The Telescope (pointing) Pointing background Current pointing errors. Some problems with pointing. Can we point during the painting project. For more info:

Slides:



Advertisements
Similar presentations
Printer Maintenance Proper printer maintenance can prevent many problems and lessen the effects of others. Routine printer maintenance procedures vary.
Advertisements

FEAD Basics F = Q/R TT = F + TS TT Q=Torque Q=FxR Ts Where:
CH12.Problems JH.131. Take the lower center as rotation center then: M2 (L/4) = M3 (3L/4)  M2= 3 M3 Now the upper center: M1 (L/4) = (M2+M3)
directive antennas for small lots higher performance for larger lots
WEDGES AND FRICTIONAL FORCES ON FLAT BELTS
NAIC AUSAC Meeting – April 19-20, 2010 Telescope and Datataking status 2010 Visiting Committee Meeting Phil Perillat.
AOUC committee 03APR14 Telescope status & RFI 2014 AOUC committee Phil Perillat.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
WEDGES AND FRICTIONAL FORCES ON FLAT BELTS
4.2 Using Similar Shapes How can you use similar shapes to find unknown measures?
NAIC AOUC Meeting – April 25-26, 2012 Telescope and Datataking status 2012 Visiting Committee Meeting Phil Perillat.
Keck I Cassegrain ADC: Preliminary Design Overview UCO/Lick Observatory 15 October 2003.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
1 Grating Mount Requirements Weight:< 75 Lbs including grating (43.1 Lbs) Size:Fit within structural envelope. 1.5” for cell behind grating. Alignment:Adjust.
Types of angles A Z MLN – Horizontal angle ALM – Vertical angle
Teachers workshop 21feb09 arecibo observatory The Arecibo radio telescope 2009 teachers workshop Phil Perillat.
Students will be able to: a) Determine the forces on a wedge.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
 Background  Problem Statement  Solution  Mechanical › Azimuth › Elevation › Concepts › Static and Dynamics of System  Software › SatPC32 › Interpolation.
G EAR C LEAR T ECHNOLOGY CVT DESIGN GOALS Truly continuously variable Highly efficient Transmit torque both forward and backward Able to transmit high.
NAIC Visiting Committee Meeting · February 19-21, 2007 Telescope Performance 2007 Visiting Committee Meeting Phil Perillat.
General idea of a couple of check rod system and adjustments
10.2The Law of Sines Objectives: 1. Solve oblique triangles by using the Law of Sines. 2. Use area formulas to find areas of triangles.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
A Preliminary Design of the Rotator for the DES Simulator Stand February 28, 2008 Edward Chi Fermilab/PPD/MD.
Chapter 8Basic Computer Maintenance  8.1Preventive Maintenance 8.1Preventive Maintenance 8.1Preventive Maintenance  8.2Monitoring System Performance.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Link Budget Calculation
Test Review Pay attention. What is the difference between area and perimeter? PERIMETER- – Distance AROUND the edge of a figure – Measures in regular.
Using Similar Figures to Solve Problems. There are a variety of problems that can be solved with similar triangles. To make things easier use or draw.
NAIC AUSAC Committee Meeting · March Telescope Performance and Datataking 2009 AUSAC Committee Meeting Phil Perillat.
Space Space is basically divided into 3 parts: Foreground, Middle Ground and Background Generally, the background area is considered to be the upper 1/3.
NAIC Visiting Committee Meeting February 15-16, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Recent high frequency.
Images in Plane Mirrors
College of Optical Sciences The University of Arizona 1 APOMA Fall 2008 Workshop 11/17-11/18/08 Stages and rotary tables.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
SKA Dishes, SEEG Meeting Cape Town September 2013 SKA Dish Verification Antenna #1 – Test Plan Gary Hovey, DVA-1 Project Manger Astronomy Technology.
APRPP review committee 24oct13 Telescope status 2013 APRPP review committee Phil Perillat.
CoG and Speeding Building SPEED July 28, July-2011 Center of Gravity The Center of Gravity is the point where the object/figure balances Geometry.
NAIC Visiting Committee Meeting · April Telescope Performance and Datataking 2009 Visiting Committee Meeting Phil Perillat.
January 2008: Subaru Users' Meeting Current status of Subaru Telescope Summary –Some glitches are expected while leased computers are being replaced (February.
Electromagnetic Design of Broadband Antenna Feed Systems for the Northern Cross Radio Telescope (Bologna, Italy) Designed Broad Band Antenna Feed Systems.
Involving right triangles
Find out where you can find rand and randInt in your calculator. Write down the keystrokes.
Module 6Aberration and Doppler Shift of Light1 Module 6 Aberration and Doppler Shift of Light The term aberration used here means deviation. If a light.
*You will be able to find the lengths of sides of special right triangles And
8.2 Special Right Triangles. Side lengths of Special Right Triangles Right triangles whose angle measures are 45°-45°-90° or 30°- 60°-90° are called special.
Lines Identifying Different Types of Lines Next Type your name and send: Next.
ALFA Installation & Status Steve Torchinsky GALFA Meet3, Arecibo August 29, 2004.
AUSAC Meeting March 2-3, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Reflector alignment Recent high frequency results.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
Spring Board Unit 5 - Geometry.
LBT Q Engineering and Software Review ENGG Engineering General.
January 6, 2005 URSI Nation Radio Science Meeting, Boulder, CO. Pointing and Focusing the GBT K. T. Constantikes NRAO Green Bank.
RADAR ANTENNA. Functions of Radar Antenna Transducer. Concentrates the radiated energy in one direction (Gain). Collects echo energy scattered back to.
Geometry – Triangles and Trapezoids.  All Triangles are related to rectangles or parallelograms : Each rectangle or parallelogram is made up of two triangles!
HOW TO FIX MSVCR100. DLL IS MISSING ERROR? missing-error.
Physics book - Ch 9 Conceptual Book – Ch 11
Step IV - Engineering Jason Tarrant – Integration Engineering
3 + 2c³ Finding Areas of Triangles 4c
Metrology Improves Pointing at 12m ALMA Telescopes
Presenter Billy Fowler
WEDGES AND FRICTIONAL FORCES ON FLAT BELTS
Telescope Performance and Datataking
IR Upgrade Possibilities for PEP-II
LAW OF SINES SECTION 7-6 Jim Smith JCHS.
Revise No. 1.
The Troubleshooting theory
Robotics Lifting Things
Downloading to the NXT requires the correct hardware setup
Presentation transcript:

The Telescope (pointing) Pointing background Current pointing errors. Some problems with pointing. Can we point during the painting project. For more info:

Positioning specs BeamWidths: lband:200”, xband:30” A 1/8 inch offset at focus = 5” error. A 1 lambda motion in focus = 3 db gain loss 5 deg F moves the platform 1 inch vertically Adding weight to the platform: – 8/(24) kips lowers platform 1 inch tiedowns Retensioned/(Not retensioned ) Pointing model removes time invariant errors. Tiedowns, distomats used to remove time variable errors (from temperature changes).

The pointing model 13 term model in az & za with za lookup tbl. Current model created May 2004 after: –Alfa installation –Kevlar cables installed in dome –New compressors on dome –Dome side rollers tightened on 1 side Pointing errors immediately after the models: New pointing model needed after painting. DateAz err asecZa err asecTotal asec

AUSAC Meeting · January 16-17, 2007 Current pointing errors Pointing errors Jan06 to Sep06. –1 azimuth term in errors probably coming from a tiedown at the wrong height Could also be caused by weight being rearranged on the platform Appeared close to mar05 when td12 jack was replaced. –Structure in az errors  add an az encoder table

AUSAC Meeting · January 16-17, 2007 Some problems we’ve had 2005 distomat failures solved after distomat windows replaced. Az encoder failures sept,nov06 –Corrosion inside encoder –New encoders installed after fixing rfi –Re-installing encoder uses a mechanical index. A.1 inch error at 60 feet (index position) is a 5 asec error on the sky.

AUSAC Meeting · January 16-17, 2007 Tiedowns can lose tension when the dome points at or away from a tiedown. –27may04 calibratoin run. –10Am, 84degF, za=16.5 az=155. Sept06 A2221 (galfa HI halo clouds). –sat at az=0 and drove between za 12 and 19 deg. –Took data 8:30 to 9:30 am. Temp=80 F. – Lost tension on at least 7 days. Tiedowns losing tension

AUSAC Meeting · January 16-17, 2007 Tertiary drive to move between 2 positions New tertiary drive system to be installed during painting project. Move between standard and longer optical path (set and leave it). You lose some gain since out of focus. We need to: – figure out the new position and any pointing corrections it will entail. –The online software needs to be able to control this. –We need hardware indices to verify that things are in the correct position (in case of encoder failure).

AUSAC Meeting · January 16-17, 2007 How much torque to tilt Platform? (or can we paint and point..) Look at height of platform corners vs az sep06-dec06 –0 offset occurs when az perpendicular to tower. Fit line to points when azimuth points at a tower. Given dome, ch, and counterweight weight, compute the corner deflection vs torque. –cornerHghtIn= *torq(kip-ft). –Since corners are 124 feet from the center: platRotAngle(Amin)= *torque(kip-ft)

AUSAC Meeting · January 16-17, 2007 How much sky motion when platform rotates? Platform probably rotates about main cable connections. The sky angle gets larger as you move out in za (for a fixed platform rotation). You get about an 8 Asec pointing error for a 1000 kip-feet torque. This would be from placing 10 kips near the corner of the triangle. The result is linear in the torque. –The dome at 20 deg would give a 3 Amin error if the elevation rails were not shimmed.

AUSAC Meeting · January 16-17, 2007 Sband tx horn New sband transmit horn installed may06 –Wanted to over illuminate the tertiary. Increases the gain Increases Tsys (we don’t care for tx horn) Increases the kilowatts of power spilling over the tertiary. –The gain increased by about 4% (.4 K/Jy) New sband receive dewar/horn to be installed soon. …that’s it….