tracker/Back Tracker/Collaboration Charter/Collaboration meeting/ 3 He targetSBS_min_ pdfFront Tracker/Back Tracker/Collaboration Charter/Collaboration meeting/ 3 He target 5/8/2013SBS_min_ pdfGeneral news/Collaboration meeting agenda SBS_min_ pdfGeneral news/Collaboration meeting agenda 5/1/2013SBS_min_ pdfEcal/Dubna tests/HV maintenance/Collaboration meeting SBS_min_ pdfEcal/Dubna tests/HV maintenance/Collaboration meeting 4/24/2013SBS_min_ pdfPolarized 3 He target/Collaboration meeting SBS_min_ pdfPolarized 3 He target/Collaboration meeting 4/17/2013SBS_min_ pdfDesign Status/ Back Tracker GEM at UVa SBS_min_ pdfDesign Status/ Back Tracker GEM at UVa 4/10/2013SBS_min_ pdfFront Tracker GEM & Electronics/Collaboration Meeting/UVa GEM newsSBS_min_ pdfFront Tracker GEM & Electronics/Collaboration Meeting/UVa GEM news 4/3/2013SBS_min_ pdfPara Hydrogen target/Collaboration Meeting/GMn preparations SBS_min_ pdfPara Hydrogen target/Collaboration Meeting/GMn preparations 3/27/2013SBS_min_ pdfGRINCH/GEMS SBS_min_ pdfGRINCH/GEMS 3/20/2013SBS_min_ pdfScintillators for HCAL SBS_min_ pdfScintillators for HCAL 3/13/2013SBS_min_ pdfPion Form Factor/Design Status SBS_min_ pdfPion Form Factor/Design Status 3/6/2013SBS_min_ pdfGEM status at UVa SBS_min_ pdfGEM status at UVa 2/27/2013SBS_min_ pdfDAQ status/Deadtime reduction effort status SBS_min_ pdfDAQ status/Deadtime reduction effort status 2/20/2013SBS_min_ pdfFront Tracker/MPD readout/Magnet and supports status SBS_min_ pdfFront Tracker/MPD readout/Magnet and supports status 2/13/2013SBS_min_ pdfSBS/A1n Polarized 3He Target Update/Monthly Report SBS_min_ pdfSBS/A1n Polarized 3He Target Update/Monthly Report 2/6/2013SBS_min_ pdfHERA B modules/Design Status SBS_min_ pdfHERA B modules/Design Status 1/30/2013SBS_min_ pdfPhoto-multiplier testing/Coordinate detector prototype/Design Status SBS_min_ pdfPhoto-multiplier testing/Coordinate detector prototype/Design Status 1/23/2013SBS_min_ pdfGEM Conditioning/HCAL Developments/GEM status SBS_min_ pdfGEM Conditioning/HCAL Developments/GEM status 1/16/2013SBS_min_ pdfGRINCH/Magnet Modifications and Stand/Research Management Plan SBS_min_ pdfGRINCH/Magnet Modifications and Stand/Research Management Plan 12/12/2012SBS_min_ pdfGEM's at INFN/BNL visit/Coordinate Detector SBS_min_ pdfGEM's at INFN/BNL visit/Coordinate Detector 12/5/2012SBS_min_ pdfGEM's and GEM electronics.SBS_min_ pdfGEM's and GEM electronics. 11/28/2012SBS_min_ pdfDAQ/APS meeting in April (Denver) SBS_min_ pdfDAQ/APS meeting in April (Denver) 11/14/2012SBS_min_ pdfSBS Design Plan/Ecal for GEp5 SBS_min_ pdfSBS Design Plan/Ecal for GEp5 11/7/2012SBS_min_ pdfGEM electromics studies at UVaSBS_min_ pdfGEM electromics studies at UVa June 3, 2013, SBS collaborationB. Wojtsekhowski
SBS in 2009 (2 years old) 5 today 11 GeV beam June 3, 2013, SBS collaborationB. Wojtsekhowski
SBS in 2013 (6 years old) 6 FY13FY14FY15FY16 June 3, 2013, SBS collaborationB. Wojtsekhowski
SBS in 2013 (6 years old) 7 FY13FY14FY15FY16 June 3, 2013, SBS collaborationB. Wojtsekhowski
SBS in 2013 (6 years old) 8 FY14FY15FY16FY17 June 3, 2013, SBS collaborationB. Wojtsekhowski
SBS projects time line 9 today June 3, 2013, SBS collaborationB. Wojtsekhowski
SBS collaboration 10 There is a need for an Experiment Coordination Committee 1) Each experiment accepted to be the SBS collaboration experiment will be presented at the ECC meetings and share the load of work 2) ECC should include a Hall A leader and one representative from each experiment selected by the experiment spokespeople 3) The goal of ECG is to expedite the SBS program and coordinate all efforts in development, running and publication plans/results of SBS. June 3, 2013, SBS collaborationB. Wojtsekhowski
SBS second group of experiments 11 There are several exciting suggestions post FFs: SIDIS – talk by A. Puckett (experiment was approved in 2010) PionSF(s) – see talk by T. Keppel at SBS meeting, 3/13/13 DDVCS (muons) – talk by A. Camsonne June 3, 2013, SBS collaborationB. Wojtsekhowski