Proton Source Meeting March 12, 2003. Agenda MiniBooNE Champaign Goal Achieved What is it? Who did it? How was it done? WBS coming; Budget Codes going.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

Microsoft ® Office Outlook ® 2007 Training Manage your mailbox IV: Archive old messages P J Human Resources Pte Ltd presents:
TU/e Processor Design 5Z032 1 Processor Design 5Z032 The role of Performance Henk Corporaal Eindhoven University of Technology 2009.
Substitute FAQs SubFinder Overview. FAQs Do I have to have touch-tone service to use SubFinder? No, but you do need a telephone that can be switched from.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
CSC1016 Coursework Clarification Derek Mortimer March 2010.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Chapter 5 Project Planning
Chapter 4 Assessing and Understanding Performance
Development and Quality Plans
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Increasing Parent Involvement
Fermilab Computing Division 1 f Oracle Project Accounting System Implementation Overview.
Consider Aderant Expert Refresher Training
Meredith Hicks Personnel Specialist/ Substitutes Ext
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
The Center for IDEA Early Childhood Data Systems 2014 Improving Data, Improving Outcomes Conference September 9, 2014 Developing or Enhancing Business.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Transforming Financials at the People’s Department Financial Management Modernization Initiative (FMMI) APHIS Master Data Discussion July 2010.
Chapter 8 Resource Considerations
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
HUMAN RESOURCES TRAINING For SUPERVISORS July 8, 2003.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Tracking Non-Project Time in an Information Systems Department with Project Server Kelly Jones PMO Manager, Information Systems Sharp Healthcare.
1 CS/EE 362 Hardware Fundamentals Lecture 9 (Chapter 2: Hennessy and Patterson) Winter Quarter 1998 Chris Myers.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
Reports. Report Summary Warehouse Reports Returned Material Serial Numbers Not Found This report list the serial numbers of material returned which were.
Proton Source: Linac and Booster Elliott McCrory AAC Review February 4, 2003.
The Formal Mechanics of Project Management Work Breakdown Structure Capabilities Resources Resource Requirements Resource Assignments Scheduling and Critical.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Source July 21, 2006 E Prebys 1 Proton Plan Meeting Agenda:  Review of parameter list: Prebys, Kourbanis  Status of writing assignments Prebys,
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PAC Meeting, December 12, Prebys 1 The Problem.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
Week 2 - Wednesday CS 121.
Maintenance Scheduling
MAINTENANCE PLANNING AND SCHEDULING
Presentation transcript:

Proton Source Meeting March 12, 2003

Agenda MiniBooNE Champaign Goal Achieved What is it? Who did it? How was it done? WBS coming; Budget Codes going. Vacation Schedules & the Summer Shutdown

MiniBooNE Champaign Goal! 5.5 x protons delivered to the MiniBooNE target in 1 hour. 3.3 x ppp from Booster at >4 Hz 6.9 x protons per pulse from Linac

10 Days “Normal” Running

5.5 x Protons in 1 Hour 1 Hour

Who Did the Work? Drozhdin Created believable simulation (MAD) of Booster Lattice, with help from Tomlin. Ankenbrandt, Prebys, Popovic Immediately recognized importance of this prediction. Tomlin, Popovic, Ankenbrandt, Prebys, Chou, etc. Measured effect on the Booster lattice. Lackey and Pellico Successfully reduced the effect of the notch at 400 MeV. Lackey Suggested that we move MP01 out of the way and turn off one dog leg. Prebys Pushed to get this done. Tomlin Tuned and tuned and tuned, with help from Todd J., Yang Xi, Ops, etc.

Dog Legs NominalDog Legs down 40% Tune Shift from Dog Leg Change

Drozhdin/MAD Prediction No dog legs 3.2 m 1.8 m Dog legs on 7 m 0 m

MAD Prediction & Our Measurement H Dispersion Difference: Dog Legs at 100% and 60% Data

How Did They Do It? Dog Leg magnets severely change the booster lattice. Dispersion wave fouls things up, big-time! Confirmed the effect by changing Dog Leg intensity. Lackey: “If we can move one of the extraction septa out of the way and turn off that Dog Leg set, the effect should be reduced a lot and we should be able to push more beam through the Booster.” Moved MP01 out of the way and we (Tomlin) tuned on it for 36 hours.

Budget Codes: Out; WBS: In! Existing system, derived from Argonne system, is 35+ years old The rest of the world has move ahead. This has become a communication problem with DOE Program Office and the rest of the government. Switched to commercial budget software in 1990’s. This project started in 1995 But halted due to lack of money.

FAQ Why are we introducing Oracle Project Accounting (PA) at Fermilab? What are the key benefits for migrating to Oracle Project Accounting? When will the Project Accounting system be operational? What kind of training will I get for using Project Accounting? What is a WBS (Work Breakdown Structure)? Why don't the old budget codes get the job done? How will I know which project/task will replace my budget code? <<UPDATED How will I find my project/task if I get to the Stockroom, and only know my workpackage ? <<NEW I use Discoverer queries to get my financial data. How will that change? I use workpackages or budget codes in my local systems – how will that change? Will Project Accounting still use fund types to specify operating, plant, equipment and inventory? Will there still be B&R (Budget and Reporting) codes in Project Accounting? Will Organization Codes still be used in the new accounting system? Will Project Accounting use Cost Elements? Will the summary levels of costs (e.g. YA, YB) still be used? What information will I need to start the travel process? What information will I need to sign for a limo or to rent a vehicle?

Why Don’t Budget Codes Work Any More? When the laboratory was established, more than 30 years ago, the system of using 3-letter combinations as budget codes for tracking financial data was sufficient. In some cases, the 3 letters were a type of abbreviation for the work being done. It was also possible to have a general understanding of where a budget code belonged in the laboratory’s organizational structure because certain ranges of letters were loosely assigned to laboratory organizations. However, the financial reporting required by our funding agency has become increasingly more detailed and complicated over the years. This is especially true for the construction of new experiments and the improvement of existing experiments. These projects must be able to report at various “levels” of activity. This requires a system that will “roll up” budget and cost information to a summary level or “drill down” to a detailed level. With our existing financial system, each project is required to create a structure and reports outside of the accounting system to fulfill these requirements. The new Project Accounting software will have these features as part of the standard functionality. Also, over the years the laboratory has made many organizational changes. The loose mapping of a range of budget code letters to a particular organization has been lost. In the new WBS system, tasks (which replace budget codes) in the same organization will start with the same sequence of numbers. It will be easy to see what activities are related based on their WBS number.

What Does This Mean, Really? All Budget Codes become WBS number strings on 1-Apr-03 You cannot take anything out from stock without a magic number Cheat sheets will be available Pro Card holders may have some new hassles. Training for them will happen Real Soon Now. Taking a limo to the airport requires a new integer number. WBS-to-number “map”: Real Soon Now.

What Will WBS Codes Be? WBS: AA BB.CC.D.E.F.G.H AA: Division or major project BB: Division Beams = 20 AA equals BB unless you are NuMI or some other big project. CC: Department 2-digit number Proton Source Department = 17 Controls Department = 05 D: Projects within Beams Div. E: Run II Sub Projects F: Run II Upgrades (Projects) G: Run II Upgrades (Sub-Projects) H: Run II Upgrades Recycler (Sub-Sub-Projects)

Exact Mapping Out Next Week Proton Source: “ x” or “ x”. “ ” = FBO “ ” = FLO “ ” = FFH (Booster conference travel) “ ” = FFQ (Linac conference travel)

Vacation Planning, 2003 Likely start date for July shutdown: 7/28/03. Incompatible with directive to reduce vacation days by 1-Oct-03, of course. Do everything you can to have your vacation time consumed by the end of July. And tell me ASAP about 2+ weeks off. Your Floating Holiday does not count in your “Maximum Balance Permitted”