DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275,000.00 Roof Replacement - High School750,000.00.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

Planning an athletic facility project for Middle School Kids! Ms. Pauleys 8 th Grade Math – CTMS April 18, 2013.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Buckman Heights Elementary School Fire Report Presented by: Mr. Donald Mellema Facilities Manager Greece Central School District.
 Board of Trustees - Reviewed and prioritized the needs from previous MISD facility assessment and programmatic changes in curricular and extracurricular.
January,  Built School is 22 years old  1997 – 1 st Expansion of School › Additions: New Shop, Wolverine Lounge, › Remodeled/relocated.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Oconto Falls School District Phase II Discussion November 11, 2013.
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
Bond Election Presentation 2014 Webb Consolidated ISD.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Proposed Budget Presentation APRIL 21, 2015.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
HISTORICAL INFORMATION Professional Staff at Peak of Enrollment 1 Superintendent 1 Assistant Superintendent 1 Director of Secondary Education.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Natick Public Schools Technology Update October 6, 2008 Dennis Roche, CISA Director of Technology.
Projects, Facts and Figures 1. Agenda A. Anticipated Use of Bond Funds B. Explanation of Texas’ Taxing Structure C. Tax Impact and History D. Election.
Capital Improvement Program for September 9, 2014.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
SUMMER 2015 DEFERRED MAINTENANCE
Learning, Health, and Safety Capital Project Alternates and Change Order
Facilities Committee Update August 25, Overview August-September, 2014: Tour of District Board, Superintendent, principals, and B&G toured our schools.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Grafton Public Schools. Extraordinary Expenses Additional Classrooms Additional/ Replacement Furniture Added Security Devices Replace Rotted Grease Trap.
Facilities Department Town of Duxbury, MA FY17 Capital Project Request Presentation & Ten Year Capital Improvement Plan To The Finance Committee & Fiscal.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Technology & Curriculum Building & Grounds January 8, 2015.
San Francisco Fire Department Facilities Update.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Facilities Focus Group
Cuba-Rushford CSD Capital Project
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
Five Year Capital Projects Plan Through
Cornwall Central School District
Strategic Planning & Operations
Fennville Public Schools
VCSD Capital Project Forum
Dr. Joseph Meloche Superintendent of Schools Mrs
Plant & Facilities Department
Caryl School Open Hearing March 26, 2007.
The summer of 2018 and all the work that has taken place
Facilities Modernization Program
2018 Bond Review and Proposal
Loudenslager Elementary School Pointing and Brick Repair.
Capital Outlay Workshop
Recent Bond Accomplishments
Mount Vernon Community School
EAST PENNSBORO AREA SCHOOL DISTRICT
Moving from Consumers to Producers Kings Park Central School District
Dixon Middle School Project Update
Presentation transcript:

DEDHAM PUBLIC SCHOOLS

FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750, Middle/High School Library book Acquisition 19, Additional 15 parking spaces at the West End side of the High School200, DHS - Communication/ Security System 215, Exterior Door Replacement/Security - DHS (Phase II) 55, Masonry Repairs - Elementary Schools 100, Boiler Replacement - Oakdale 230, High School Café 120, Replacement of Auditorium Steps - DHS 55, Roof Replacement - Dexter 265, TOTAL 1,225, , ,000.00

District Education Technology Program Replacement of 1996 Maintenance Van Middle/High School Library book Acquisition Bobcat Toolcat Service-Fuel Storage Tanks Elementary Storage Sheds (Capen,Oakdale,Riverdale) Roof Replacement Dexter (Phase II) Repair Gym Ceilings (Greenlodge, Oakdale, Riverdale) Elementary Furniture (Student desk and chairs) 310 students 4th & 5th grades Boiler Replacement - Dexter Painting Elementary Window Replacement - Greenlodge Window Replacement - Capen Replacement of Gutters & Soffits Oakdale School High School Generator Café Boys & Girls Locker room area (Athletic Department) Athletic Field Lights Furniture (Student desk and chairs) Boiler Replacement

Capital Project FY 2011 Request Education Technology Program 275, Middle/High School Library book Acquisition 70, High School Café 208, Roof Replacement - Dexter (Phase 2) 225, Storage Sheds (Capen,Oakdale,Riverdale) 45, Elementary Furniture (Student desk and chairs) 310 students 4th & 5th grades 40, Replacement of 1996 Maintenance Van$19, Fuel Storage Tanks Maintenance 26, Repair Gym Ceilings (Greenlodge, Oakdale, Riverdale)$48, High School Furniture (Student desk and chairs) 28, TOTAL 986,132.80

 Replacement of 275 desktop and laptop computers.  5-year warranty  Windows 7  Estimated $900- $1,000/each  Depending on cost: Backup Device  20 x expansion  Data Deduplication  Replication

 Need for consistent funding  Approximately $25,000 at high school and middle school annually (over 10 years)  Each elementary school $5,000 (over 10 years)  NEASC accreditation  High school and middle school next year (look for regular funding of appropriate resources)  70% of collection purchased during last 10 years  Electronic considerations including Copyright

Total Capital Request 10/11  Walk In Refrigeration and Freezers$86,531  Deli Station$ 8,625  Slicer$ 4,650  Convection Ovens$40,180  Mixer$ 4,354  Ceiling Soffits$24,000  Cafeteria Tables$40,000______ Total$208,340

Phase Two  Complete original roof replacement project  Replace drain not working properly causing water back up on the roof  Repair lap seams which allow water to enter the building  Replace EPDM roofing system which is currently 5 years beyond its life expectancy (18yrs. Old)

 Oakdale  Capen  Riverdale Letter from Bldg Inspector states storage situation for gas fired equipment is unsafe.

 4 th & 5 th grade classroom furniture for  Greenlodge  Oakdale  Riverdale 310 desks at $99.00 per desk 310 chairs at $29.95 per chair

 Undercarriage is rotted  Weight of tools and supplies cannot be supported by this van  Front end is not aligned  Interior is leaking  Monthly service expenses incurred

State requires underground fuel tanks to be inspected every five years: Dexter $2,295 Greenlodge 995 Capen 3,550 Riverdale 6,700 High School 5,365 Oakdale #1 4,880 Oakdale #2 3,280

 Ceiling tiles are unsafe  Existing tiles are approximately fifty to sixty years old  Deterioration is due to water infiltration through the roof system  Ongoing damage sustained from sports activities during gym use

 30 18x96 seminar tables at a cost of $229 per table $6,870  90 Chairs with book rack at a cost of $60 per chair $5,400  50 large Tablet Desk Combination with basket at a cost of $115 per unit $5,750  30 armless chairs for the guidance suite at a cost of $75 per chair $2,250  20-6ft x4ft whiteboards at $175 each $3,500  Furniture for faculty $4,500