DTP 10 th meeting – Geneva 6 th June 2012 Update on the execution status of Validation Phase 2 Validation Task Force WLTP-DTP-10-05.

Slides:



Advertisements
Similar presentations
WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants DTP12 - Status Report and Open Issues WLTP-DTP-AP Status Report and Open issues.
Advertisements

Worldwide Harmonised Test Procedure for Light Duty Vehicles WLTP EVE 2nd Session 13 of September Per Öhlund Co-chair Subgroup EV.
WLTP-DTP DTP Meeting 1 Wrap-up Reviewed general considerations, methodology and timing Reviewed proposals Created initial working subgroups Preparations.
Informal document No. GRPE (63rd GRPE, Jan. 2012, agenda item 3(a)) 1 1 Progress Report of World-wide Light-duty Test Cycle Prepared by DHC.
WLTP-E-Lab Sub Group Test procedure
Informal document No. GRPE (62nd GRPE, 9-10 June 2011, agenda item 3(a)) 1 Summary of 8 th WLTP-DHC Meeting 9 June 2011 Palais des Nations, Geneva.
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
WLTP-DHC Current status of WLTP-DHC & Mode Construction Prepared by Japan the 16 th DHC group under GRPE/WLTP informal group 15 th Jan Palais.
Igor Trpevski University of St. Cyril and Methodius Skopje,
BIODIESEL FLEET in PUBLIC WORKS OPERATIONS NASSAU COUNTY DEPT OF PUBLIC WORKS THOMAS R SUOZZI COUNTY EXECUTIVE RAY RIBEIRO, P.E. COMMISSIONER.
WLTP-DHC Current status of WLTP-DHC & Mode Construction Prepared by DHC Secretary the 18 th DHC meeting under GRPE/WLTP informal group 5 th Jun.
Volvo Technology AB / Volvo Technology Corporation Dept / UW / 03/11/2015 / page 1 Particulates, Lemnos, 2003 Deliverable 13 Effects on particulate.
1 Discussion paper on Mode Construction during Validation 2 Prepared by Japan DHC group under GRPE/WLTP informal group November 2011 WLTP-DTP-LabProcICE-108.
1 Mr H A Nakhawa, ARAI, Pune, India 13 th DHC Informal Group Meeting 64 th GRPE Session, June 2012 Geneva Validation 1 results of Indian Vehicles on LPVC.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 22nd WHDC, Geneva, 16 January 2008 GRPE/WHDC/FE08 Informal document No.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
DTP/DHC update. DTP 13 th to 15 th April, EPA, Ann Arbor Chair: Michael Olechiw (co-chair from India unable to attend) No great advances were made in.
WLTP 9th DTP Meeting Bern, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
Brussels, 22 September 2009 – 101st MVEG 1 WLTP – DHC Results of Validation Phase 1.b
HDH 13 th - Summary. The universities and JARI presented methods for matching the work of the WHVC with the WHTC but smoothing the instantaneous power.
Proposed by Japan GRPE/WLTP-IG/ DHC subgroup
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.
12 April th DTP Meeting WLTP-DHC Secretary WLTP-DTP DHC Progress Report 12 April 2011 EMPA, Duebendorf, Switzerland WLTP-DHC Secretary N.
Summary of 3 rd Informal Group on WLTP 11 June 2009 Palais des Nations, Geneva Informal document No. GRPE (58th GRPE, 9-12 June 2009, agenda item.
Brussels, 22 September 2009 – 101st MVEG 1 WLTP – DHC Results of Validation Phase 1 tests (drivability of the new test cycle)
OICA CO 2 Impact through Weight Variation on Light duty Vehicles WLTP DTP6, Geneva OICA, Volkswagen WLTP-DTP-LabProcICE-076.
Additional ASEP data GRB IG ASEP sept 2007 By the Netherlands.
WLTP-DTP Results from DTP Session 1. WLTP-DTP First Test Procedure Meeting Overview  Hosted by USEPA in Ann Arbor on the 13 th, 14th, and.
2013 年 6 月 12 日 所内フォーラム nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half WLTP-gtr.
Submitted by the expert from Japan the secretariat
WLTP - Validation Phase 2 (acceptability of the new test procedure)
Progress Report of World-wide Light-duty Test Cycle
WLTP Phase 2 Durability Task Force Update
Position paper on Mode Construction during Validation 2
Informal Group on Gaseous Fuelled Vehicles (GFV)
Progress Report of World-wide Light-duty Test Cycle
76th UNECE GRPE session PMP IWG Progress Report
Air Pollution Control and NIR Division
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
Light Duty-PMP-2017/2018 Sub23nm Round Robin
WLTP DTP PM-PN Subgroup Activity Report
وحید فیروزمند موضوع: ارائه دهنده:
Zissis Samaras Professor
SCHEDULING Shipment of equipment to UTAC : until july the 31th
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077
Air Pollution Control and NIR Division
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Current status of WLTP-DHC
Influence of the Temperature over CO2 Emissions (First Results)
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Development of World-wide Light-duty Test Cycle
Informal Group on Gaseous Fuelled Vehicles (GFV)
WLTP-DTP Subgroup Additional Pollutants VP2 Results
Emissions testing in the laboratory and on the road: Preliminary results for one Euro 6 diesel vehicle Pierre Bonnel Martin Weiss Joint Research Centre.
Position paper on Mode Construction during Validation 2
WLTP-DTP Subgroup Additional Pollutants VP2 Results & Open Issues
Revision of the Work Plan
Pilot project: Analysis of the relevance of influencing factors when determining CO2 emissions and fuel consumption during type approval of passenger cars.
Sensitivity Analysis Update
GRPE/WLTP-IG/ DHC subgroup
Working Paper No. WLTP-05-11e
Air Pollution Control and NIR Division
Informal document GRPE-79-20
GRPE/WLTP-IG/ DHC subgroup
Discussion paper on Applicable Test Cycle and Mode Construction
Discussion paper on Applicable Test Cycle and Mode Construction
Working Group “Real-Driving Emissions of Light-Duty Vehicles” Work Progress – December
Discussion document on Mode Construction
Palais des Nations, Geneva
GRPE/WLTP-IG/ DHC subgroup
Presentation transcript:

DTP 10 th meeting – Geneva 6 th June 2012 Update on the execution status of Validation Phase 2 Validation Task Force WLTP-DTP-10-05

On 16 April 2012 the first Info Package was uploaded to JRC ftp server (folder 18) and the VP2 experimental tests on ICE vehicles started. On 15 May 2012 a new Info Package was uploaded, with instructions also for EV/HEV vehicles. This date can be considered as the starting date for the VP2 tests on EV/HEV. Concerning Validation 1 tests on Low Powered Vehicles (Class 1 and Class 2 driving cycle), India delegation has presented an update at 13 th DHC meeting (5 June 2012).

Laboratory/Company Vehicle 1 TNO Gasoline Passenger Car Direct Injection (High pmr) Engine 1.6 THP (115 kW) With Test Mass High (TMH) Baseline Test 1.3 (*) Evaluation Item: - Mode construction (Cold - Hot start) PM/PN (normal) 1.3 & PM/PN (during regeneration) Not applicable - Class 2 test cycle Not applicable With Test Mass Low (TML) Baseline Test 1.3 (*) Evaluation Item: - Mode construction (Cold - Hot start) PM/PN (normal) 3.3 & PM/PN (during regeneration) Not applicable - Class 2 test cycle Not applicable (*) 1.3 (1=test number; 3= test repetitions) (experimental activity will be completed by 6 th July 2012)

Laboratory/Company Vehicle 1Vehicle 2Vehicle 3 IAV Diesel Passenger Car (High pmr) Gasoline Passenger Car Direct Injection (High pmr) Light Commercial CNG Vehicle (High pmr) finishedKW 23/ finished at With Test Mass High (TMH) Baseline Test (CNG-H) Evaluation Item: - Mode construction (Cold - Hot start) PM/PN (normal) PM/PN (1 filter for all or each phasel) two reference fuel (CNG-L) 4.3 (CNG-L) - PM/PN (during regeneration) Not applicable - Class 2 test cycle Not applicable No With Test Mass Low (TML) Evaluation Item: - Vehicle weight No - Mode construction (Cold - Hot start) No - PM/PN (normal) No - PM/PN (during regeneration) No - Class 2 test cycle No (*) 1.3 (1=test number; 3= test repetitions) (experimental activity will be completed by end of June 2012)

Laboratory / Company Vehicle 1Vehicle 2Vehicle 3 AFHB (CH) Gasoline Passenger Car Port Injection (Medium pmr) Gasoline Passenger Car Direct Injection (Medium pmr) Diesel Passenger Car (Medium pmr) With Test Mass High (TMH) Baseline Test Planned Evaluation Item: - Mode construction (Cold - Hot start) Planned - PM/PN (normal) Not applicablePlanned - PM/PN (during regeneration) Not applicable No - Class 2 test cycle Not applicable No With Test Mass Low (TML) Evaluation Item: - Vehicle weight No - Mode construction (Cold - Hot start) No - PM/PN (normal) No - PM/PN (during regeneration) No - Class 2 test cycle No

Laboratory/Company Vehicle 1Vehicle 2Vehicle 3 Empa (CH) Preparation: July 2012 Testing: July/August 2012 Gasoline Passenger Car Direct Injection (High pmr) Gasoline Passenger Car Indirect Injection (High pmr) CNG Passenger Car Indirect Injection (High pmr) With Test Mass High (TMH) Baseline Test Planned Evaluation Item: - Mode construction (Cold - Hot start) Planned - PM/PN (normal) Planned - PM/PN (during regeneration) Not applicable - Class 2 test cycle Not applicable With Test Mass Low (TML) Evaluation Item: - Vehicle weight Plannedif time is available - Mode construction (Cold - Hot start) Plannedif time is available - PM/PN (normal) Plannedif time is available - PM/PN (during regeneration) Not applicable - Class 2 test cycle Not applicable

Laboratory/Company Vehicle 1Vehicle 2Vehicle 3Vehicle 4Vehicle 5Vehicle 6 AECC Tests to be completed by mid- August Diesel passenger car (High pmr) Gasoline passenger car Direct Injection (High pmr) Gasoline passenger car Direct Injection (high pmr) Diesel passenger car (High pmr) Gasoline passenger car Direct Injection (medium pmr) Gasoline hybrid passenger car (NOVC) (High pmr) With Test Mass High (TMH) Baseline Test *Planned Evaluation Item: - Mode construction (Cold - Hot start) *Planned - PM/PN (normal) *Planned - PM/PN (during regeneration) NoNot applicable NoNot applicable - AP (NO 2, NH 3, N 2 O) *Planned - Class 2 test cycle Not applicable No

Laboratory/Company Vehicle 1Vehicle 2 UTAC Diesel Passenger Car (High pmr) only if time is available With Test Mass High (TMH) Baseline Test Planned? Evaluation Item: - Mode construction (Cold - Hot start) Planned? - PM/PN (normal) Planned? - N2O and NH3 Planned? - PM filter stabilization Planned? With Test Mass Low (TML) Evaluation Item: - Vehicle weight No - Mode construction (Cold - Hot start) No - PM/PN (normal) No - PM/PN (during regeneration) No - Class 2 test cycle No (experimental activity will be completed by end of June 2012)

Laboratory/Company Vehicle 1Vehicle 2 JRC Gasoline Passenger Car Direct Injection (High pmr) Light Commercial Diesel Vehicle (Medium pmr) Diesel Passenger Car (High pmr) With Test Mass High (TMH) Baseline Test 1.3 (*) 5.3Planned Evaluation Item: - Mode construction (Cold - Hot start) Planned - PM/PN (normal) 1.3 & & 6.3Planned - PM/PN (during regeneration) Not applicableNo (Euro 4 - No DPF)Planned - Class 2 test cycle Not applicableNot necessaryNot applicable With Test Mass Low (TML) Evaluation Item: - Vehicle weight 3.3No - Mode construction (Cold - Hot start) 4.3No - PM/PN (normal) 3.3 & 4.3No - PM/PN (during regeneration) Not applicableNo - Class 2 test cycle Not applicableNo

Bosmal (Poland) : VP2 tests have started and current plan is to complete them by end of July, as agreed at 2 nd VTF+PLs meeting in Ispra. Dekra and TUEF (Germany): VP2 tests are ongoing and should be completed by end of July. Japan Laboratories (report from Ichikawa-san) ACEA Laboratories (report from W. Thiel)