FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.

Slides:



Advertisements
Similar presentations
Erdem Oz* USC E-164X,E167 Collaboration Plasma Dark Current in Self-Ionized Plasma Wake Field Accelerators
Advertisements

Wakefield Acceleration in Dielectric Structures J.B. Rosenzweig UCLA Dept. of Physics and Astronomy The Physics and Applications of High Brightness Electron.
FACET Facility Performance FY13 Christine Clarke, 25 th July 2013 SAREC Meeting.
1 E206 Terahertz Radiation from the FACET Beam SAREC Review SLAC 2013 July 26 Alan Fisher and Ziran Wu SLAC National Accelerator Laboratory.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
A Proof-of Principle Study of 2D optical streaking for ultra-short e-beam diagnostics using ionization electrons & circular polarized laser Lanfa Wang.
UCLA Experiments with short single e-bunch using preformed and beam ionized plasma Retain ability to run short single bunch with pre-ionized plasma Ken.
Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki,
Hollow Channel Plasma Wakefield Acceleration Spencer Gessner 5 th SAREC Review September 15 th, 2014.
FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
Introduction to this Workshop Christine Clarke August 29 th 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
TEST BEAMS Stanford Linear Accelerator Center Ted Fieguth DoE/SLAC Program Review April & May 1, 1997.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 28-Jan
CLIC programme at FACET Update on CERN-BBA A. Latina, J. Pfingstner, G. De Michele, D. Schulte (CERN) E. Adli (Univ. of Oslo), J. Resta Lopez (IFIC) In.
FACET Machine Performance and Expectations M. Sullivan for the FACET Accelerator group SAREC Review July 25, 2013.
FACET II Project – User Area Christine Clarke 26 th June 2015.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Plasmas, Dielectrics and the Ultrafast: First Science and Operational Experience at FACET Christine Clarke 13 th September 2012 LINAC12, Tel-Aviv, Israel.
Dielectric Wakefield Accelerator for an X-ray FEL User Facility
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
E-217 FACET users meeting 9/15/14 Ken Marsh. What happens to the experiment when laser fires full power in Lithium? Do we ionize the helium buffer zones?
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
AboutFACET What is FACET Current Research PUBLICATIONS NAVIGATE UP Dielectric Wakefields.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
PROBLEM 1 Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Terahertz Generation at FACET, and Potential Enhancement at FACET-II Ziran Wu, Alan Fisher, Matthias Hoffmann, Mike Litos Steve Edstrom, Christine Clarke,
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Beam-Plasma Working Group Summary Barnes, Bruhwiler, DavidTech-X Clayton,
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Dielectric Wakefield Accelerators at FACET (II) Brendan O’Shea October 15 th, 2015.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 18/06/2015 High Gradient work shop 2015.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Coherent THz radiation source driven by pre-bunched electron beam
High Gradient Dielectric Wakefield Experiments Brendan O’Shea, Oliver Williams, Gerard Andonian, Jere Harrison, Kristin Fitzmorris, James Rosenzweig, Mark.
of High-Energy, High-Density Electron and Positron Beams
Sara Thorin, MAX IV Laboratory
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
The FACET Facility at SLAC
Test of Notch Collimator - December 2005
Instrumentation CALIFES ideal for tests and development that requires frequent access to test setup. CERN BI members already using CALIFES and want to.
Beam Optics Set-Up at SLAC End Station A
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
End Station Test Beam (ESTB) at SLAC
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
FACET Accelerator Overview
Linac/BC1 Commissioning P
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
FACET Accelerator Overview
Diagnostics RF and Feedback
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Presentation transcript:

FACET Update ARD Status Meeting Christine Clarke April 14 th 2011

FACET Update Page 2 The FACET Project Facilities for Accelerator science and Experimental Test beams. FACET ESA ESB

Beam at FACET FACET Update Page 3 At IP FACET uses the first two-thirds of the linac Energy = 23 GeV 3.2 nC Sigma x = 14 um Sigma y = 6 um Sigma z = 14 um minimum (20 um typical) Bunch length can be increased up to a factor of 3 Electron beam (2011)

The Facility FACET Update Page 4 Stairway in Sector 19 User Trailer ExperimentsDump Towards end of linac Beam Direction

Plan – THz and IP Tables FACET Update Page 5 Optical Tables for experimenters to mount hardware Optics set up for each experiment Small beam spots in IP region THz Table (Experimental Area 1) IP Table (Experimental Area 2) Beam Direction

THz and IP Optical Tables FACET Update Page 6 THz Table (looking east towards dump) IP Table (looking east towards dump) Photos taken Feb 11 (Mark Hogan) Magnets installed since then.

March… Some magnets installed in sector 20 – photo taken March 16 th : FACET Update Page 7 THz Table (looking east towards dump) IP Table

April… All magnets in sector 20 – photo taken last Tuesday : FACET Update Page 8 THz Table (looking east towards dump) IP Table

Close-up of THz Beamline almost complete FACET Update Page 9 Initial THz diagnostics with OTR foils (1um titanium) Cubes Beam here large in x (>1mm) Future location of Smith-Purcell experiment.

Close-up of IP Table Could be complete end of next week FACET Update Page 10 IP experiments located here (second table to come). For tuning, vacuum drifts, wire scanner and OTR screens.

SAREC Final Report SLAC Accelerator Research Experimental program Committee Convened in January to review 8 proposals 6 proposals accepted as Experimental Programs 1 proposal incorporated into FACET diagnostics (ODR) 1 letter of intent – requested to present two proposals in the next round. 1 expression of interest – asked to make preliminary measurements this summer (THz). Second call for proposals this fall for the spring 2012 and 2013 runs SAREC review in the early winter of FACET Update Page 11

Plasma Wakefield Acceleration FACET Update Page 12 Continuation of very successful FFTB experiments Heat-pipe oven to be installed this July Lithium metal vaporized at 800ºC Length of plasma controllable by controlling heaters and pressure of helium buffer gas Phase One: Begin with single electron bunch in field ionized lithium plasma. Phase Two: Single bunch in field ionized cesium plasma. Phase Three: Use Notch Collimator. Phase Four: Two electron bunches (drive and witness) in field ionized cesium plasma. After first year, pre-ionized plasma, positrons, positrons and electrons.

Smith Purcell FACET Update Page 13 Bunch Time Profile measurements with Coherent Smith-Purcell Radiation Moderate band-width terahertz Beam passes by grating which has a dispersive effect Continuation of experiment at ESA Not sensitive to beam spot size (will be situated upstream of IP). Non-destructive (parasitic running).

Wakefield Acceleration in Dielectric Structures FACET Update Page 14 GV/m class DWA for use in linear colliders and future light sources. Previous work at FFTB/SLAC, UCLA, BNL. High gradient regime at FACET. FACET beam sent through prototype dielectric wakefield acceleration structures. Parametric breakdown studies and lifetime effects. Vary structures (dimensions, materials etc). Use drive and witness bunches to observe acceleration. Use coherent Cerenkov radiation Next year, use protons.

Ultrafast Magnetic Switching Continuation of FFTB work. Change in magnetization of a sample on ultrafast timescales Change pulse-lengths with constant Q - do longer pulse-lengths have more energy deposition? Expose sample to electron bunch Then image with spin-sensitive scanning electron microscope. Different patterns on same film indicate different physical processes. Chaos cannot be explained Need to rule out experimental artefacts. FACET Update Page ps 70fs

Additional Experiments Metallic Periodic Structures (Accepted Proposal) –Short-pulse, high fields to study breakdown physics. High gradient dielectric wakefield measurements (Accepted Proposal) –dielectric based collimating systems CLIC Studies (letter of intent) –Dispersion-free steering –Accelerating structure Wakefield Studies –Collimator Wakefield Studies THz extraction (expression of interest) –Extract radiation to an experimental area FACET Update Page 16 30cm High Power test structure (CLIC Studies) Suggested extraction of THz Short Metallic Accelerating Structure

Schedule 2011 Construction Phase 1 will be complete in May. Beam Commissioning starts June 13 th Experiments are installed July 5 th - July 14 th Experimental program in August Users meeting August 29 th /30 th Next round of proposals coming up (fall) Construction Phase 2… positron arm of the bunch compressor in S10 Experimental PPS zone FACET Update Page 17

Schedule 2012 and Beyond FACET will run for 4 months each year for the next five years. In 2012 the 4 months are likely to be February - June. Electron beams and positron beams will be available to the experimenters. 2013? Phase Three: positron arm of the bunch compressor in S20 (aka the sailboat chicane) for simultaneous electron and positron beams FACET Update Page 18

Summary FACET is currently near the end of its primary construction phase. First Beam June 13 th Approximately 3 weeks of beam commissioning, some User assistance. User aided commissioning / experiment commissioning program, August. New round of proposals for 2012 due (provisionally) October. 4 months of FACET running in 2012 and every year until FACET Update Page 19