Are these the right areas to treat? Define Desired Conditions (DCs) for Ecological Restoration and Identify Uncertainties Defined by Front Range Roundtable.

Slides:



Advertisements
Similar presentations
CAPACITY BUILDING Atmospheric observations Laboratory measurements Modeling and data analysis 1.
Advertisements

MAURIZIA TOVO WORLD BANK Whats a good policy?. What is a policy? A set of principles intended to govern actions adopted or proposed by a government, party,
Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
MIM and Adaptive Management. PURPOSE of ADAPTIVE MANAGEMENT: To achieve long- term desired conditions Emphasis should be placed on long-term monitoring.
Great Basin Restoration Initiative GBRI Field Office to On-the Ground Project.
Spruce Beetle Epidemic & Aspen Decline Management Response EIS Adaptive Implementation Process.
Flowchart on Procurement Guidance for a proposed OBA scheme Is the project involving an existing service provider (SP) ? YES NO PROJECT PREPARATION Are.
Scoping in the EIA process Proposal Identification Screening
Audit Committee in Albania Legal framework Law 9226 /2006 “On banks in Republic of Albania” Law 9901/2008 “On entrepreneurs and commercial companies” Corporate.
The exhibition process The phases of an exhibition.
Accounting for the Nonfinancial Manager Chapter 1: Introduction.
Future Research NeedsWorld Heritage and Climate Change World Heritage and Climate Change - Future Research Needs Bastian Bomhard World Heritage Officer.
Structure and Responsibility
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 12 Integration Management Practising a common, coordinated.
Managing Project Procurement
Overview of Grants Process Prof. James Machoki M’Imunya Principal Investigator, IEARDA University of Nairobi, Kenya.
Defining Responsible Forest Management FSC Forest Certification Standards Defining Responsible Forest Management Version:
The Research Proposal. Purpose Guidelines for preparing and evaluating a research brief and proposal Understand the purpose of a research proposal in.
An Auditor’s Perspective
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
US FOREST SERVICE REGIONAL ROUNDTABLE Planning Rule Revision Photographer: Bill Lea.
Inventory, Monitoring, and Assessments A Strategy to Improve the IM&A System Update and Feedback Session with Employees and Partners December 5, 2011.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
» Pay for Performance is a compensation or incentive program that links pay and performance. Employee’s are rewarded for how well they perform their duties.
Vision, Goals, Objectives, and Alternatives. Objectives  Define vision, goals, objectives, and alternatives within the planning context.  Describe collaborator.
© All rights reserved. Front Range Roundtable Project Outline: Wildlife Working Team 1 Rick & Lynne to edit by may meeting Team Scope Roundtable.
Colorado Front Range Collaborative Forest Landscape Restoration Project : Initial Pre and Post-Treatment Stand Structure Analysis for the Pike and San.
UPPER MONUMENT CREEK LANDSCAPE RESTORATION Allan Hahn – District Ranger Mike Picard – ID Team Leader.
Improving Quality and Reducing Risks Positive and Powerful Quality Assessment.
Proposed Action Purpose and Need A proposal to authorize, recommend, or implement an action in response to the need identified in the Purpose and Need.
UT-Arlington Accounting CPE Day August 13, 2014 SEFA Preparation and Subrecipient Monitoring.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Workflow Description Roles and Responsibilities DEVA Data Management Workshop Devil’s Hole Pupfish Project Project Managemen t!?!
European Commission Biodiversity and Nature Conservation in the EU today – Business & Biodiversity Alexandra Vakrou, EC, DG Environment IEF European Roundtable.
March 2008 FY 2008 Hazardous Fuels Program Direction Unified Targets/Accomplishments.
UNEP Training Resource ManualTopic 7 Slide 1 The purpose of mitigation is to: F find better ways of doing things F enhance environmental and social benefits.
© All rights reserved. Front Range Roundtable Project Outline: Landscape Restoration Team CY 2014 Goals CY 2014 Deliverables Scope Why this? Why.
Front Range CFLRP 2013 Social-Economic Monitoring Results Front Range Roundtable DATE Kathie Mattor and Tony Cheng Colorado Forest Restoration Institute.
Project design criteria met? Project Implementation “During” Project Monitoring “Post” Project Monitoring (IDT) Project Preparation Project Planning NEPA.
Adaptive Management and the Delta Plan “Include a science-based, transparent, and formal adaptive management strategy for ongoing ecosystem restoration.
Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 Topic 11 Executing & Controlling Projects.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
 Role Activity Diagrams E-Business Process Decision Support  Focus on analysis and monitoring of e-business processes  Multidimensional analysis (OLAP.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Central Sierra Interagency Resource Advisor Training Wildland Fire Implementation Plan Mike Beasley Fire Use Manager Yosemite National Park
Intervention and Support Inclusion Questions. Early and Strategic  How does the school provide purposeful early intervention and support to lift the.
Managing the Planning Process 1. ____ is a system designed to identify objectives and to structure the major tasks of the organization to accomplish them.
© Tesseract Management Systems / Managing by Design / Development Process These slides provide an outline structure for a development process.
Monitoring and Evaluation. Objective Identify appropriate monitoring techniques. Identify approaches to evaluating plan implementation and effectiveness.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Minnesota Drinking Water Designated Use Assessment Workshop Tom Poleck EPA Region 5, Water Quality Branch May 20-21,
What is Good Monitoring? Environmental Evaluator’s Network Ottawa, September 2010.
Consolidated Plan Programs Universal Application Process Budget & Financial Analysis Mandatory Workshop March 24, :00 p.m. 1 Laura Stagner Director.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
Empowering Tomorrow’s Conservation Ambassadors Today.
An Auditor’s Perspective Jeani Allen Director of Internal Audit.
Origin  On October 18, 1997 – 25 th Anniversary of Clean Water Act – Federal agencies were asked to rededicate their efforts to cleaning up the Nations.
BU Marketing Manager Purpose The BU Marketing Manager is responsible for the implementation and quality of standards within Marketing throughout the Business.
MGT 431 Week 3 Learning Team Development and Training Paper To purchase this material click below link
Prescribed Fire Effects Monitoring
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Requirement Change Control Procedure
الدليل التدريبي للتقييم البيئي المتكامل للمنطقة العربية
Assistant Staff Director Office of Contracted Client Services
Forest Planning Under the 2012 Planning Rule
Technical Advisory Committee
MODULE 7 Definitions Module 7 page 1.
Presentation transcript:

Are these the right areas to treat? Define Desired Conditions (DCs) for Ecological Restoration and Identify Uncertainties Defined by Front Range Roundtable (currently Landscape Restoration Team) and Agencies Problem Statement: To Sustain Front Range Montane Ecosystems and Support Associated Social/Economic Systems No Are DCs and Uncertainties defined correctly? Is the problem defined correctly? No Data Compilation, Analysis, and Evaluation External/ Internal Research External/ Internal Research Yes Was project implemented as designed? Project Planning/NEPA Post-Treatment Monitoring Are we monitoring the right things? Is monitoring effective? Effectiveness Monitoring No Was project prepared as designed? Were design criteria feasible? Modify Project Implementation Monitoring No Yes Are contract design criteria being met? Modify Contract Yes No Yes Are treatments contributing to DCs? No During-Project Monitoring Adaptive Monitoring Contract/Task Order/Treatment Preparation Define Restoration Areas Proposed by Agencies; agreed to by Front Range Roundtable (pre-NEPA) Define Restoration Actions and Treatments Defined by Front Range Roundtable; agreed to by Agencies Develop/Modify Monitoring Plan Pre-Treatment Monitoring Were thresholds/ trigger points exceeded? Project Implementation Yes No

Are these the right areas to treat? Are treatments contributing to DCs? Define Desired Conditions (DCs) for Ecological Restoration and Identify Uncertainties Defined by Front Range Roundtable* and Agencies Define Restoration Areas Proposed by Agencies; agreed to by Front Range Roundtable (pre-NEPA ) Project Planning/ NEPA Problem Statement: To Sustain Front Range Montane Ecosystems and Support Associated Social/Economic Systems No Yes Are DCs and uncertainties defined correctly? Is the problem defined correctly? No Post-Treatment Monitoring Data Compilation, Analysis, and Evaluation * Currently delegated to the Landscape Restoration Team Are we monitoring the right things? Is monitoring effective? Effectiveness monitoring: long- term, landscape-scale External/ Internal Research External/ Internal Research Adaptive monitoring: Continual and long term No ** See Implementation Monitoring diagram and explanation in accompanying text Contract/Task Order/Treatment Preparation Define Restoration Actions/Treatments Defined by Front Range Roundtable; agreed to by Agencies Develop/Modify Monitoring Plan Yes Project Implementation and Implementation Monitoring** Pre-Treatment Monitoring Yes

Project Planning, NEPA Project Implementation Pre-Treatment Monitoring Post-Treatment Monitoring Analysis and Evaluation Project (Treatment) Preparation Are contract design criteria being met? If not, ensure compliance, or modify or cancel contract. Contract Administration (“During-project” Monitoring) Implementation Monitoring Diagram (with trigger points) Post-project Monitoring Was project implemented as designed? No Was project prepared as designed? Were design criteria feasible? Ensure preparer and implementer understand project purpose and design. No Redesign project. Were thresholds/trigger points exceeded? Yes No Yes